From:
Lou McKown To:
Rode, Andrew; timothy.falkiewicz@fpl.com Cc:
Steve Downey; Jonathan Lizardi-Barreto; James Baptist
Subject:
NRC Staff Inservice Inspection Activity Discussion with St. Lucie Staff Date:
Friday, December 12, 2025 12:39:00 PM Good Day,
The purpose of this message is to document the following:
On December 11, 2025, members of the Nuclear Regulatory Commission (NRC), Region II, Division of Operating Reactor Safety, Engineering Branch 3, engaged in touchpoint with staff at NextEra Energys Floridia Power and Lights St. Lucie Nuclear Station to discuss inservice inspection activities performed at St. Lucie unit 1 during a planned refueling outage in the fall of 2025.
Scope of Communication Discuss the completion status of all ISI inspections planned for the outage Review a summary of any examinations planned for the current outage that were not completed, including confirmation that deferral of the examination is permitted by the Code.
Review a summary of defects and relevant conditions identified in ASME components during the outage and the action taken to accept the component for continued service. This may be more easily discussed over a simplified table.
If reactor vessel head examinations were performed, discuss the scope of examinations performed and the results.
If steam generator examinations were performed at the site, then discuss the following:
The results of SG tube inspections, including the number of tubes plugged during the outage and whether any new degradation mechanisms were identified.
The result of any secondary side inspection and maintenance activities (visual inspection, sludge lancing, etc.)
Review a summary of any significant boric acid leaks identified during the outage (i.e., active, large accumulation, evidence of active corrosion present, etc.)
Discuss any other challenges or lessons learned identified during the outage.
Participants:
L. McKown, NRC J. Baptist, NRC J. Lizardi-Barreto, NRC S. Downey, NRC A. Krauser, FPL C. Kruse, FPL M. Miller, FPL E. Ong, FPL
A. Rode, FPL
This discussion was not an inspection. The NRC staff identified no findings as a result of this communication. Any insights gained by the NRC staff will be used in the planning of future inspection activities. No documents or licensee materials proprietary or otherwise were retained from this interaction. A copy of this message will be placed into the Agencywide Documents Access and Management System (ADAMS).
End of Message.
If you have any further questions, comments, or concerns please do not hesitate to contact me at the information provided below.
Very Respectfully,
Lou McKown, Chief, Engineering Branch #3, Nuclear Construction, License Renewal, Spent Fuel Storage,
& Inservice Inspection Program Inspection Oversight Division of Operating Reactor Safety, Region II U.S. Nuclear Regulatory Commission 404-997-4545 Louis.McKown@NRC.gov
LOUIS MCKOWN Digitally signed by LOUIS MCKOWN Date: 2025.12.12 12:44:25 -05'00'