2026 North Anna Requalification Inspection Corporate Notification Letter
ML25352A116
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 12/20/2025
From: Matthew Endress
NRC/RGN-II/DORS/OB
To: Carr E
NRC/RGN-II/DORS/OB
References
Download: ML25352A116 (0)


Text

Eric S. Carr, Nuclear Operations and Chief Nuclear Officer Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION -NORTH ANNA POWER STATION

Dear Eric Carr:

During a telephone conversation on December 11, 2025, Mr. Virgel Furr, Senior Operations Engineer, and Mr. Todd Fulton, Supervisor Operations Training, made arrangements for the NRC to inspect the licensed operator requalification program at the North Anna Power Station.

The inspection is planned for the week of January 25, 2026, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program. It is our understanding that you have committed to maintain your plant-referenced simulator in accordance with ANSI/ANS-3.5-2009, American National Standard for Nuclear Power Plant Simulators for Use in Operator Training and Examination.

In accordance with 10 CFR 55.59, the NRC has requested that you submit the material as specified in paragraph A of the Enclosure, to support the NRC's in-office inspection program needs. The NRC has further requested that you have all items as specified in paragraph B of the Enclosure available for review for the inspectors on the first day they arrive on site. Mr.

Fulton has been advised of this request and provided with the name of the NRC lead inspector assigned to this inspection. The methodology to transfer, electronically, materials has been coordinated with him.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number Part 55 (3150-0018).

The public reporting burden for this collection of information is estimated to average 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB approval number.

December 20, 2025

E. Carr 2

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. (The Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. Furr at (404) 997-4411, (Internet E-mail: Virgel.Furr@nrc.gov), or me at (404) 997-4718, (Internet E-mail: Matthew.Endress@nrc.gov).

Sincerely, Matthew F. Endress, Chief Operations Branch Division of Operating Reactor Safety Docket No.: 50-338, 50-339 License No.: NPF-4, NPF-7

Enclosure:

Materials Request List cc: Distribution via Listserv Signed by Endress, Matthew on 12/20/25

E. Carr 3

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION - NORTH ANNA POWER STATION DATED DECEMBER 20, 2025 DISTRIBUTION:

V. Furr, RII M. Endress, RII ADAMS ACCESSION NUMBER: ML253352A116 x

SUNSI Review x

Non-Sensitive

Sensitive x

Publicly Available

Non-Publicly Available OFFICE RII/DORS RII/ DORS NAME V. Furr M. Endress DATE 12/19/25 12/20/25 OFFICIAL RECORD C

Enclosure Materials Request List The items listed below are necessary to support the Licensed Operator Requalification Program Inspection (IP-71111.11) in January 2026 at the North Anna Power Station. Items listed under In-office inspection material must be received in the NRC Region II office by the due dates specified below. Items listed under On-site inspection material should be ready for review upon arrival of the inspectors on January 26, 2026.

A.

In-office inspection material due by January 19, 2026:

1.

List of all licensed individuals (active and inactive; RO and SRO) including license restrictions.

2.

Organizational Chart for the training department, including the simulator fidelity staff, with phone number/email contact information.

3.

Weekly examination schedules for the weeks that the 2026 annual operating exams will be administered, including a list of personnel scheduled for testing the week of January 25, 2026.

4.

Site procedure(s) governing the conduct (process and content) of license operator requalification training (classroom & simulator), examination development/administration, remedial training, and examination security.

5.

Site procedure(s) governing simulator configuration control, maintenance, and fidelity testing methods used to fulfill ANSI/ANS 3.5-2009 requirements.

6.

All JPMs that will be administered during the annual operating test that have been approved for use, including spreadsheets or outlines that show the usage of all JPMs in the 2026 annual operating test weeks (Inspectors may request, later, additional exam items from remaining exam weeks). EXAM SECURITY ITEM 7.

All simulator scenarios that will be administered during the annual operating test that have been approved for use, including spreadsheets or outlines that show the usage of all scenarios in the 2026 annual operating test weeks (Inspectors may request, later, additional exam items from remaining exam weeks). EXAM SECURITY ITEM.

8.

All written examinations administered during the biennial written exam cycle that are approved for use, answer keys (original and final), re-take examinations, and spreadsheets or outlines that show the usage of all written questions including on the different versions of these written examinations. (Inspectors may request, later, additional exam items from remaining exam weeks). EXAM SECURITY ITEM 9.

Self-assessment reports, condition reports, and/or Licensee Event Reports, written since the last biennial requalification inspection, which document operator errors or performance problems which occurred in the actual plant/main control room, including the corrective actions and if these issues were incorporated into requalification training

2 B.

On-site inspection material [January 26, 2026]:

1.

Requalification training attendance records for the current two-year biennial training cycle along with an overall schedule of the facility licensees requalification program since the last biennial inspection (cycle weeks, training topics, etc.).

2.

Licensed operator pass/fail statistics for any NRC-required requalification examination that has been completed since last requalification inspection (weekly operating & written examinations).

3.

Copies of the simulator scenarios for the inspectors to observe the operating crews and evaluators the week of January 25, 2026.

4.

All remedial training documentation for any licensed operator that failed any NRC-required examination since the last requalification inspection.

5.

List of all operators that reactivated their licenses since the last requalification inspection.

6.

Records that support verification of time on shift under instruction and complete plant tours for both the reactivating operator and the supervising active license since the last requalification inspection, including:

a.

Documentation of time on shift under instruction.

b.

Security system and HP/dosimetry records for plant areas toured by reactivating individual and accompanying licensed operator.

7.

Records providing documentation of maintenance of active license status (time on shift) for all licensed operators since last requalification inspection.

8.

Medical records for a sample of licensed (active and inactive) operators. The list of names for the sample will be provided by the lead inspector upon arrival at North Anna.

9.

A list and descriptions of any examination security problems since the last biennial inspection (likely documented in training department condition/problem identification reports).

10. Simulator maintenance and testing records, including:

a.

List of all open simulator discrepancies b.

List of all simulator discrepancies closed within the past 12 months c.

List of simulator performance tests d.

Simulator performance testing records and associated documentation