(}, Xcel Energy*
November 20, 2025 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Prairie Island Nuclear Generating Plant Units 1 and 2 Docket Nos. 50.282 and 50-306 Renewed Facility Operating License DPR-42 and DPR-60 Response to Request for Confirmatory Information for 10 CFR 50.55a Request 6-IST-RR-01 (EPID L-2025-LLR-0041) 1717 Wakonade Drive Welch, MN 55089 L-P 1-25-04 7 10 CFR 50.55a
References:
- 1) NSPM Letter to NRC, "10 CFR 50.55a Request 6-IST-RR-01 Associated with the lnservice Testing Program," dated April 2, 2025 (ADAMS Accession No. ML250093A006)
Prairie Island 1 &2 Relief Request Associated with the lnservice Testing Program (EPID No. L-2025-LLR-0041)," dated November 18, 2025 Northern States Power Company, a Minnesota corporation, doing business as Xcel Energy (hereafter "NSPM"), submitted a 10 CFR 50.55a request associated with the Prairie Island Nuclear Generating Plants, Units 1 and 2, lnservice Testing Program (Reference 1 ). On November 18, 2025, the NRC provided a request for confirmatory information (RCI)
(Reference 2). The enclosure to this letter provides NSPM's response to Reference 2.
Please contact Ron Jacobson at 612-330-6542 or ronald.g.jacobson@xcelenergy.com if there are any questions or if further information is needed.
Summary of Commitments (1.
This ~et er makes 1
no new commitments and no revisions to existing commitments.
- U~\\..-LtuUA-)
Bryan c b.J er Plant Manager, Prairie Island Nuclear Generating Plant Northern States Power Company - Minnesota Connected
- Committed
- Trustworthy
- Safe
Document Control Desk L-Pl-25-047 Page 2 Enclosure cc:
Administrator, Region Ill, USNRC Project Manager, Prairie Island, USNRC Resident Inspector, Prairie Island, USNRC
Enclosure L-Pl-25-047 Response to RCI for RR-001 NSPM Northern States Power Company, a Minnesota corporation, doing business as Xcel Energy (hereafter "NSPM"), submitted a 10 CFR 50.55a request associated with the Prairie Island Nuclear Generating Plants, Units 1 and 2, lnservice Testing Program (Reference 1 ). On November 18, 2025, the NRC issued a request for confirmatory information (RCI) (Reference 2). Below is the NRC RCI question (in italics) and the NSPM response.
Question 1:
Request for Confirmatory Information (RC/)
The licensee submitted Request 6-IST-RR-01 for Prairie Island, Units 1 and 2, as an alternative request under 10 CFR 50.55a(z)(1) as providing an acceptable level of quality and safety. In the submittal, the licensee states that the pump bearings for the two Diesel Driven Cooling Water (DDCL) pumps are inaccessible for vibration measurements. The licensee a/so states that to remove the bearing housing cover for the Motor Driven Cooling Water (MDCL) pump is a potential personnel hazard while the pump is running and thus taking direct readings is not practical. With these reasons specified in the request, the NRC staff considers that the request is more appropriate as a relief request than an alternative request. The licensee is requested to confirm that the submittal can be evaluated as a relief request under 10 CFR 50.55a(f)(5) and (f)(6).
Response to Question 1 NSPM confirms that the submittal (Reference 1) can be evaluated as a relief request under 10 CFR 50.55a(f)(5) and (f)(6).
References
- 1. NSPM Letter to NRC, "10 CFR 50.55a Request 6-IST-RR-01 Associated with the lnservice Testing Program," dated April 2, 2025 (ADAMS Accession No. ML250093A006).
- 2. Beth Wetzel (NRC) E-mail to Michael A. Miller (NSPM), "Final RCI - Prairie Island 1 &2 Relief Request Associated with the lnservice Testing Program (EPID No. L-2025-LLR-0041 )," dated November 18, 2025.