ML25344A001
| ML25344A001 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 12/10/2025 |
| From: | Atif Shaikh NRC/RGN-III/DORS/ERPB |
| To: | Peter Dietrich DTE Electric Company |
| References | |
| IR 2026002 | |
| Download: ML25344A001 (0) | |
Text
Peter Dietrich Senior VP and Chief Nuclear Officer DTE Electric Company Fermi 2 - 260 TAC 6400 North Dixie Highway Newport, MI 48166
SUBJECT:
FERMI POWER PLANT NOTIFICATION OF NRC BASELINE INSPECTION AND REQUEST FOR INFORMATION
Dear Peter Dietrich:
On March 30, 2026, the U.S. Nuclear Regulatory Commission (NRC) will begin the Baseline Inservice Inspection Procedure 71111.08. This onsite inspection is scheduled to be performed March 30, 2026, through April 3, 2026.
Experience has shown that this inspection is resource intensive both for the NRC inspector and your staff. In order to minimize the impact to your onsite resources, and to ensure a productive inspection for both sides, we have enclosed a request for documents needed for this inspection.
These documents have been divided into two groups.
The first group identifies information necessary to ensure that the inspector is adequately prepared. The second group identifies the information the inspector will need upon arrival at the site. It is important that all of these documents are up-to-date, and complete, in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.
We have discussed the schedule for inspection activities with your staff and understand that our regulatory contact for this inspection will be Noe Jamieson of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector Atif Shaikh at (630) 829-9824, or via email at Atif.Shaikh@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.
December 10, 2025
P. Dietrich 2
This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Atif Shaikh, Senior Reactor Inspector Engineering Reactor and Projects Branch Division of Operating Reactor Safety Docket Nos. 05000341 License Nos. NPF-43
Enclosure:
Document Request for Inservice Inspection cc: Distribution via LISTSERV Signed by Shaikh, Atif on 12/10/25
P. Dietrich 3
Letter to Peter Dietrich from Atif Shaikh dated December 10, 2025.
SUBJECT:
FERMI POWER PLANT NOTIFICATION OF NRC BASELINE INSPECTION AND REQUEST FOR INFORMATION DISTRIBUTION:
Rodney Clagg RidsNrrDorlLpl3 RidsNrrPMFermi2 Resource RidsNrrDroIrib Resource Jack Giessner Mohammed Shuaibi Diana Betancourt-Roldan John Pelchat Jared Heck Jennifer Dalzell R3-DORS ADAMS Accession Number: ML25344A001 Publicly Available Non-Publicly Available Sensitive Non-Sensitive OFFICE RIII NAME AShaikh:gmp DATE 12/10/2025 OFFICIAL RECORD COPY
DOCUMENT REQUEST FOR INSERVICE INSPECTION Enclosure Inspection Report: 05000341/2026002 Inspection Dates:
March 30, 2026, through April 3, 2026 Inspection Procedures:
Inspection Procedure 71111-08, Inservice Inspection Lead Inspector:
Atif Shaikh, DORS/ERPB (630) 829-9824 Atif.Shaikh@nrc.gov A.
Information for the In-Office Preparation Week The following information (electronic copy) is requested by February 27, 2026, to facilitate the selection of specific items that will be reviewed during the onsite inspection week. The inspector will select specific items from the information requested below and request a list of additional documents needed onsite to your staff. We request that the specific items selected from the lists be available and ready for review on the first day of inspection. The following information is applicable to the outage Unit unless otherwise indicated. If you have any questions regarding this information, please call the inspector as soon as possible.
For the upcoming outage, a detailed schedule (including dates, is possible) and description of:
a.
List of all Non-Destructive Examinations (NDEs) planned to be performed as part of your American Society of Mechanical Engineers (ASME) Code Inservice Inspection (ISI) Program (include edition and addenda of Code committed to),
and NDEs planned for other systems performed as part of a Risk-Informed ISI Program, or other augmented inspection programs (e.g., ASME Code Case N-770 examination of dissimilar metal welds and examinations to meet an industry initiative). Description shall include component ASME Code Class, component IDs, categorization (Section XI, Risk Informed, or Augmented, etc.),
and dates/times the NDEs are scheduled to be performed.
b.
List of Welding on Code Class 1, 2, or 3 components to be performed during the outage.
c.
List identifying NDE reports (Volumetric, Surface, and Visual), which have identified relevant indications on ASME Code Class 1 and 2 Systems since the beginning of the last refueling outage. For indications that were accepted as-is for continued service, provide schedule of successive exams required by Code.
d.
List of repair/replacement welds in ASME Code Class 1, 2 and 3 Systems, which have been fabricated since the beginning of the last refueling outage.
DOCUMENT REQUEST FOR INSERVICE INSPECTION 2
e.
List of Title 10 CFR Part 21 reports applicable to your structures, systems, or components within the scope of ASME Code Section XI that have been identified since the beginning of the last refueling outage.
f.
List of corrective action documents related to ISI issues such as piping degradation or damage or errors identified during piping examinations since the beginning of the last refueling outage.
g.
Copy of latest revision to the Inservice Inspection Program Plan.
h.
Point of contact information (names and site numbers) for ISI/Welding.
B.
Onsite Information to be provided to the inspector on the first onsite date.
The following information is requested for only specific items that are selected by the inspector from list A above:
a) A copy of ASME Section XI, Code Relief Requests applicable to the selected items.
b) Copies of applicable NDE procedures, weld procedure specifications (WPS),
NDE procedure qualification records, WPS qualification records, NDE personnel performance qualification records, welder performance qualification records, and ISI related corrective action documents.
c)
Copy of the ASME Section XI, Code of record for the selected items.
d) Copy of the applicable Code of Construction for repair/replacement activities on selected items.