Licensing Board Notification Regarding PSAR Supplement 1
ML25269A210
Person / Time
Site: 05000614
Issue date: 09/26/2025
From: Lighty R
Long Mott Energy, Morgan Lewis
To: Danni Smith, Nicholas Trikouros, Wolfe S
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 57491, ASLBP 25-991-01-CP-BD01, 50-614-CP
Download: ML25269A210 (0)


Text

Ryan K. Lighty Partner

+1.202.739.5274 ryan.lighty@morganlewis.com Morgan, Lewis & Bockius LLP 1111 Pennsylvania Avenue, NW Washington, DC 20004

+1.202.739.3000 United States

+1.202.739.3001 September 26, 2025 Stefan R. Wolfe, Chair Nicholas G. Trikouros Dr. David A. Smith Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Re:

Long Mott Energy, LLC (Long Mott Generating Station), Docket No. 50-614-CP

Subject:

Licensing Board Notification Regarding PSAR Supplement # 1

Dear Administrative Judges:

In accordance with its obligation to inform the Atomic Safety and Licensing Board (Board) of relevant developments,1 Long Mott Energy, LLC (LME) hereby notifies the Board and the participants to the adjudicatory proceeding that today, September 26, 2025, LME submitted Letter No. 2025-PLM-NRC-010 to the U.S. Nuclear Regulatory Commission (NRC).2 The enclosure to that letter provides Supplement #1 to the Preliminary Safety Analysis Report (PSAR) for the Long Mott Generating Station (LMGS) Construction Permit Application (CPA).3 That enclosure consists of a redlined markup of PSAR Section 6.4.2.3 that provides further identification and descriptions of the confirmatory testing and analysis activities that will be conducted for fuel qualification and a schedule of those activities showing that they will be completed before the latest date for completion of construction of LMGS and [o]ther minor editorial changes to improve clarity.4 1

See, e.g., Duke Power Co. (William B. McGuire Nuclear Station, Units 1 & 2), ALAB-143, 6 AEC 623, 625 (1973); Sacramento Mun. Util. Dist. (Rancho Seco Nuclear Generating Station), CLI-93-5, 37 NRC 168, 170 (1993).

2 Letter from C. OConnor, LME, to NRC Document Control Desk, Supplement #1 to the [PSAR]

for the [LMGS] [CPA] (Sept. 26, 2025) (ML25269A125) (LME Letter No. 2025-PLM-NRC-010).

3 Id., Encl. 1.

4 Id. at 1.

Stefan R. Wolfe, Chair September 26, 2025 Page 2 DB3/ 205155400.2 The above-referenced submittal became publicly available in the NRCs Agencywide Documents and Management System (ADAMS) today, September 26, 2025, as well.5 The Board and participants may view that submittal as relevant to San Antonio Bay Estuarine Waterkeepers (Waterkeeper) Proposed Contention 1.6 Respectfully submitted, Signed (electronically) by Ryan K. Lighty RYAN K. LIGHTY, ESQ.

MORGAN, LEWIS & BOCKIUS LLP 1111 Pennsylvania Avenue, N.W.

Washington, D.C. 20004 Phone: 202-739-5274 E-mail: ryan.lighty@morganlewis.com Counsel for Long Mott Energy, LLC Certificate of Service Pursuant to 10 C.F.R. § 2.305, I certify that, on this date, the foregoing Licensing Board Notification Regarding PSAR Supplement # 1 has been filed through the Electronic Information Exchange (the NRCs E-Filing System) on the above-listed docket.

Signed (electronically) by Ryan K. Lighty RYAN K. LIGHTY, ESQ.

Counsel for Pacific Gas and Electric Company 5

See ADAMS Public Search, https://adams-search.nrc.gov/ (Date Added for Accession #

ML25269A125).

6 See [Waterkeeper]s Petition to Intervene and Request for Hearing at 12-22 (Aug. 11, 2025)