ML25335A192
| ML25335A192 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 12/02/2025 |
| From: | Gangewere M NRC/RGN-III/DORS/EB1 |
| To: | Mudrick C Constellation Energy Generation |
| References | |
| IR 2026010 | |
| Download: ML25335A192 (0) | |
See also: IR 05000237/2026010
Text
Christopher H. Mudrick
Senior Vice President
Constellation Energy Generation, LLC
President and Chief Nuclear Office (CNO)
Constellation Nuclear
200 Energy Way, KSA-3N
Kennett Square, PA 19348
SUBJECT:
DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 - REQUEST FOR
INFORMATION FOR NRC COMMERCIAL GRADE DEDICATION INSPECTION:
INSPECTION REPORT 05000237/2026010 AND 05000249/2026010
Dear Christopher H. Mudrick:
On March 2, 2026, the U.S. Nuclear Regulatory Commission (NRC) will begin a commercial
grade dedication (CGD) inspection at Dresden Nuclear Power Station, Units 2 and 3. This
inspection will be performed in accordance with NRC Inspection Procedure 71111.21N.03,
The inspection will evaluate the implementation of Dresdens process for dedicating
commercial-grade items, as required in applicable portions of Title 10 of the Code of Federal
Regulations (10 CFR) Part 50, Appendix B, Quality Assurance Criteria for Nuclear Power
Plants and Fuel Reprocessing Plants, to ensure reasonable assurance is provided that these
items will perform their intended safety function. Additionally, the inspection will evaluate
implementation of Dresdens procurement process for safety-related components, as required in
Appendix B.
The inspection will include 2 weeks onsite and will consist of 3 NRC inspectors (including the
lead inspector). The current inspection schedule is as follows:
Preparation week:
February 23 - 27, 2026
Onsite weeks:
March 2 - 6, 2026 and March 16 - 20, 2026
Experience with previous baseline inspections of similar depth and length has shown that this
type of inspection is extremely resource intensive, both for the NRC inspectors and the licensee
staff. To minimize the inspection impact on the site and to ensure a productive inspection for
both parties, we have enclosed a request for information.
December 2, 2025
C. Mudrick
2
It is important that all these documents are up-to-date and complete to minimize the number of
additional documents requested during the preparation and/or the onsite portions of the
inspection. Insofar as possible, this information should be provided electronically to the lead
inspector. The information request has been divided into four groups:
The first group lists information necessary for our initial inspection scoping activities.
This information should be provided to the lead inspector no later than January 5, 2026.
The lead inspector will communicate the initial selected set of samples no later than
January 14, 2026.
The second group of documents requested are those items needed to support
our in-office preparation activities. This set of documents should be provided to
the lead inspector no later than February 16, 2026. During the in-office
preparation activities, the team may identify additional information needed to
support the inspection.
The third group includes the additional information above, a schedule of plant
activities associated with the inspection during the onsite period, and any
additional requests resulting from the potential information gathering visit. This
information should be available no later than February 23, 2026.
The fourth group includes supporting information to be provided throughout the
onsite inspection. Specifically, corrective action documents and answers to
questions developed during the inspection are requested to be provided as
the documents are generated.
In addition, the enclosure includes information and requests addressing inspection logistics.
The lead inspector for this inspection is Megan Gangewere. We understand that our licensing
contact for this inspection is Tara Noah of your organization. If there are any questions about
the inspection or the material requested in the enclosure, please contact the lead inspector via
email at Megan.Gangewere@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, Control
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget Control
Number.
C. Mudrick
3
This letter and its enclosure will be made available for public inspection and copying at
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
Megan Gangewere, Senior Reactor Inspector
Engineering Branch 1
Division of Operating Reactor Safety
Docket Nos. 05000237 and 05000249
License Nos. DPR-19 and DPR-25
Enclosure:
Commercial Grade Dedication Inspection
Request for Information
cc: Distribution via LISTSERV
Signed by Gangewere, Megan
on 12/02/25
C. Mudrick
4
Letter to Christopher H. Mudrick from Megan Gangewere dated December 2, 2025.
SUBJECT:
DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 - REQUEST FOR
INFORMATION FOR NRC COMMERCIAL GRADE DEDICATION INSPECTION:
INSPECTION REPORT 05000237/2026010 AND 05000249/2026010
DISTRIBUTION:
RidsNrrDorlLpl3
RidsNrrPMDresden Resource
RidsNrrDroIrib Resource
R3-DORS
ADAMS Accession Number: ML25335A192
Publicly Available
Non-Publicly Available
Sensitive
Non-Sensitive
OFFICE
RIII
NAME
MGangewere:gmp
DATE
12/02/2025
OFFICIAL RECORD COPY
Enclosure
COMMERCIAL GRADE DEDICATION INSPECTION
REQUEST FOR INFORMATION
I.
ADMINISTRATIVE INSPECTION INFORMATION
Inspection Report Number:
05000237/2026010 AND 05000249/2026010
Onsite Inspection Dates:
March 2 - 6 and March 16 - 20, 2026
Inspection Procedure:
IP 71111.21N.03, Commercial Grade Dedication
Lead Inspector:
Megan Gangewere, Senior Reactor Inspector
RIII/DORS/EB1
Megan.Gangewere@nrc.gov
Teammates:
Cory Padilla, Reactor Inspector, RIII/DORS/EB1
Bob Walden, Reactor Inspector, RIII/DORS/EB2
II.
LOGISTICS
Email the following inspection logistics to the lead inspector by February 23, 2026, or
sooner:
1.
Inspection room name/number, directions from the main access facility, and phone
number;
2.
Interview room name/number;
3.
Response team contact information (names and phone numbers) and team
roles (e.g., management sponsor, lead, inspector counterpart);
4.
Any site access/badging actions needed for each inspector;
5.
Any dosimetry actions needed for each inspector;
6.
Entrance meeting time and location (if applicable);
7.
Confirmation that the team will have access to a licensee computer with a
nearby printer;
8.
Confirmation that the team will have Wi-Fi access;
9.
Cafeteria location and hours;
10. Inspection response team normal working hours;
11. Any potential resource conflicts during the inspection (e.g., emergency drills and
all-staff meetings); and
12. Current management and engineering organizational chart.
2
III. INFORMATION REQUEST
Contact the lead inspector as soon as possible if you have any questions regarding this
information request. Provide the information electronically in pdf files, Excel, or other
searchable formats, preferably via an electronic sharing service (CERTREC, ShareFile,
Box, etc.). Specific Excel formats for various enclosure items may be requested to assist
in inspection sample selection. If you do not have access to any of these services or
similar, we can provide you access to NRCs SharePoint External Sharing (SPxS)
system, which can be used to upload/download and share documents. The files should
contain descriptive names and be indexed and hyperlinked to facilitate ease of use.
Information in lists should contain enough information to be easily understood by
someone who has knowledge of light water reactor technology.
1.
Information Requested for Selection of Samples
The following information is requested by January 5, 2026, or sooner, to facilitate the
initial sample selection.
Note: If you are unable to provide any items as requested, please reach out to the
lead inspector as soon as possible.
1.1.
List of commercial-grade items, with a brief description of the end-use
application, that have been dedicated for safety-related applications. These
items may be dedicated by the site or dedicated by a vendor (or other
licensee) and procured by the site. Please note whether the item has been
installed in the plant. Please include the component equipment identification of
the proposed or installed item location. The list should encompass the past 6
years of dedication activities.
1.2.
List of any commercial grade-items that failed after completing the dedication
process. The list should encompass the past 6 years of dedication activities.
1.3.
List of components procured as safety-related, with descriptions, if not included
above. Please note whether the component has been installed in the plant.
Please include the component equipment identification of the proposed or
installed location. The list should encompass the past 6 years of procurement
activities.
1.4.
List of corrective action program documents, with descriptions, related to
commercial-grade items, procurement, or storage, including any items that
failed after completing the dedication process. The list should encompass the
past 6 years of these activities.
1.5.
List of components procured as safety-related or commercial-grade items
intended to be dedicated for safety-related applications that are on hold
because of concerns identified during receipt, dedication, or from operating
experience/corrective action program as applicable. If possible, the list should
identify the systems and equipment in which these items were intended for use.
3
1.6.
List of components procured as safety-related or commercial-grade items
dedicated for safety-related applications, in the past 6 years, where the
procurement/dedication process was expedited to support rapid
turnaround (less than 7 days). If possible, the list should identify the
systems and equipment in which these items were intended for use.
1.7.
Procedures for dedicating commercial-grade items and for procurement of
safety related components. Also include procedures controlling counterfeit,
fraudulent, and suspect items.
1.8.
Electronic copies of simplified plant drawings (if available). Note: these may be
uncontrolled documents such as big notes, training diagrams, etc.
1.9.
List of systems, system numbers/designators, and corresponding names.
1.10. List of site contacts that will be associated with the inspection.
1.11. Copy of qualifications, as applicable, of personnel who performed
commercial-grade dedication, safety-related component procurement, and/or
receipt inspection/testing activities within the past 6 years.
2. Information Requested to Support Inspection Preparation Activities
The following information is requested for the inspection samples by
February 16, 2026, or sooner, to facilitate inspection preparation.
This document request is based on typical documents that a generic plant might
have. As such, this document request is not meant to imply that any specific plant is
required to have all the listed documents. In addition, your plant specific document
titles may vary from the document titles listed below.
This information should be separated for each selected sample, especially if
provided electronically (e.g., folder with sample name that includes specifications,
inspection reports, dedication information, etc.).
2.1.
Purchase requisitions and purchase orders;
2.2.
Other pertinent vendor/licensee correspondence;
2.3.
Original and updated design specifications;
2.4.
Catalog specifications;
2.5.
Procurement basis evaluation such as like-for-like, equivalency, plant design
change packages, drawing and specification updates;
2.6.
10 CFR 50.59 documentation, if applicable;
2.7.
Material receiving reports, packing lists/invoices, and other shipping
documents;
2.8.
Receipt inspection reports and any related test reports;
4
2.9.
Other documents to trace the item from the time it was dedicated to the time it
was installed, tested, and accepted;
2.10. Certificates of conformance/compliance/quality;
2.11. Vendor test and inspection reports;
2.12. Third-party or sub-vendor test and inspection reports;
2.13. Shelf-life information;
2.14. Vendor dedication/partial dedication information;
2.15. Design/material/process change history information;
2.16. Completed commercial-grade dedication documentation including:
2.16.1 safety classification
2.16.2 identification of safety functions/application requirements
2.16.3 identification of critical characteristics
2.16.4 identification of verification methods and acceptance criteria for the
critical characteristics
2.16.5 evaluation of credible failure modes, if applicable
2.16.6 identification of the suppliers quality assurance program that meets
2.17. Any deviation from design, material, and performance characteristics
relevant to the safety function (nonconformance dispositions).
2.18. Documents showing objective evidence:
2.18.1 special test and inspection procedures and results
2.18.2 commercial-grade survey reports -item, design, material, and specific
performance characteristic (relevant to safety function)
2.18.3 source inspection reports
2.19. Completed post-installation test procedure and results;
2.20. Completed stock or material issue forms and installation work orders or reports;
2.21. Historical performance information, including corrective action documents,
maintenance rule performance, failure analysis or root cause analysis for any
failed components, and system health reports related to the installed
components.
5
3.
Additional Information to be Provided by February 23, 2026
3.1.
During the in-office preparation activities, the team will be making final
selections and may identify additional information needed to support the
inspection. The lead inspector will provide a list of any additional
information needed during the preparation week of February 23, 2026,
which should be available during the onsite week beginning March 2, 2026.
3.2.
Schedule of any activities to be conducted on the selected samples during the
two onsite inspection weeks (e.g., installation, testing, inspection, etc.).
3.3.
Schedule of separate interviews with knowledgeable plant personnel for each
of the components selected during the beginning of the first onsite week.
Interviews will discuss the dedication/procurement process, selected critical
characteristics of each sample, installation, and performance of installed items.
This can include, but is not limited to, plant personnel from Procurement
Engineering, other Engineering disciplines, Operations, Maintenance, or any
other departments that are cognizant of the dedication/procurement,
installation, and acceptance criteria/methods of each component including
component/system health.
3.4.
Schedule for walkdowns with knowledgeable plant personnel during the first
onsite week. Walkdown locations include onsite procurement facilities,
designated maintenance department storage areas for components, and
warehouse storage locations and plant walkdowns (if installed) of the selected
components.
4.
Information Requested to be Provided Throughout the Inspection:
4.1.
Any corrective action documents generated as a result of the teams questions
during this inspection as the documents are generated;
4.2.
Daily list of questions and/or document requests submitted by the team and
their status (e.g., open, closed) sorted by inspector. It is recommended to
provide the lead inspector with a master list sorted by inspector and each
inspector with a list containing only the items originated by that inspector.
If you have questions regarding the information requested, please contact the lead inspector.