Terry Brown Site Vice President Vistra Operations Company, LLC Perry Nuclear Power Plant 10 Center Road Perry, OH 44081
SUBJECT:
PERRY NUCLEAR POWER PLANT - REQUEST FOR INFORMATION FOR THE NRC AGE-RELATED DEGRADATION INSPECTION: INSPECTION REPORT 05000440/2026010
Dear Terry Brown:
The purpose of this letter is to request information to support our scheduled age-related degradation inspection beginning January 26, 2026, at Perry Nuclear Power Plant.
This inspection will be performed in accordance with NRC baseline inspection procedure 71111.21N.04 Age-Related Degradation.
An initial list of documents requested to support identification of structures, systems, and components (SSCs) that will be reviewed during the inspection is provided in enclosure 1.
For SSCs that the inspection team plans to review, an initial list of the documents the team plans to review during the conduct of the inspection is listed in enclosure 2. The team leader will contact you with identified SSCs. Also, personnel should be available at the site during the inspection who are knowledgeable regarding maintenance, surveillance, testing, inspection, and condition monitoring programs.
This letter contains voluntary information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB) approved these information collections (approval number 3150-0011). The burden to the public for these information collections is estimated to average 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> per response. Send comments regarding this information collection to the FOIA, Library and Information Collection Branch, Office of the Chief Information Officer, Mail Stop: T6-A10M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by email to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0011)
OMB, Washington, DC 20503.
December 2, 2025
T. Brown 2
The NRC may not conduct nor sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid OMB control number.
In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRCs Rules of Practice, a copy of this letter, its enclosures, and your response (if any) will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records System (PARS) component of NRCs Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If there are any questions about the material requested, or the inspection in general, please contact me at 630-829-9595 or Thomas.Briley@nrc.gov.
Sincerely, Thomas Briley Senior Reactor Inspector Engineering Branch 1 Division of Operating Reactor Safety Docket No. 05000440 License No. NPF-58
Enclosure:
1.Requested Information to Support Age-Related Degradation Sample Selection 2.Requested Information to Support Age-Related Degradation Inspection cc: Distribution via LISTSERV Signed by Briley, Thomas on 12/02/25
T. Brown 3
Letter to Terry Brown from Thomas Briley dated December 2, 2025.
SUBJECT:
PERRY NUCLEAR POWER PLANT - REQUEST FOR INFORMATION FOR THE NRC AGE-RELATED DEGRADATION INSPECTION: INSPECTION REPORT 05000440/2026010 DISTRIBUTION:
Rodney Clagg RidsNrrPMPerry Resource RidsNrrDorlLpl3 RidsNrrDroIrib Resource Jack Giessner Mohammed Shuaibi Diana Betancourt-Roldan John Pelchat Jared Heck Jennifer Dalzell R3-DORS ADAMS Accession Number: ML25335A076
SUNSI Review
Non-Sensitive
Sensitive
Publicly Available
Non-Publicly Available OFFICE RIII NAME TBriley:anm DATE 12/02/2025 OFFICIAL RECORD COPY
- Requested Information to Support Age-Related Degradation Sample Selection The documents and information requested below should generally be made electronically available to the inspection team for the teams use both on-site and off-site. At the end of the inspection, the documents in the teams possession should not be retained.
This document request is based on typical documents that a generic plant might have. As such, this document request is not meant to imply that any specific plant is required to have all the listed documents. In addition, your plant-specific document titles may vary from the document titles listed below.
The following information is requested by December 30, 2025, or sooner, to facilitate the sample selections.
Documents requested, if applicable:
1.
List of 10 CFR 50.65(a)(1) SSCs from the past 5 years 2.
List of maintenance rule functional failures (including preventable) from the past 5 years 3.
Most recent evaluation of maintenance effectiveness required per 10 CFR 50.65(a)(3) 4.
Maintenance rule scoping and performance criteria document 5.
List of preventative maintenance deferrals and preventative maintenance change requests in the last 5 years 6.
Equipment reliability characterization and preventative maintenance program procedures 7.
List of 10 CFR Part 21 Reports applicable to the site from the past 5 years 8.
Site specific corrective actions associated with component failures, or tagged with aging, age-related, wear, accelerated wear, abnormal wear, accelerated degradation, abnormal degradation, corrosion, degradation, etc.
9.
List of technical specification operability determinations from the past 5 years 10.
List of risk-significant long-lived passive SSCs (for licensees in the period of extended operation (PEO))
11.
Aging management programs (AMPs) and any plant-specific or industry operating experience reviews that have been used to update aging management activities (for licensees in the period of extended operation) 12.
List of top 100 most risk-significant structures and components. If possible, designate the component as active or passive in the risk ranking 13.
List of RISC-1, RISC-2, and RISC-3 SSCs (for licensees that implement 10 CFR 50.69) 14.
Safety significant functions identified during the RISC categorization process, and alternative treatment requirements (for licensees that implement 10 CFR 50.69) 15.
Last feedback and process adjustment required per 10 CFR 50.69(e)(1)
(for licensees that implement 10 CFR 50.69) 16.
Site specific probabilistic risk assessment (PRA) identifying risk-significant functions 17.
List of systems (system numbers/designators and corresponding names)
- Requested Information to Support Age-Related Degradation Inspection The team lead will identify samples (i.e., structures and components) after receipt of information requested in enclosure 1. The documents and information requested below should generally be made electronically available to the inspection team for the teams use both on-site and off-site.
At the end of the inspection, the documents in the teams possession should not be retained.
This document request is based on typical documents that a generic plant might have.
As such, this document request is not meant to imply that any specific plant is required to have all the listed documents. In addition, your plant-specific document titles may vary from the document titles listed below. We also request that the information provided be sorted by the list below for each sample.
The following information is requested by January 16, 2026, or sooner, to facilitate the inspection.
1.
List of corrective action documents for the last 10 years 2.
Maintenance, surveillance, testing, inspection, and condition monitoring testing requirements, acceptance criteria, and periodicities 3.
Bases documents associated with maintenance, surveillance, testing, inspection, and condition monitoring testing requirements, acceptance criteria, and periodicities 4.
Last 2 years of maintenance, surveillance, testing, inspection, and condition monitoring testing results; for periodicities greater than 2 years, the last 2 test results 5.
Self-imposed and vendor recommendations 6.
If available, a)
Equipment reliability category/characterization (e.g., non-critical, run-to-maintenance, etc.)
b)
Preventative maintenance templates for the maintenance strategy c)
System design basis documents and the specific updated final safety analysis report section that describes the function d)
Piping and instrumentation drawings (P&IDs) and electrical one-line drawings e)
Control circuit drawings f)
Design/procurement specifications g)
List of applicable modifications for the component If you have questions regarding the information requested, please contact the lead inspector.