ML26015A532

From kanterella
Jump to navigation Jump to search
American Centrifuge Plant - Integrated Inspection Report 07007004/2025004
ML26015A532
Person / Time
Site: 07007004
Issue date: 01/21/2026
From: Nicholas Peterka
NRC/RGN-II/DFRSS/FOB1
To: Snider M
American Centrifuge Operating
References
IR 2025004
Download: ML26015A532 (0)


Text

Matt Snider, General Manager American Centrifuge Operating, LLC P.O. Box 628 Mail Stop 7560 Piketon, OH 45661

SUBJECT:

AMERICAN CENTRIFUGE PLANT - INTEGRATED INSPECTION REPORT 07007004/2025004

Dear Matt Snider:

This letter refers to the Nuclear Regulatory Commission (NRC) oversight activities conducted from October 1 to December 31, 2025, for the American Centrifuge Plant facility in Piketon, OH. During that time, the NRC did not conduct any inspection activities onsite that will be documented as part of the fourth quarter of calendar year 2025.

This letter and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Nicholas E. Peterka, Chief Fuels Oversight Branch 1 Division of Fuels, Radiological Safety, and Security Docket No.: 07007004 License No.: SNM2011

Enclosure:

As stated cc w/ encl: Distribution via LISTSERV January 21, 2026 Signed by Peterka, Nicholas on 01/21/26

M. Snider 2

SUBJECT:

AMERICAN CENTRIFUGE PLANT - INTEGRATED INSPECTION REPORT 07007004/2025004 DATED JANUARY 21, 2026 DISTRIBUTION:

J. Lara, RII Y. Faraz, NMSS S. Lav, NMSS L. Suggs, RII/DFRSS L. Pitts, RII/DFRSS N Peterka, RII/DFRSS J. Grice, RII/DFRSS R2EICS ADAMS Accession Number: ML26015A532

SUNSI Review

Non-Sensitive

Sensitive

Publicly Available

Non-Publicly Available OFFICE R-II/DFRSS R-II/DFRSS R-II/DFRSS NAME J. Grice L. Pitts N. Peterka DATE 01/16/2026 01/20/2026 01/21/2026 OFFICIAL RECORD COPY