Form 2.1-1 Examination Preparation Checklist Facility: ____Millstone Unit 3__________

Developed by: Written:

Facility NRC Date of Examination: __09/15/2025___

//

Operating:

Facility NRC Target Date*

Task Description Chief Examiners Initials

-240 1.

Examination administration date confirmed (A.1-5). For NRC-prepared examinations, arrangements are made for the facility licensee to submit reference materials (B.4, C.4.g and F).

MPP

-210 2.

NRC examiners and facility licensee contact assigned (B.1 and C.1-3).

MPP

-210 3.

Facility licensee contact briefed on examination security and other requirements (D.4). As applicable, the facility licensee contact submits to the NRC any prescreened K/As for elimination from the written examination outline, with a description of the facility licensees prescreening process (ES-4.1 A.1.a and ES-4.1 B.2).

MPP

-210 4.

Reference material due for NRC-prepared examinations (F).

N/A

-210 5.

Examination kick-off call held (C.4). The NRC sends the corporate notification letter (A.5).

MPP

-195 6.

Written examination outline developed by the NRC and sent to the facility licensee contact (must be on the examination security agreement) (B.2, ES-4.1 A.1.b and ES-4.1 A.2.a).

MPP

-150 7.

Operating test outlines and checklists due: Forms 1.3-1, 2.3-1, 3.2-1, 3.2-2, 3.3-1, and 3.4-1, as applicable (B.6). Facility licensee provides a draft operating test administration schedule to the NRC (B.18).

MPP

-136 8.

Operating test outlines reviewed by the NRC and feedback provided to the facility licensee (ES-2.3).

MPP

-100 9.

NRC-prepared examinations approved by the NRC supervisor and forwarded for facility licensee review (ES-2.3).

MPP

-75

10. Proposed examinations (written, JPMs, and scenarios, as applicable) and outline forms; quality checklists and supporting documentation (including Forms 2.3-2 and 2.3-4 and any Form 2.3-1, 1.3-1, and 3.4-1 updates); and reference materials due.

MPP

-60

11. Preliminary waiver/excusal requests due (ES-2.2 E.1).

MPP

-50

12. Written examination and operating test reviews completed (ES-2.3). The NRC supervisors authorization to proceed with the facility review granted (ES-2.3 D).

MPP

-50

13. Examination review results discussed between the NRC and the facility licensee (B.14).

MPP

-35

14. Examination preparatory week conducted by the NRC and the facility licensee (I).

MPP

-30

15. Preliminary license applications, including any waiver/excusal requests, due (ES-2-2 C.1).

MPP

-14

16. Final license applications, including any waiver/excusal requests, due and Form 2.2-1 prepared (ES-2.2 C and E).

MPP

-7

17. Written examinations and operating tests approved by the NRC supervisor (C.9)

MPP

-7

18. Facility licensee management feedback on the examination requested by the NRC supervisor (C.10).

MPP

-7

19. Final applications reviewed; 10% of applications audited to confirm qualifications/eligibility (ES-2.2 G); and examination approval letter (Letter 2.3-1) and waiver/excusal letters sent.

MPP

-7

20. Written examination administration guidelines reviewed with the facility licensee (D.14).

MPP

-7

21. Approved scenarios and job performance measures distributed to NRC examiners (D.12).

MPP

  • Target dates are based on facility licensee-prepared examinations and the examination date identified in the corporate notification letter. These dates are for planning purposes and may be adjusted in coordination with the facility licensee.

Form 3.4-1 Events and Evolutions Checklist Rev 1 Facility: Millstone Unit 3 Date of Exam: 9/15/2025 Operating Test No.: 2025 NRC A

P P

L I

C A

N T

E V

E N

T T

Y P

E Scenarios 1

2 4

N/A T

O T

A L

M I

N I

M U

M(*)

POSITION POSITION POSITION POSITION S

R O

A T

C B

O P

S R

O A

T C

B O

P S

R O

A T

C B

O P

S R

O A

T C

B O

P R

O I

U RO 1

SRO-I SRO-U RX 1

1 1

1 0

NOR 0**

1 1

1 I/C 3,4,7 1,2,6 6

4 4

2 MAJ 6

4 2

2 2

1 Man Cntl 4

1 2

1 1

0 TS 0

0 2

2 RO 2

SRO-I SRO-U RX 2

1 1

1 0

NOR 1

1 1

1 1

I/C 2,5,8 3,5 5

4 4

2 MAJ 6

4 2

2 2

1 Man Cntl 2

3 2

1 1

0 TS 0

0 2

2 RO 3,4 SRO-I SRO-U RX 1

1 1

1 0

NOR 1

1 1

1 1

I/C 2,5,8 1,2,6 2,4,7 9

4 4

2 MAJ 6

4 5

3 2

2 1

Man Cntl 2

1 4,7 4

1 1

0 TS 0

0 2

2 RO SRO-I 1,3 SRO-U RX 1

1 1

1 0

NOR 1

1 1

1 1

I/C 3,4,7 1,2,3 3,6 8

4 4

2 MAJ 6

4 5

3 2

2 1

Man Cntl 4

3,6 3

1 1

0 TS 1,3 2

0 2

2 RO SRO-I 2,4 SRO-U RX 2

1 1

1 0

NOR 1

1 1

1 1

I/C 3,5 2,3,4 5

4 4

2 MAJ 4

5 2

2 2

1 Man Cntl 3

1 1

1 0

TS 2,4 2

0 2

2

    • Normal evolutions may be replaced w/ additional I/C malfunctions on a one-for-one basis.

Form 3.4-1 Events and Evolutions Checklist Rev 1 Facility: Millstone Unit 3 Date of Exam: 9/15/2025 Operating Test No.: 2025 NRC A

P P

L I

C A

N T

E V

E N

T T

Y P

E Scenarios 1

2 N/A N/A T

O T

A L

M I

N I

M U

M(*)

POSITION POSITION POSITION POSITION S

R O

A T

C B

O P

S R

O A

T C

B O

P S

R O

A T

C B

O P

S R

O A

T C

B O

P R

O I

U RO SRO-I SRO-U 1

RX 0

1 1

0 NOR 1

1 1

1 1

I/C 2,3,4,5 1,2,3 7

4 4

2 MAJ 6

4 2

2 2

1 Man Cntl 0

1 1

0 TS 3,4 1,3 4

0 2

2 RO SRO-I SRO-U 2,3 RX 0

1 1

0 NOR 1

1 1

1 1

I/C 2,3,4,5 4

4 4

2 MAJ 6

1 2

2 1

Man Cntl 0

1 1

0 TS 3,4 2

0 2

2 RO SRO-I SRO-U RX 1

1 0

NOR 1

1 1

I/C 4

4 2

MAJ 2

2 1

Man Cntl 1

1 0

TS 0

2 2

RO SRO-I SRO-U RX 1

1 0

NOR 1

1 1

I/C 4

4 2

MAJ 2

2 1

Man Cntl 1

1 0

TS 0

2 2

    • Normal evolutions may be replaced w/ additional I/C malfunctions on a one-for-one basis.

Form 3.4-1 Events and Evolutions Checklist Rev 1 Facility: Millstone Unit 3 Date of Exam: 9/15/2025 Operating Test No.: 2025 NRC A

P P

L I

C A

N T

E V

E N

T T

Y P

E Scenarios SPARE (3)

N/A N/A N/A T

O T

A L

M I

N I

M U

M(*)

POSITION POSITION POSITION POSITION S

R O

A T

C B

O P

S R

O A

T C

B O

P S

R O

A T

C B

O P

S R

O A

T C

B O

P R

O I

U RO SRO-I SRO-U RX 2

1 1

0 NOR 1

1 1

1 1

I/C 2,3,4 3,6 2,4,7,8 4

4 2

MAJ 5

5 5

2 2

1 Man Cntl 3

7 1

1 0

TS 1,4 0

2 2

    • Normal evolutions may be replaced w/ additional I/C malfunctions on a one-for-one basis.