E-mail - Appendix a to the Regulatory Audit in Support of Review of EPRI Report 3002032184, U.S. Industry Performance Monitoring Inspection Plan for Select ASME Code Examination Items of PWR Steam Generators and Pressurizers (EPID L-2025- T
ML26013A089
Person / Time
Site: Electric Power Research Institute
Issue date: 01/13/2026
From: Lois James
Licensing Processes Branch
To: Grizzi R
Electric Power Research Institute
References
EPRI Report 3002032184, EPID L-2025-LRM-0030 pre-app, EPID L-2025-TOP-0024 pre-fee, EPID L-2025-NTR-0003 post-fee
Download: ML26013A089 (0)


Text

1 Lois James From:

Lois James Sent:

Tuesday, January 13, 2026 10:01 AM To:

Grizzi, Robert Cc:

RidsNrrOd Resource; RidsNrrDnrl Resource; RidsNrrDnrlNvib Resource; RidsNrrDnrlNphp Resource; RidsNrrLADHarrison Resource; RidsNrrDorl Resource; RidsNrrDorlLlpb Resource; RidsACRS_MailCTR Resource; Lois James; Demetrius Murray; Angie Buford; Steven Levitus; Dan Widrevitz; Matthew Mitchell; Stephen Cumblidge; Cirilli, James

Subject:

Appendix A to the Regulatory Audit in Support of Review of EPRI Report 3002032184, U.S. Industry Performance Monitoring Inspection Plan for Select ASME Code Examination Items of PWR Steam Generators and Pressurizers (EPID L-2025-TOP-0024)

Attachments:

NDE Optimization TR - audit plan - Appendix A.pdf Robert F. Grizzi, Program Manager EPRI Plant Support / NDE Electric Power Research Institute (EPRI) 1300 West W.T. Blvd Charlotte, NC 28262-8550 Robert Grizzi:

By letter dated June 19, 2025 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML25171A128), Electric Power Research Institute (EPRI) submitted Non-Destructive Examination (NDE)

Technical Report titled U.S. Industry Performance Monitoring [(PM)] Inspection Plan for Select ASME

[American Society of Mechanical Engineers] Code Examination Items of PWR [Pressurized Water Reactor]

Steam Generators [SG] and Pressurizers [PZR] (TR or the NDE Optimization TR) to the U.S. Nuclear Regulatory Commission (NRC) for review and approval. The PM Inspection Plan presents a comprehensive, U.S. PWR fleet-wide inspection plan for the SG and PZR components to address the NRCs requirement for PM. By email dated July 18, 2025 (ML25174A097), the NRC staff accepted the EPRIs NDE Optimization TR for review.

By email dated December 8, 2025 (ML25211A269), the NRC staff issued a regulatory audit plan to conduct an audit associated with the review of EPRI NDE Optimization TR in accordance with the Office of Nuclear Regulatory Reactor Office Instruction (OI) LIC-111, Regulatory Audits, Revision 2, effective October 1, 2024 (ML24309A281). The purpose of the audit is for the staff to gain a better understanding of EPRIs U.S. PWR-fleet-wide inspection plan for SGs and PZRs components to address the NRCs requirement for PM during the extended relief period.

The NRC staff is updating its audit plan to include specific questions for discussion in an Appendix to the audit plan.

If you have any questions, please contact me by email at lois.james@nrc.gov.

Sincerely, Lois M. James, Senior Project Manager Licensing Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 99902021

2

Enclosure:

Audit Plan Appendix A ADAMS Accession Nos.:

ML26013A088 (pkg)

ML26013A089 (email)

ML26013A091 (audit plan appendix a)