TRISO-X Document Request - Construction Inspection and Management Measure Inspection
ML25328A055
Person / Time
Site: Triso-X
Issue date: 11/24/2025
From: Oelstrom C
NRC/RGN-II/DFFI
To: Wheeler J
Triso-X
References
Download: ML25328A055 (0)


Text

From:

Chad Oelstrom To:

Jennifer Wheeler Cc:

Cynthia Taylor; Anthony Ponko; Jose Vasquez; Brandon Bout; Eric C Michel

Subject:

TRISO-X Document Request - Construction Inspection and Management Measure Inspection Date:

Thursday, November 20, 2025 2:43:00 PM Attachments:

2025-004 TrisoX Foundation and MM Document Request.pdf

Jennifer,

This email is to notify you that the U.S. Nuclear Regulatory Commission (NRC) Region II will conduct a construction and management measures program inspection at the proposed TRISO-X facility during the week of December 8, 2025. The inspection will focus on the core inspection procedures described in Inspection Manual Chapter 2694; and will use Inspection Procedures 88200.A - Inspection of Foundations and Buildings at Fuel Cycle Facilities, 88200.B - Inspection of Structural Concrete at Fuel Cycle Facilities, and 88201 - Inspection of Management Measures during Construction of Fuel Cycle Facilities. The inspection results will be documented in an integrated Inspection Report 2025-004.

I am the lead inspector for the inspection along with Cynthia Taylor and Anthony Ponko.

Brandon Bout will be accompanying us in a training capacity, so wont be charging time. As previously mentioned, Eric Michel and LaDonna Suggs will also be onsite one day that week.

We have not confirmed which day.

Experience has shown that these inspections are resource intensive both for the NRC inspectors and your staff. To minimize the impact to your onsite resources and to conduct a productive inspection, I have attached a request for documents needed for this inspection. It is important that all these documents are up to date, complete, and ready for the inspectors upon arrival at the facility. As previously discussed, these documents should be uploaded to the sharepoint site. Please also let me know if we need to complete site access training, badging and or take other actions before or upon arrival to your site.

For Tuesday 12/2/2025 we are available after 1:00 pm EST to further discuss the inspection, construction schedule, and logistics.

If there are any questions about this inspection or the material requested, including if you note items that are unclear or unduly burdensome, please contact me by email, or at 404-997-4551.

Thank you,

Chad Oelstrom, P.E.

Fuel Facility Project Inspector USNRC Region II (404) 997-4551