Form 2.3-1 Examination Outline Quality Checklist Facility: Diablo Canyon Date of Examination: 10/27/2025 Item Task Description (Y)es/(N)o a

b*

c#

a. The outline was systematically and randomly prepared in accordance with the y

z instructions in Section B of ES-4.1,.and all knowledge and ability (KIA) categories are y

w i::

appropriately sampled.

i

b. The outline does not overemphasize any systems, evolutions, or generic topics.

y y

y

c. Justifications for deselected or rejected KJA statements are acceptable.

y y

y

a. Using Form 3.4-1, Events and Evolutions Checklist, verify that the proposed scenario y

y y

set contains the required number of normal evolutions, reactivity evolutions, instrument and component failures, manual control evolutions, technical specifications, and major transients.

0:::

b. There are enough scenarios (and spares) for the projected number and mix of y

y y

§ applicants in accordance with the expected crew composition and rotation schedule without compromising exam integrity. Ensure that scenarios will not be repeated on

~

subsequent days.

1i5 C. Ensure that all scenarios are new or significantly modified in accordance with ES-3.4 y

y y

and that no scenarios are duplicated from the applicants' audit test(s).

d. To the extent possible, assess whether the outline(s) confonns with the qualitative and y

y y

quanti1ative simulator set criteria specified on Form 2.3-2.

a. Verify that the administrative outline meets the criteria specified in the instructions on y

y y

Form 3.2-1 and that no tasks are duplicated from the applicants' audit test(s).

b. Verify that the control room and in-plant systems outline meets the criteria specified in y

y y

Cl) the instructions on Form 3.2-2 and that no tasks are duplicated from the applicants'

~

0.

audit lesl(s).

C. Determine whether the number of job performance measures (JPMs) and JPM types is y

y y

sufficient for the projected number and mix of applicants and ensure that no items are duplicated on subsequent days.

a. Assess whether the appropriate exam sections cover plant-specific priorities (including y

y y

probabilistic risk assessment and individual plant examination insights).

b. Assess whether the 10 CFR 55.41, 10 CFR 55.43, and 10 CFR 55.45 sampling is y

y y

..J appropriate.

<(

c. Check whether KIA importance ratings (except for plant-specific priorities) are greater y

y 0:::

y UJ z than or equal to 2.5.

UJ

d. Check for duplication and overlap across the exam and with the last two NRC exams.

y y

y

(!)

e. Check the entire exam for balance of coverage.

y y

y

f. Assess whether the exam fits the appropriate job level (reactor operator or senior y

y y

reactor operator).

Prin~ e m1~/ L i al~

Date

a. Author Lisa Toribio /

~ / I~ I :J..S

b. Facility Reviewer (*)

Chris Mehioan / I ~/_

~~I *. r

c. NRG Reviewer(#)

David You z;;.,:,,'-/ Uau 10/9/25 NRC Chief Examiner David You D.~-

'JU~u-10/9/25 NRG Supervisor JO'-."' ~ \rl.:. ldll\d /Cll.),.., fJ<

,....../

/0 (14 '25

  • The facility licensee signature is not applicable for NRC-dl~oped tests.
  1. An independent NRC reviewer performs the steps in colun 'c.
  • This may be the NRC Chief Examiner if he/she did not develop the outline under review.

Form 2.3-4 Written Examination Quality Checklist Facility: Diablo Canyon Date of Exam: 10/27/2025 Exam Level:

RO

  • ~

SRO~

Item Description (Y)es / (N)o a

b*

c#

1.

Questions and answers are technically accurate and applicable to the facility. Each question y

includes a technical reference.

y y

2.
a. All questions reference NRC knowledge and abilities (K/As) requirements.
b. Facility learning objectives are referenced as available.

y y

y

c. All Questions include an explanation of the correct answer explanation and a distractor analvsis.
3.

Senior reactor operator (SRO) questions test at the SRO license level.

y y

y

4.

The sampling process was random and systematic. (If more than four reactor operator (RO) or two SRO questions were repeated from the last two NRC licensing exams, including full y

y y

(100-question) retake examinations, consult the NRC Office of Nuclear Reactor Regulation operator licensinq proqram office.}

5.

Question duplication from the licensee screening/audit exam was controlled as indicated below (check the item that applies) and appears appropriate:

_ The audit exam was systematically and randomly developed.

_ The audit exam was completed before the license exam was started.

y y

y

_ The examinations were developed independently.

~

The licensee certifies that there is no duplication.

Other (exolainl:

6.

Bank use meets limits (no more than 75% from the bank, at least Bank Modified New 10% new (at the comprehension/analysis level), and the rest new or modified); enter the actual RO/SRO-only question distribution >

32/10 4/1 39/14 y

y y

7.

Between 38 and 45 questions of the questions on the RO exam and Memory CIA at least 13 of the questions on the SRO-only portion of the exam are written at the comprehension/analysis level; enter the actual 37/7 38/18 y

y y

RO/SRO-only question distribution >

8.

References/handouts provided do not give away answers or aid in the elimination of distractors.

y y

y

9.

Question content conforms to specific KIA statements in the previously approved examination y

y y

outline and is appropriate for the K/A statements' assiqned lier; deviations are justified.

10. Question psychometric quality and format meet the instructions and guidelines in ES-4.2.

y y

y

11. The exam contains the required number of one-point, multiple-choice items; the total is correct y

y y

and agrees with the value on the cover sheet.

Printed Namet{*gn lure Date

a.

Author Kenneth Smith/

~

10/09/2025

b.

Facility Reviewer (*)

Chris Mehigan/

~~

10/09/2025 C.

NRC Reviewer (#)

David You z;;t:UHdau 10/14/25 NRC Chief Examiner David You z;;~e.lt1-u 10/14/25 NRC Regional Supervisor

..)Olr.lf\. ~,r-1:::. ta,,_d A2f:i. 7~

~-=:)

ID{ t4-'2.S

  • The facility licensee signature is not applicable for NRC-develop;ttit ts.

~

  1. An independent NRC reviewer performs steps in column c. This be the NRC Chief Examiner if he/she did not develoo the written examination under review.

Form 2.3-2 Operating Test Quality Checklist Facility: Diablo Canyon Date of Examination: 10/27/2025 OperatinQ Test Number: L241 General Criteria (Y)es / (No a

b*

d'

a.

The operating test meets the criteria on the associated test outline.

y y

b.

There are enough test items so that test items will not be repeated on more than 1 day of y

y y

the operating test.

c.

The operating test does not duplicate items from the applicants' audit test(s).

y y

y

d. Overlap with the written examination and between different parts of the operating test is y

y y

minimized.

e. II appears that the operating test will differentiate between competent and y

y y

less-than-competent applicants al the designated license level.

Walkthrouqh Criteria

a.

Each job performance measure (JPM) includes the following, as applicable:

y y

y

. task standard

. initial conditions

. initiating cues

. references and tools, including associated procedures

. reasonable and validated lime limits (average time allowed for completion) and specific designation if the facility licensee deems it to be time critical

. alternate path JPMs are labeled as "alternate path"

. operationally important specific performance criteria that include the following:

detailed expected actions with exact criteria and nomenclature system response and other examiner cues statements describing important observations to be made by the applicant criteria for successful completion of the JPM task standard identification of critical steps and their associated performance standards restrictions on the seauence of steps, if applicable

b. Ensure that any changes from the previously approved JPM outlines (Fonns 3.2-1 and 3.2-2) y y

y have not caused the test to deviate from any of the acceptance criteria (e.g., item distribution, bank use, repetition from the last two NRC examinations) specified on those forms.

Simulator Scenario Set Criteria for Scenario Numbers: 1 / 2 / 3 QUALITATIVE ATTRIBUTES

1.

The initial conditions are realistic in that some equipment and/or instrumentation may be y

y y

out of service, but it does not cue the operators into expected events.

2. The scenarios consist mostly of related events.

y y

y

3.

Each event description consists of the following:

y y

y the point in the scenario when ii is to be initiated the malfunction(s} or conditions that are entered to initiate the event the symptoms/cues that will be visible to the crew the expected operator actions (by shift position}

the event termination point (if applicable)

Y

QUALITATIVE ATTRIBUTES (continued) a

{Y)es I (N)o b*

c#

4.

The events are valid with regard to physics and thermodynamics.

y y

y

5.

The sequencing and timing of events is reasonable and allows the examination team to y

y y

observe and evaluate applicant performance.

6.

If time compression techniques are used, the scenario summary clearly so indicates.

y y

y Operators have sufficient lime to carry out expected activities without undue lime constraints. Cues are given.

7.

The simulator modeling is not altered.

y y

y

8. The scenarios have been validated. Pursuant to 10 CFR 55.46(d), any open simulator performance deficiencies or deviations from the referenced plant have been evaluated to y

y y

ensure that functional fidelity is maintained while running the planned scenarios.

9. Scenarios are new or significantly modified in accordance with ES-3.4.

y y

y

10. Scenarios (as grouped) allow each applicant to be significantly involved in the minimum y

y y

number of transients, events, and evolutions specified on the version of Form 3.4-1 submitted with the scenario set.

11. Applicants are evaluated on a similar number of preidentified critical tasks across y

y y

scenarios, when possible.

12. The level of difficulty is appropriate to support licensing decisions for each crew position.

y y

y Actual Attributes by (Y)es / (N)o TARGET QUANTITATIVE ATTRIBUTES per Scenario (See ES-3.4)

Scenario No.

1/2/3/4/5/6 a

b*

c#

1.

Malfunctions after emergency operating procedure (EOP) 2/2/1/1/2/1 y

y y

entry (1-2)

2.

Abnormal events (2-4) 2/5/4/4/3/4 y

y y

3.

Major transients (1-2) 2/1/1/1/1/2 y

y y

4.

EOPs entered/requiring substantive actions (1-2) 2/2/2/3/3/2 y

y y

5.

Entry into a contingency EOP with substantive actions 0/1/1/1/2/0 y

y y

E: 1 per scenario set; set Is the entire set of scenarios prepared for the scheduled exam)

6.

Preidentified critical tasks (?. 2) 2/2/2/2/2/3 y

y y

Printed Name/Signature Date

a.

Author Lisa Toribio/~ C\tirt. /_:,,J

'i<ltol?

) ;d:-

I I

b.

Facility Reviewer ("}

Chris Mehican /

/.,....------

~,.. a.r C.

NRC Reviewer (#)

David You i?twd 1Ju 10/9/25 NRC Chief Examiner David You i?twd ~ u 10/9/25 NRC Supervisor JohV'l ILtrLb"'J;e;/-ft r-1..~_ {: _,)

10/14 / 25

  • The facility licensee signature is not applicable for ~

developed tests.

  1. An independent NRC reviewer performs the steps in column c. This may be the NRC Chief Examiner if he/she did not develoo the ooeratino test under review.

ES-3.4 Events and Evolutions Checklist Form 3.4-1 Group 1 (SRO-I1, SRO-I2, RO-1, RO-2)

Facility: Diablo Canyon Date of Exam: 10/27/2025 Operating Test Number: L241 A

P P

L I

C A

N T

E V

E N

T T

Y P

E Scenarios Scenario S6 Scenario S3 Scenario S4 T

O T

A L

M I

N I

M U

M*

CREW POSITION CREW POSITION CREW POSITION CREW POSITION S

R O

A T

C B

O P

S R

O A

T C

B O

P S

R O

A T

C B

O P

S R

O A

T C

B O

P RO I

U RO SRO-I1 SRO-U RX 1

1 0

NOR 1

1 1

I/C 1,2,3,4,7 1,2,3,4,6 1,2,4,6 14 4

4 2

MAJ 5,6 5

5 4

2 2

1 MAN CTL 1,6 2

1 1

0 TS 1,2 1,3 4

0 2

2 RO SRO-I2 SRO-U RX 1

1 0

NOR 1

1 1

I/C 1,2,3 1,2,3,4,6 8 4

4 2

MAJ 5,6 5

3 2

2 1

MAN CTL 1,4 2

1 1

0 TS 2,4 2

0 2

2 RO-1 SRO-I SRO-U RX 1

1 0

NOR 1

1 1

I/C 2,3,4,7 2,3,4,6 8 4

4 2

MAJ 5,6 5

3 2

2 1

MAN CTL 2,3 2

1 1

0 TS 0

2 2

RO-2 SRO-I SRO-U RX 1

1 0

NOR 1

1 1

I/C 1,2,6 2,3,4 6

4 4

2 MAJ 5

5 2

2 2

1 MAN CTL 3

1 1

1 0

TS 0

2 2

Form 3.4-1 Instructions for the Events and Evolutions Checklist

1. Mark the applicant license level for each simulator operating test number.
2. For the set of scenario columns, fill in the associated event number from Form 3.3-1, Scenario Outline, to show the specific event types being used for the applicant while in the assigned crew position for that scenario.
  • Minimums are subject to the instructions in Section C.2, License Level Criteria.

KEY: RX = Reactivity Manipulation; NOR = Normal Evolution; I/C = Instrument/Component Failure; MAJ = Major Transient; Man. Ctrl =

Manual Control of Automatic Function; TS = Technical Specification Evaluation; RO = Reactor Operator; SRO-I or I = Instant Senior Reactor Operator; SRO-U or U = Upgrade Senior Reactor Operator; SRO = Senior Reactor Operator; ATC = At the Controls; and BOP

= Balance of Plan Rev 1

ES-3.4 Events and Evolutions Checklist Form 3.4-1 Group 2 (SRO-I3, SRO-I4, RO-3, RO-4)

Facility: Diablo Canyon Date of Exam: 10/27/2025 Operating Test Number: L241 A

P P

L I

C A

N T

E V

E N

T T

Y P

E Scenarios Scenario S6 Scenario S3 Scenario S4 T

O T

A L

M I

N I

M U

M*

CREW POSITION CREW POSITION CREW POSITION CREW POSITION S

R O

A T

C B

O P

S R

O A

T C

B O

P S

R O

A T

C B

O P

S R

O A

T C

B O

P RO I

U RO SRO-I3 SRO-U RX 1

1 0

NOR 1

1 1

I/C 1,2,3,4,7 1,2,3,4,6 1,2,4,6 14 4

4 2

MAJ 5,6 5

5 4

2 2

1 MAN CTL 1,6 2

1 1

0 TS 1,2 1,3 4

0 2

2 RO SRO-I4 SRO-U RX 1

1 0

NOR 1

1 1

I/C 1,2,3 1,2,3,4,6 8 4

4 2

MAJ 5,6 5

3 2

2 1

MAN CTL 1,4 2

1 1

0 TS 2,4 2

0 2

2 RO-3 SRO-I SRO-U RX 1

1 0

NOR 1

1 1

I/C 2,3,4,7 2,3,4,6 8 4

4 2

MAJ 5,6 5

3 2

2 1

MAN CTL 2,3 2

1 1

0 TS 0

2 2

RO-4 SRO-I SRO-U RX 1

1 0

NOR 1

1 1

I/C 1,2,6 2,3,4 6

4 4

2 MAJ 5

5 2

2 2

1 MAN CTL 3

1 1

1 0

TS 0

2 2

Form 3.4-1 Instructions for the Events and Evolutions Checklist

1. Mark the applicant license level for each simulator operating test number.
2. For the set of scenario columns, fill in the associated event number from Form 3.3-1, Scenario Outline, to show the specific event types being used for the applicant while in the assigned crew position for that scenario.
  • Minimums are subject to the instructions in Section C.2, License Level Criteria.

KEY: RX = Reactivity Manipulation; NOR = Normal Evolution; I/C = Instrument/Component Failure; MAJ = Major Transient; Man. Ctrl =

Manual Control of Automatic Function; TS = Technical Specification Evaluation; RO = Reactor Operator; SRO-I or I = Instant Senior Reactor Operator; SRO-U or U = Upgrade Senior Reactor Operator; SRO = Senior Reactor Operator; ATC = At the Controls; and BOP

= Balance of Plan Rev 1

ES-3.4 Events and Evolutions Checklist Form 3.4-1 Group 3 (SRO-I5, SRO-I6, RO-5, RO-6)

Facility: Diablo Canyon Date of Exam: 10/27/2025 Operating Test Number: L241 A

P P

L I

C A

N T

E V

E N

T T

Y P

E Scenarios Scenario S6 Scenario S2 Scenario S4 T

O T

A L

M I

N I

M U

M*

CREW POSITION CREW POSITION CREW POSITION CREW POSITION S

R O

A T

C B

O P

S R

O A

T C

B O

P S

R O

A T

C B

O P

S R

O A

T C

B O

P RO I

U RO SRO-I5 SRO-U RX 1

1 0

NOR 1

1 1

I/C 1,2,3,4,7 3,4,6,8 1,2,3,4,6 14 4

4 2

MAJ 5,6 7

5 4

2 2

1 MAN CTL 3,4,8 3

1 1

0 TS 1,2 2,4 4

0 2

2 RO SRO-I6 SRO-U RX 1

1 0

NOR 1

1 1

I/C 1,2,3 1,2,3,4,5, 6,8 10 4

4 2

MAJ 5,6 7

3 2

2 1

MAN CTL 1,4 2

1 1

0 TS 1,3 2

0 2

2 RO-5 SRO-I SRO-U RX 1

1 0

NOR 1

1 1

I/C 2,3,4,7 2,3,4 7

4 4

2 MAJ 5,6 5

3 2

2 1

MAN CTL 3

1 1

1 0

TS 0

2 2

RO-6 SRO-I SRO-U RX 1

1 0

NOR 1

1 1

I/C 1,2,5,6 1,2,4,6 8 4

4 2

MAJ 7

5 2

2 2

1 MAN CTL 1

1,6 3

1 1

0 TS 0

2 2

Form 3.4-1 Instructions for the Events and Evolutions Checklist

1. Mark the applicant license level for each simulator operating test number.
2. For the set of scenario columns, fill in the associated event number from Form 3.3-1, Scenario Outline, to show the specific event types being used for the applicant while in the assigned crew position for that scenario.
  • Minimums are subject to the instructions in Section C.2, License Level Criteria.

KEY: RX = Reactivity Manipulation; NOR = Normal Evolution; I/C = Instrument/Component Failure; MAJ = Major Transient; Man. Ctrl =

Manual Control of Automatic Function; TS = Technical Specification Evaluation; RO = Reactor Operator; SRO-I or I = Instant Senior Reactor Operator; SRO-U or U = Upgrade Senior Reactor Operator; SRO = Senior Reactor Operator; ATC = At the Controls; and BOP

= Balance of Plan Rev 2

ES-3.4 Events and Evolutions Checklist Form 3.4-1 Group 4 (SRO-I7, SRO-I8, RO-7, RO-8)

Facility: Diablo Canyon Date of Exam: 10/27/2025 Operating Test Number: L241 A

P P

L I

C A

N T

E V

E N

T T

Y P

E Scenarios Scenario S6 Scenario S2 Scenario S3 T

O T

A L

M I

N I

M U

M*

CREW POSITION CREW POSITION CREW POSITION CREW POSITION S

R O

A T

C B

O P

S R

O A

T C

B O

P S

R O

A T

C B

O P

S R

O A

T C

B O

P RO I

U RO SRO-I7 SRO-U RX 1

1 0

NOR 1

1 1

I/C 1,2,3,4,7 3,4,6,8 1,2,3,4,6 14 4

4 2

MAJ 5,6 7

5 4

2 2

1 MAN CTL 3,4,8 3

1 1

0 TS 1,2 1,3 4

0 2

2 RO SRO-I8 SRO-U RX 1

1 0

NOR 1

1 1

I/C 1,2,3 1,2,3,4,5, 6,8 10 4

4 2

MAJ 5,6 7

3 2

2 1

MAN CTL 1,4 2

1 1

0 TS 1,3 2

0 2

2 RO-7 SRO-I SRO-U RX 1

1 0

NOR 1

1 1

I/C 2,3,4,7 2,3,4,6 8 4

4 2

MAJ 5,6 5

3 2

2 1

MAN CTL 2,3 2

1 1

0 TS 0

2 2

RO-8 SRO-I SRO-U RX 1

1 0

NOR 1

1 1

I/C 1,2,5,6 1,2,6 7

4 4

2 MAJ 7

5 2

2 2

1 MAN CTL 1

1 1

1 0

TS 0

2 2

Form 3.4-1 Instructions for the Events and Evolutions Checklist

1. Mark the applicant license level for each simulator operating test number.
2. For the set of scenario columns, fill in the associated event number from Form 3.3-1, Scenario Outline, to show the specific event types being used for the applicant while in the assigned crew position for that scenario.
  • Minimums are subject to the instructions in Section C.2, License Level Criteria.

KEY: RX = Reactivity Manipulation; NOR = Normal Evolution; I/C = Instrument/Component Failure; MAJ = Major Transient; Man. Ctrl =

Manual Control of Automatic Function; TS = Technical Specification Evaluation; RO = Reactor Operator; SRO-I or I = Instant Senior Reactor Operator; SRO-U or U = Upgrade Senior Reactor Operator; SRO = Senior Reactor Operator; ATC = At the Controls; and BOP

= Balance of Plan Rev 2

ES-3.4 Events and Evolutions Checklist Form 3.4-1 Group 5 (SRO-I9, SRO-I10, RO-9, RO-10)

Facility: Diablo Canyon Date of Exam: 10/27/2025 Operating Test Number: L241 A

P P

L I

C A

N T

E V

E N

T T

Y P

E Scenarios Scenario S2 Scenario S3 Scenario S4 T

O T

A L

M I

N I

M U

M*

CREW POSITION CREW POSITION CREW POSITION CREW POSITION S

R O

A T

C B

O P

S R

O A

T C

B O

P S

R O

A T

C B

O P

S R

O A

T C

B O

P RO I

U RO SRO-I9 SRO-U RX 1

1 0

NOR 1

1 1

I/C 3,4,6,8 1,2,3,4,6 1,2,3,4,6 14 4

4 2

MAJ 7

5 5

3 2

2 1

MAN CTL 3,4,8 3

1 1

0 TS 1,3 2,4 4

0 2

2 RO SRO-I10 SRO-U RX 1

1 0

NOR 1

1 1

I/C 1,2,3,4,5, 6,8 2,3,4,6 11 4

4 2

MAJ 7

5 2

2 2

1 MAN CTL 2,3 2

1 1

0 TS 1,3 2

0 2

2 RO-9 SRO-I SRO-U RX 1

1 0

NOR 1

1 1

I/C 1,2,6 2,3,4 6

4 4

2 MAJ 5

5 2

2 2

1 MAN CTL 3

1 1

1 0

TS 0

2 2

RO-10 SRO-I SRO-U RX 1

1 0

NOR 1

1 1

I/C 1,2,5,6 1,2,4,6 8 4

4 2

MAJ 7

5 2

2 2

1 MAN CTL 1

1,6 3

1 1

0 TS 0

2 2

Form 3.4-1 Instructions for the Events and Evolutions Checklist

1. Mark the applicant license level for each simulator operating test number.
2. For the set of scenario columns, fill in the associated event number from Form 3.3-1, Scenario Outline, to show the specific event types being used for the applicant while in the assigned crew position for that scenario.
  • Minimums are subject to the instructions in Section C.2, License Level Criteria.

KEY: RX = Reactivity Manipulation; NOR = Normal Evolution; I/C = Instrument/Component Failure; MAJ = Major Transient; Man. Ctrl =

Manual Control of Automatic Function; TS = Technical Specification Evaluation; RO = Reactor Operator; SRO-I or I = Instant Senior Reactor Operator; SRO-U or U = Upgrade Senior Reactor Operator; SRO = Senior Reactor Operator; ATC = At the Controls; and BOP

= Balance of Plan Rev 2

ES-3.4 Events and Evolutions Checklist Form 3.4-1 Group 6 (SRO-U1, RO-11, RO-12)

Facility: Diablo Canyon Date of Exam: 10/27/2025 Operating Test Number: L241 A

P P

L I

C A

N T

E V

E N

T T

Y P

E Scenarios Scenario S2 Scenario S5 T

O T

A L

M I

N I

M U

M*

CREW POSITION CREW POSITION CREW POSITION CREW POSITION S

R O

A T

C B

O P

S R

O A

T C

B O

P S

R O

A T

C B

O P

S R

O A

T C

B O

P RO I

U RO SRO-I SRO-U1 RX 4

1 1

1 0

NOR 1

1 1

I/C 1,2,3,4,5, 6,8 1,2,3,6,7 12 4

4 2

MAJ 7

5 2

2 2

1 MAN CTL 0

1 1

0 TS 1,3 1,2 4

0 2

2 RO-11 SRO-I SRO-U RX 4

1 1

1 0

NOR 1

1 1

I/C 1,2,5,6 1,2,6,7 8 4

4 2

MAJ 7

5 2

2 2

1 MAN CTL 1

7 2

1 1

0 TS 0

2 2

RO-12 SRO-I SRO-U RX 4

1 1

1 0

NOR 1

1 1

I/C 3,4,6,8 2,3,6,7 8 4

4 2

MAJ 7

5 2

2 2

1 MAN CTL 3,4,8 6

4 1

1 0

TS 0

2 2

RO SRO-I SRO-U RX 1

1 0

NOR 1

1 1

I/C 4

4 2

MAJ 2

2 1

MAN CTL 1

1 0

TS 0

2 2

Form 3.4-1 Instructions for the Events and Evolutions Checklist

1. Mark the applicant license level for each simulator operating test number.
2. For the set of scenario columns, fill in the associated event number from Form 3.3-1, Scenario Outline, to show the specific event types being used for the applicant while in the assigned crew position for that scenario.
  • Minimums are subject to the instructions in Section C.2, License Level Criteria.

KEY: RX = Reactivity Manipulation; NOR = Normal Evolution; I/C = Instrument/Component Failure; MAJ = Major Transient; Man. Ctrl =

Manual Control of Automatic Function; TS = Technical Specification Evaluation; RO = Reactor Operator; SRO-I or I = Instant Senior Reactor Operator; SRO-U or U = Upgrade Senior Reactor Operator; SRO = Senior Reactor Operator; ATC = At the Controls; and BOP

= Balance of Plan Rev 2

EXAM ASSIGNMENT TICKLER Chief:

David You Facility:

DC 11/14/2025 App count 14 / 10 / 1 Start of Op Test:

10/27/2025 11/7/2025 Due Date Date Complete Initials 2/24/2025 10/2/2024 3/31/2025 10/2/2024 3/31/2025 10/2/2024 3/31/2025 8/6/2025 3/31/2025 10/2/2024 4/14/2025 10/2/2024 5/26/2025 5/22/2025 6/9/2025 5/27/2025 7/21/2025 N/A N/A 8/11/2025 8/11/2025 ddy 8/25/2025 8/25/2025 ddy 9/8/2025 9/10/2025 ddy 9/8/2025 9/19/2025 ddy 9/29/2025 9/29/2025 ddy 9/15/2025 9/15/2025 ddy 10/6/2025 9/29/2025 ddy 10/13/2025 10/13/2025 ddy 10/20/2025 10/17/2025 ddy 10/20/2025 N/A 10/20/2025 10/17/2025 ddy 10/20/2025 10/17/2025 ddy 10/20/2025 10/20/2025 ddy 10/27/2025 10/27/2025 ddy 11/14/2025 11/14/2025 ddy 12/4/2025 11/17/2025 ddy 12/12/2025 12/1/2025 ddy 12/12/2025 12/1/2025 ddy 12/19/2025 12/1/2025 ddy 12/26/2025 12/9/2025 ddy 1/2/2026 12/9/2025 ddy 1/2/2026 12/9/2025 ddy 1/2/2026 12/9/2025 ddy 1/23/2026 TBD ddy 1/30/2026 pending ddy 2/6/2026 12/10/2025 ddy 3/6/2026 12/10/2025 ddy Rev. 12 21 days after proposed denial letters mailed.

Preliminary license applications, including any waiver/excusal requests, due (ES-2-2 C.1).

NRC Forms 398/396-Facility licensee management feedback on the examination requested by the NRC supervisor (C.10).

Operating test outlines reviewed by the NRC and feedback provided to the facility licensee (ES-2.3).

Form 2.3-1 signed by CE & BC Preliminary waiver/excusal requests due (ES-2.2 E.1).

Proposed examinations (written, JPMs, and scenarios, as applicable) and outline forms; quality checklists and supporting documentation (including Forms 2.3-2 and 2.3-4 and any Form 2.3-1, 1.3-1, and 3.4-1 updates); and reference materials due.

Written examination and operating test reviews completed (ES-2.3). The NRC supervisors authorization to proceed with the facility review granted (ES-2.3 D).

Written examinations and operating tests approved by the NRC supervisor (C.9)

Administer Operating Test NRC examiners and facility licensee contact assigned (B.1 and C.1-3)

Facility licensee contact briefed on examination security and other requirements (D.4). As applicable, the facility licensee contact submits to the NRC any prescreened K/As for elimination from the written examination outline, with a description of the facility licensees prescreening process (ES-4.1 A.1.a and ES-4.1 B.2).

Operating test outlines and checklists due: Forms 1.3-1, 2.3-1, 3.2-1, 3.2-2, 3.3-1, and 3.4-1, as applicable (B.6). Facility licensee provides a draft operating test administration schedule to the NRC (B.18).

Reference material due for NRC prepared examinations (F)

Examination kick-off call held (C.4). The NRC sends the corporate notification letter (A.5)

Letter 2.1-1 produced by CE Written examination outline developed by the NRC and sent to the facility licensee contact (must be on the examination security agreement) (B.2, ES-4.1 A.1.b and ES-4.1 A.2.a).

Form ES-4.1 Date of Written Exam:

Description Notes Examination administration date confirmed (A.1-5). For NRC prepared examinations, arrangements are made for the facility licensee to submit reference materials (B.4, C.4.g and F).

End of Op Test:

Written Exam Developed By: Facility Operating Test Developed By: Facility Document review on Form 2.3-5 Preliminary license applications & waiver/excusal requests due NRC Forms 398/396-Examination review results discussed between the NRC and the facility licensee (B.14).

On-site validation & 10% audit of license applications (I)

Final license applications, including any waiver/excusal requests, due and Form 2.2-1 prepared (ES-2.2 C and E).

Form 2.2-1 prepared Written examination administration guidelines reviewed with the facility licensee (D.14).

Replaces NUREG-1021, Revision 12, Forms ES-2.1-1 and ES-5.1-1 Reviewed and incorporated any necessary facility and applicant operating test comments. NRC grading of operating test completed. (ES-3.6)

Forms 5.1-2 complete for all applicants produced by CE Mailed licenses, preliminary results, and pass letters.

Performed examination recordkeeping activities (refer to OLMC 520, Operator Licensing Examination Records and Documentation, and Management Directive 3.53, NRC Records and Document Management Program).

Returned reference material after final resolution of any informal NRC staff reviews, hearing demands, or both.

Issued the examination report (refer to Operator Licensing Manual Chapter (OLMC) 510, Operator Licensing Examination Reports).

Examiner's document op test results on ES 303's Notified facility licensee of results. RPS/IP number of examinees updated print Report-21 NRC-prepared examinations approved by the NRC supervisor and forwarded for facility licensee review (ES-2.3).

Received post examination package from facility licensee and verified complete. (ES-4.4)

Forms to BC (20 days from date of last exam activity-if written is last activity, this is when clock starts)

Final Denial Letters mailed (if no request for informal review)

Approved scenarios and job performance measures distributed to NRC examiners (D.12).

Final applications reviewed; 10% of applications audited to confirm qualifications/eligibility (ES-2.2 G); and examination approval letter (Letter 2.3-1) and waiver/excusal letters sent.

produced and BC signs Exam Approval Letter Form 2.3-1 Waivers/deferrals reviewed for impact on licensing decision Reviewed and incorporated any necessary facility and applicant written examination comments. NRC grading of written examination completed. (ES-4.4)

Completed NRC chief examiner review of operating test and written examination grading. (ES-3.6 and ES-4.4)

Completed licensing official review. (BC signs licenses)