UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD PANEL Before Administrative Judges:
Stefan R. Wolfe, Chair Dr. David A. Smith Nicholas G. Trikouros In the Matter of LONG MOTT ENERGY, LLC (Long Mott Generating Station)
Docket No. 50-614-CP ASLBP No. 25-991-01-CP-BD01 December 4, 2025 MEMORANDUM (Supplemental Guidance Regarding Initial Prehearing Conference)
In response to NRC Staffs December 3, 2025 Notification Regarding Supplemental Information,1 the Licensing Board seeks to clarify and provide guidance on the scope of the December 8, 2025 initial prehearing conference. In the notice, the NRC Staff advised the Board that based on supplemental information it had received from applicant Long Mott Energy, L.L.C.
(LME) on September 26, October 17, 2025, and November 20, 2025, the NRC Staff had altered its position on the admissibility of certain contentions.2 The NRC Staff indicated that this supplemental information had cured what it had previously determined were information deficits that rendered portions of two of petitioner San Antonio Bay Estuarine Waterkeepers (Petitioner) contentions admissible contentions of omission, i.e., Contention 1 as it concerned descriptions 1 Notification Regarding Supplemental Information (Dec. 3, 2025).
2 Id. at 1-2.
of fuel qualification and testing to meet 10 C.F.R. § 50.34(a)(8), and Contention 4 regarding the environmental effects of continued storage of spent nuclear fuel and flood level information in LMEs preliminary safety analysis report (PSAR).3 The NRC Staff took no position on whether the supplemental information itself was sufficient to meet regulatory requirements.4 Relative to the contention admissibility impact of the September 26, 2025 LME supplemental information on a portion of Contention 1 and the October 17 and November 20, 2025 LME supplemental information on portions of Contention 4, the Board may ask the participants their views on whether the supplemental information referenced in these LME supplements moots any assertions that the construction application omitted certain required information.5 Additionally, the Board may inquire if Petitioner intends to file one or more new or amended contentions regarding LMEs September 26, October 17, and November 20 information supplements. The argument will not extend to the admissibility or substance of any new or amended contentions that Petitioner may raise.
Members of the public and other interested persons who wish to listen to the oral argument may access the listen-only line by dialing (301) 576-2978 and entering passcode 198 879 573 followed by the # sign. After successful entry of the passcode, the following message will be heard: You are not allowed to unmute. To raise your hand press *5. Please note that this telephone line is not being monitored and pressing *5 will not allow participation in the conference.
3 Id. at 3-5.
4 Id. at 4, 5.
5 In accordance with the Boards August 28, 2025, initial order, Petitioner shall file any new or amended contention within 30 days from the date upon which the information that is the basis of the motion becomes available to the petitioner/intervenor. See Licensing Board Order (Initial Prehearing Order) (Aug. 28, 2025) at 5 n.17 (unpublished); 10 C.F.R. § 2.309(c)(1).
A transcript will be made publicly available shortly after the conference in the NRCs electronic hearing docket.
FOR THE ATOMIC SAFETY AND LICENSING BOARD Stefan R. Wolfe, Chair ADMINISTRATIVE JUDGE Rockville, Maryland December 4, 2025
/RA/
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of
)
)
LONG MOTT ENERGY, LLC.
)
Docket No. 50-614-CP
)
)
(Long Mott Generating Station)
)
CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing MEMORANDUM (Supplemental Guidance Regarding Initial Prehearing Conference) have been served upon the following persons by Electronic Information Exchange.
U.S. Nuclear Regulatory Commission Office of Commission Appellate Adjudication Mail Stop: O-16B33 Washington, DC 20555-0001 E-mail: ocaamail.resource@nrc.gov U.S. Nuclear Regulatory Commission Office of the Secretary of the Commission Mail Stop: O-16B33 Washington, DC 20555-0001 E-mail: hearingdocket@nrc.gov Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Stefan R. Wolfe, Chair, Administrative Judge Nicholas G. Trikouros, Administrative Judge Dr. David A. Smith, Administrative Judge Whitlee Dean, Law Clerk Georgia Rock, Law Clerk Email: stefan.wolfe@nrc.gov nicholas.trikouros@nrc.gov david.smith@nrc.gov whitlee.dean@nrc.gov georgia.rock@nrc.gov U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-14A44 Washington, DC 20555-0001 Susan Vrahoretis, Esq.
David Roth, Esq.
Julie Ezell, Esq.
Sam Stephens, Esq.
Nick Mertz, Esq.
Stacy Schumann, Team Leader Anne Fream, Paralegal Georgia Hampton, Paralegal Email: susan.vrahoretis@nrc.gov david.roth@nrc.gov julie.ezell@nrc.gov samuel.stephens@nrc.gov nicolas.mertz@nrc.gov stacy.schumann@nrc.gov anne.fream@nrc.gov georgiann.hampton@nrc.gov Counsel for San Antonio Bay Estuarine Waterkeeper Perales, Allmon, & Ice, P.C.
1206 San Antonio St.
Austin, Texas 78701 Marisa Perales, Esq.
Gweneth Lonergan, Lead Legal Asst.
Email: marisa@txenvirolaw.com gwyneth@txenvirolaw.com
Long Mott Energy, LLC., Docket No. 50-614-CP MEMORANDUM (Supplemental Guidance Regarding Initial Prehearing Conference) 2 Counsel for Long Mott Energy, LLC.
Morgan, Lewis, & Bockius, LLP.
1111 Pennsylvania Ave., NW Washington, DC 20004 Ryan K. Lighty, Esq.
Alex Polonsky, Esq.
Email: ryan.lighty@morganlewis.com alex.polonsky@morganlewis.com Office of the Secretary of the Commission Dated at Rockville, Maryland, this 4th day of December 2025.
CLARA SOLA Digitally signed by CLARA SOLA Date: 2025.12.04 15:22:08 -05'00'