Clinch River Project, Submittal of Audit Responses in Support of the Construction Permit Application
ML25303A103
Person / Time
Site: 05000615
Issue date: 10/30/2025
From: Hunnewell S
Tennessee Valley Authority
To:
Office of Nuclear Reactor Regulation, Document Control Desk
Shared Package
ML25303A102 List:
References
NNP-25-010
Download: ML25303A103 (1)


Text

1101 Market Street, Chattanooga, Tennessee 37402 NNP-25-010 October 30, 2025 10 CFR 50.30 10 CFR 50.34 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-001 Clinch River Project NRC Docket No. 05000615

Subject:

Submittal of Audit Responses in Support of the Clinch River Nuclear Site Construction Permit Application References

1. Tennessee Valley Authority, Submittal of the Preliminary Safety Analysis Report and Exemptions and Variances in Support of the Clinch River Nuclear Site Construction Permit Application, dated May 20, 2025 (ML25140A602)
2. U.S. Nuclear Regulatory Commission, Acceptance for Docketing of Part Two of the Application for a Construction Permit at The Clinch River Nuclear Site, dated July 9, 2025 (ML25182A151)
3. U.S. Nuclear Regulatory Commission, Audit Plan for the Staff Review of The Tennessee Valley Authority Clinch River Nuclear Site, Unit 1 Construction Permit Application, dated July 14, 2025 (ML25191A113)

By letter May 20, 2025 (ML25140A062), Tennessee Valley Authority (TVA) submitted Part 2 of an application for a construction permit (CP) to the U.S. Nuclear Regulatory Commission (NRC) including the Preliminary Safety Analysis Report (PSAR) and Exemptions and Variances (Reference 1). In a letter dated July 9, 2025, the NRC stated it had accepted for review Part 2 of the application (Reference 2). The NRC staff is currently conducting an audit of the CRN CPA (Reference 3).

The purpose of this letter is to provide NRC audit questions, associated TVA responses and PSAR changes supporting the TVA responses. TVA-identified Construction Permit Application PSAR revisions are also included in Enclosures 2.

U.S. Nuclear Regulatory Commission NNP-25-010 Page 2 October 30, 2025 of this letter contains NRC audit questions and associated TVA responses.

of this letter contains the Clinch River Nuclear Site Construction Permit Application, PSAR changes.

This letter makes no regulatory commitments and no revisions to any existing regulatory commitments.

Please address any questions regarding this application to Mr. Ray Schiele, Senior Manager Licensing, New Nuclear Program, at rjschiele@tva.gov.

I declare under penalty of perjury that the foregoing is true and correct. Executed on this 30th day of October 2025.

Sincerely, Scott W. Hunnewell Vice President, New Nuclear Program

Enclosures:

1. Clinch River Nuclear Site Construction Permit Application, NRC Audit Questions and TVA Responses
2. Clinch River Nuclear Site Construction Permit Application, Preliminary Safety Analysis Report Changes cc: (with Enclosures):

Mahmoud MJ Jardaneh, Branch Chief, New Reactor Licensing Branch Daniel Barnhurst, Branch Chief, Environmental Review New Reactors Branch Allen H. Fetter, NRC Project Manager, Clinch River Nuclear Site Madelyn Nagel, Project Manager, Environmental Review of New Reactors Branch

U.S. Nuclear Regulatory Commission NNP-25-010 Page 3 October 30, 2025 KM:RJS bcc (w/out Enclosures):

G. A. Boerschig R. M. Deacy R. E. Detwiler R. C. Dreke J. E. Dufner M. J. Durr D. C. Erb J. H. Holcomb J. Hopson K. D. Hulvey M. Hunter D. Moul E. C. Meade M. M. Rasmussen R. J. Schiele W. P. Trombley ECM