Submittal of Further Technical Information and Audit Responses in Support of the Clinch River Nuclear Site Construction Permit Application
ML25275A436
Person / Time
Site: 05000615
Issue date: 10/01/2025
From: Hunnewell S
Tennessee Valley Authority
To:
Office of Nuclear Reactor Regulation, Document Control Desk
Shared Package
ML25275A435 List:
References
NNP-25-009
Download: ML25275A436 (1)


Text

Security-Related Information - Withhold Under 10 CFR 2.390 This page is decontrolled when separated from Enclosure 4.

TENNESSEE VALLEY AUTHORITY 1101 Market Street, Chattanooga, Tennessee 37 402 NNP-25-009 October 1, 2025 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-001 Clinch River Project NRC Docket No. 05000615 10 CFR 50.30 10 CFR 50.34 10 CFR 2.390

Subject:

Submittal of Further Technical Information and Audit Responses in Support of the Clinch River Nuclear Site Construction Permit Application References

1. Tennessee Valley Authority, Submittal of the Preliminary Safety Analysis Report and Exemptions and Variances in Support of the Clinch River Nuclear Site Construction Permit Application, dated May 20, 2025 (ML25140A602)
2. U.S. Nuclear Regulatory Commission, Acceptance for Docketing of Part Two of the Application for a Construction Permit at The Clinch River Nuclear Site, dated July 9, 2025 (ML25182A151)
3. U.S. Nuclear Regulatory Commission, Audit Plan for the Staff Review of The Tennessee Valley Authority Clinch River Nuclear Site, Unit 1 Construction Permit Application, dated July 14, 2025 (ML25191A113)

By letter May 20, 2025 (ML25140A062), Tennessee Valley Authority (TVA) submitted Part 2 of an application for a construction permit (CP) to the U.S. Nuclear Regulatory Commission (NRC) including the Preliminary Safety Analysis Report (PSAR) and Exemptions and Variances (Reference 1 ). In a letter dated July 9, 2025, the NRC stated it had accepted for review Part 2 of the application (Reference 2). The NRC staff is currently conducting an audit of the CRN CPA (Reference 3).

Security-Related Information - Withhold Under 10 CFR 2.390 This page is decontrolled when separated from Enclosure 4.

Security-Related Information - Withhold Under 10 CFR 2.390 This page is decontrolled when separated from Enclosure 4.

U.S. Nuclear Regulatory Commission NNP-25-009 Page 2 October 1, 2025 The purpose of this letter is to provide additional technical information required by CRN Site CPA Enclosure 2, PSAR Section 1.5, Further Technical Information-Seismic Analysis. In addition, this letter also contains NRC audit questions, associated TVA responses and PSAR changes supporting the TVA responses. TVA-identified CPA PSAR revisions are included in Enclosures 3 and 4. of this letter contains the updated CRN Site CPA, PSAR Section 1.5, Further Technical Information-Seismic Analysis (Public Version). of this letter contains NRC audit questions and associated TVA responses (Public Version). of this letter contains the public version of the CRN Site CPA, PSAR changes (Public Version). of this letter contains the non-public version of the CRN Site CPA, PSAR changes (Non-Public Version). of this letter contains security-related information and, as such, it is requested that it be withheld from public disclosure in accordance with 10 CFR 2.390, "Public inspections, exemptions, requests for withholding." Security-related information has been redacted from the document provided in Enclosure 3 of this letter. Redacted information is identified in Enclosure 3 of this letter by including "Security-Related Information -

Withhold Under 10 CFR 2.390" in the header of the page.

This letter makes no regulatory commitments and no revisions to any existing regulatory commitments.

Please address any questions regarding this application to Mr. Ray Schiele, Senior Manager Licensing, New Nuclear Program, at rjschiele@tva.gov.

I declare under penalty of perjury that the foregoing is true and correct. Executed on this 30th day of September 2025.

~

ly, Scott W. Hunnewell Vice President, New Nuclear Program Security-Related Information - Withhold Under 10 CFR 2.390 This page is decontrolled when separated from Enclosure 4.

Security-Related Information - Withhold Under 10 CFR 2.390 This page is decontrolled when separated from Enclosure 4.

U.S. Nuclear Regulatory Commission NNP-25-009 Page 3 October 1, 2025

Enclosures:

1. CRN Site CPA, PSAR Section 1.5, Further Technical Information-Seismic Analysis (Public Version)
2. CRN Site CPA, NRC Audit Questions and TVA Responses (Public Version)
3. CRN Site CPA, PSAR Changes (Public Version)
4. CRN Site CPA, PSAR Changes (Non-Public Version) cc: (with Enclosures):

Mahmoud MJ Jardaneh, Branch Chief, New Reactor Licensing Branch Daniel Barnhurst, Branch Chief, Environmental Review New Reactors Branch Allen H. Fetter, NRC Project Manager, Clinch River Nuclear Site Madelyn Nagel, Project Manager, Environmental Review of New Reactors Branch Security-Related Information - Withhold Under 10 CFR 2.390 This page is decontrolled when separated from Enclosure 4.