Request for Information for NRC Post-Approval Site Inspection for License Renewal Phase 2 Inspection Report 05000455/2026010
ML26014A240
Person / Time
Site: Byron 
Issue date: 01/14/2026
From: James Park
NRC/RGN-III/DORS/ERPB
To: Mudrick C
Constellation Energy Generation
References
IR 2026010
Download: ML26014A240 (0)


See also: IR 05000455/2026010

Text

Christopher H. Mudrick

Senior Vice President

Constellation Energy Generation, LLC

President and Chief Nuclear Officer (CNO)

Constellation Nuclear

200 Energy Way, KSA-3N

Kennett Square, PA 19348

SUBJECT:

BYRON STATION, UNIT 2, REQUEST FOR INFORMATION FOR NRC

POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL, PHASE 2,

INSPECTION REPORT 05000455/2026010

Dear Christopher H. Mudrick:

On May 18, 2026, the U.S. Nuclear Regulatory Commission (NRC) will begin a

Post-Approval Site Inspection for License Renewal, Phase 2, at Byron Station, Unit 2. This

inspection will be performed in accordance with NRC Inspection Procedure (IP) 71003. This

inspection will focus on verifying that license conditions added as part of your renewed

license and a sample of license renewal commitments have been implemented.

To minimize the inspection impact on the site and to ensure a productive inspection for

both parties, we have enclosed a request for information needed for the inspection. It is

important that all these documents are up-to-date and complete to minimize the number of

additional documents requested during the preparation and/or the on-site portions of the

inspection. Information should be provided electronically. This information request has been

divided into two groups:

The first group lists information necessary for our initial inspection scoping and in-office

preparation activities. During the in-office preparation activities, the inspector will

identify as much as possible the information and activities to be reviewed during the

inspection. This information should be provided to the inspector by April 13, 2026.

The second group includes the additional information required for the inspector to review

the selected activities. This information should be available to the inspector 1 week

before arriving onsite or May 11, 2026. It is also requested that corrective action

documents and/or questions developed during the inspection be provided to the

inspector as the documents are generated.

The lead inspector for this license renewal inspection is Joon Park. We understand that our

primary contact for this inspection is Gerald Armstrong of your organization. If there are any

questions about the inspection or the material requested in the enclosure, please contact

the lead inspector at 630-829-9715 or via email at Joon.Park@nrc.gov.

January 14, 2026

C. Mudrick

2

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget Control

Number.

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections,

Exemptions, Requests for Withholding.

Sincerely,

Joon S. Park

Engineering and Reactor Projects Branch

Division of Operating Reactor Safety

Docket No. 50-455

License No. NPF-66

Enclosure:

Document Request for Post-Approval

Site Inspection for License Renewal

cc: Distribution via LISTSERV

Signed by Park, Joon

on 01/14/26

C. Mudrick

3

Letter to Christopher H. Mudrick from Joon S. Park dated January 14, 2026.

SUBJECT:

BYRON STATION, UNIT 2, REQUEST FOR INFORMATION FOR NRC

POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL, PHASE 2,

INSPECTION REPORT 05000455/2026010

DISTRIBUTION:

Rodney Clagg

RidsNrrDorlLpl3

RidsNrrPMByron Resource

RidsNrrDroIrib Resource

Mohammed Shuaibi

Diana Betancourt-Roldan

Deborah Piskura

Shelbie Lewman

Jennifer Dalzell

R3-DORS

ADAMS Accession Number: ML26014A240

Publicly Available

Non-Publicly Available

Sensitive

Non-Sensitive

OFFICE

RIII

NAME

JPark:gmp

DATE

01/14/2026

OFFICIAL RECORD COPY

DOCUMENT REQUEST FOR POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL

Enclosure

Inspection Report: 05000455/2026010

Inspection Dates:

May 18, 2026 - June 5, 2026

Inspection Procedures:

IP 71003 Post-Approval Site Inspection for License Renewal

Phase 2

Lead Inspector:

Joon S. Park

Senior Reactor Inspector

DORS/ERPB

630-829-9715

Joon.Park@nrc.gov

I.

Information Requested Prior to the Inspection Preparation Week

The following information is requested by April 13, 2026, or sooner, to facilitate

inspection preparation. If you have any questions regarding this information, please

contact the team leader. (Please provide the information electronically in PDF files,

Excel, or other searchable formats, preferably on station/corporate online portal for

document sharing. The electronic information should be identified by unit, contain

descriptive names, and be indexed and hyperlinked to facilitate ease of use.

Information in lists should contain enough information to be easily understood by

someone who has knowledge of light-water reactor technology.)

1.

Provide a list of your license renewal commitments with an approximate completion

status of each.

2.

Provide a list of your Aging Management Programs (AMPs), copies of associated

program basis documents, and a listing of the action tracking items for each.

3.

For AMPs that are one-time inspection programs, provide a list of completed work

order numbers for inspections that have been completed. This may be incorporated

with the previous item and should include identification of the inspected component.

4.

Provide current management and license renewal organizational charts.

5.

Provide electronic copies of any internal/external self-assessments and associated

corrective action documents generated in preparation for the inspection.

II.

Information Requested to Be Available One Week Prior to Inspectors Arrival

On-Site, or May 11, 2026

1.

Documentation demonstrating completion of license renewal commitments

completed as of the inspection date. For example, this may be in the form of a binder

for each commitment which includes the implementing documentation and

references.

DOCUMENT REQUEST FOR POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL

2

III.

Information Requested to Be Provided Throughout the Inspection

1.

Copies of any corrective action documents generated from inspector questions or

queries during this inspection.

2.

Copies of the list of questions submitted by the team members and the

status/resolution of the information requested (provide daily during the inspection to

each team member).

If you have any questions regarding the information requested, please contact the lead