ML25287A166
| ML25287A166 | |
| Person / Time | |
|---|---|
| Site: | Hope Creek |
| Issue date: | 09/03/2025 |
| From: | Public Service Enterprise Group |
| To: | Joseph Demarshall NRC/RGN-I/DORS/OB |
| References | |
| EPID L-2025-OLL-0014 | |
| Download: ML25287A166 (0) | |
Text
Facility 8/11/2025 Facility 8/15/2025 Exam Date Target Date Date Complete
-240 12/14/2024 JD 11/15/2024
-210 1/13/2025 JD 11/15/2024
-210 1/13/2025 JD 11/15/2024
-210 1/13/2025 N/A
-210 1/13/2025 JD 11/15/2024
-195 1/28/2025 JD 11/15/2024
-150 3/14/2025 JD 3/14/2025
-136 3/28/2025 JD 3/31/2025
-100 5/3/2025 N/A
-75 5/28/2025 JD 5/28/2025
-60 6/12/2025 JD 6/12/2025 Form 2.1-1 Examination Preparation Checklist OPERATING Exam COMPLT Date:
- 6. Written examination outline developed by the NRC and sent to the facility licensee contact (must be on the examination security agreement) (B.2, ES-4.1 A.1.b and ES-4.1 A.2.a).
- 7. Operating test outlines and checklists due: Forms 1.3-1, 2.3-1, 3.2-1, 3.2-2, 3.3-1, and 3.4-1, as applicable (B.6). Facility licensee provides a draft operating test administration schedule to the NRC (B.18).
Hope Creek Facility 8/20/2025 Task Description OPERATING Exam START Date:
- 1. Examination administration date confirmed (A.1-5). For NRC-prepared examinations, arrangements are made for the facility licensee to submit reference materials (B.4, C.4.g and F).
- 8. Operating test outlines reviewed by the NRC and feedback provided to the facility licensee (ES-2.3).
- 9. NRC-prepared examinations approved by the NRC supervisor and forwarded for facility licensee review (ES-2.3).
- 10. Proposed examinations (written, JPMs, and scenarios, as applicable) and outline forms; quality checklists and supporting documentation (including Forms 2.3-2 and 2.3-4 and any Form 2.3-1, 1.3-1, and 3.4-1 updates); and reference materials due.
- 11. Preliminary waiver/excusal requests due (ES-2.2 E.1).
- 2. NRC examiners and facility licensee contact assigned (B.1 and C.1-3).
- 3. Facility licensee contact briefed on examination security and other requirements (D.4). As applicable, the facility licensee contact submits to the NRC any prescreened K/As for elimination from the written examination outline, with a description of the facility licensees prescreening process (ES-4.1 A.1.a and ES-4.1 B.2).
- 4. Reference material due for NRC-prepared examinations (F).
- 5. Examination kick-off call held (C.4). The NRC sends the corporate notification letter (A.5).
WRITTEN Exam Developed By:
WRITTEN Exam Date:
OPERATING Exam Developed By:
Page 1 of 4
-50 6/22/2025 JD 6/20/2025
-50 6/22/2025 JD 6/20/2025
- 12. Written examination and operating test reviews completed (ES-2.3). The NRC supervisors authorization to proceed with the facility review granted (ES-2.3 D).
- 13. Examination review results discussed between the NRC and the facility licensee (B.14).
Page 2 of 4
Facility 8/11/2025 Facility 8/15/2025 Exam Date Target Date Date Complete
-35 7/7/2025 JD 7/14/2025
-30 7/12/2025 JD 7/11/2025
-14 7/28/2025 JD 7/28/2025
-7 8/4/2025 JD Written (8/15/2025)
JD Op Test (8/7/2025)
-7 8/4/2025 JD 8/5/2025
-7 8/4/2025 JD 8/4/2025
-7 8/4/2025 JD 8/15/2025
-7 8/4/2025 JD 8/7/2025
- 20. Written examination administration guidelines reviewed with the facility licensee (D.14).
- 21. Approved scenarios and job performance measures distributed to NRC examiners (D.12).
- Target dates are based on facility licensee-prepared examinations and the examination date identified in the corporate notification letter. These dates are for planning purposes and may be adjusted in coordination with the facility licensee.
Form 2.1-1 Examination Preparation Checklist Hope Creek OPERATING Exam START Date:
WRITTEN Exam Developed By:
Facility OPERATING Exam Developed By:
WRITTEN Exam Date:
- 14. Examination preparatory week conducted by the NRC and the facility licensee (I).
- 15. Preliminary license applications, including any waiver/excusal requests, due (ES-2-2 C.1).
- 16. Final license applications, including any waiver/excusal requests, due and Form 2.2-1 prepared (ES-2.2 C and E).
- 17. Written examinations and operating tests approved by the NRC supervisor (C.9)
- 18. Facility licensee management feedback on the examination requested by the NRC supervisor (C.10).
- 19. Final applications reviewed; 10% of applications audited to confirm qualifications/eligibility (ES-2.2 G); and examination approval letter (Letter 2.3-1) and waiver/excusal letters sent.
8/20/2025 OPERATING Exam COMPLT Date:
Task Description Page 3 of 4
Facility: Hope Creek Date of Exam: 8-11-25 Operating Test No.: 1 A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios 1
2 3
4 T
O T
A L
M I
N I
M U
M(*)
POSITION POSITION POSITION POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
I U
SROU1 RX 0
1 1
0 NOR 1,2 2
1 1
1 I/C 3,5,6, 8
4 4
4 2
MAJ 7
1 2
2 1
Man Ctrl 0
1 1
0 TS 3,4 2
0 2
2 SROU2 RX 0
1 1
0 NOR 1,2 2
1 1
1 I/C 3,5,6, 8
4 4
4 2
MAJ 7
1 2
2 1
Man Ctrl 0
1 1
0 TS 3,4 2
0 2
2 SROI1 RX 1
1 1
1 0
NOR 1
1,2 3
1 1
1 I/C 3,4,8, 9
2,6, 8,9 3,5,6, 8
12 4
4 2
MAJ 6
7 7
3 2
2 1
Man Ctrl 8
1 1
1 0
TS 3,4 2
0 2
2 SROI2 RX 1
1 1
1 0
NOR 1
1,2 3
1 1
1 I/C 3,4,8, 9
2,6, 8,9 3,5,6, 8
12 4
4 2
MAJ 6
7 7
3 2
2 1
Man Ctrl 8
1 1
1 0
TS 3,4 2
0 2
2 SROI3 RX 1
1 1
1 0
NOR 1,2 1
3 1
1 1
I/C 3,4, 5,7, 8,9 2,6, 8,9 3,5,6, 8
14 4
4 2
MAJ 6
7 7
3 2
2 1
Man Ctrl 3,5 2
1 1
0 TS 3,4 2
0 2
2 Form 3.4-1 Events and Evolutions Checklist
Facility: Hope Creek Date of Exam: 8/11/25 Operating Test No.:1 A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios 1
2 3
4 T
O T
A L
M I
N I
M U
M(*)
POSITION POSITION POSITION POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
I U
SROI4 RX 1
1 0
NOR 1,2 1
3 1
1 1
I/C 3,4,5
,7,8, 9
3,5,6, 8
10 4
4 2
MAJ 6
7 2
2 2
1 Man Ctrl 3,5 2
1 1
0 TS 3,4 2
0 2
2 SROI5 RX 2
1 1
1 0
NOR 1
1 2
1 1
1 I/C 4,5,7 2,3,4, 6,8,9 3,5,6, 8
13 4
4 2
MAJ 6
7 7
3 2
2 1
Man Ctrl 4
3,5 3
1 1
0 TS 3,4,5 3
0 2
2 SROI6 RX 1
1 0
NOR 1
1 2
1 1
1 I/C 2,3,4, 6,8,9 3,5,6, 8
10 4
4 2
MAJ 7
7 2
2 2
1 Man Ctrl 3,5 2
1 1
0 TS 3,4,5 3
0 2
2 SRO17 RX 2
1 1
1 0
NOR 1
1 2
1 1
1 I/C 3,4,8, 9
2,3,4, 6,8,9 6
11 4
4 2
MAJ 6
7 7
3 2
2 1
Man Ctrl 8
1 1
1 0
TS 3,4,5 3
0 2
2 SRO18 RX 2
1 1
1 0
NOR 1,2 2
1 1
1 I/C 3,4,5
,7,8, 9
3,4,6, 8,9 6
12 4
4 2
MAJ 6
7 7
3 2
2 1
Man Ctrl 8
1 1
1 0
TS 3,4 2
0 2
2
- Per ES 3.4 C.2.(9) - For SROIs 4 and 6, the Reactivity Manipulation was replaced by an additional I/C failure.
Form 3.4-1 Events and Evolutions Checklist
Facility: Hope Creek Date of Exam: 8/11/25 Operating Test No.:1 A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios 1
2 3
4 T
O T
A L
M I
N I
M U
M(*)
POSITION POSITION POSITION POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
I U
RO 1 RX 2
2 2
1 1
0 NOR 1
1 1
I/C 4,5,7 3,4,6, 8,9 6
9 4
4 2
MAJ 6
7 7
3 2
2 1
Man Ctrl 4
8 2
1 1
0 TS 0
0 2
2 RO2 RX 2
2 2
1 1
0 NOR 1
1 1
I/C 4,5,7 3,4,6, 8,9 6
9 4
4 2
MAJ 6
7 7
3 2
2 1
Man Ctrl 4
8 2
1 1
0 TS 0
0 2
2
- Per ES 3.4 C.2.(9) - For ROs 1 and 2, the Normal Evolution was replaced by an additional I/C failure.
Form 3.4-1 Events and Evolutions Checklist