Callaway Plant MISSOURI September 24, 2025 ULNRC-06964 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 10 CFR 72.212(b)(4)
Ladies and Gentlemen:
DOCKET NUMBER 50-483 AND 72-1045 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.
RENEWED FACILITY OPERATING LICENSE NPF-30 INDEPENDENT SPENT FUEL STORAGE INSTALLATION UPDATED REGISTRATION OF DRY SPENT FUEL STORAGE CANISTERS Pursuant to 10 CFR 72.212(b)(4), Union Electric Company d/b/a Ameren Missouri, herewith provides updated registration information for the dry spent fuel storage casks currently stored on the Callaway plant property under a 10 CFR Part 72 general license for the Callaway Plant Independent Spent Fuel Storage Installation (ISFSI).
Callaway Plant currently has 42 multi-purpose canisters (MPCs) stored in the HI-STORM UMAX Canister Storage System. These canisters were placed into storage during loading campaigns in 2015 (6 MPCs), 2018 (12 MPCs), 2021 (12 MPCs), and 2024 (12 MPCs). These 42 canisters were registered pursuant to 10 CFR 72.212(b)(2) by individual letters (detailed in the attached table) under Certificate of Compliance No. 1040, Amendment 0, effective April 6, 2015.
The U.S. Nuclear Regulatory Commission (NRC) has amended its spent fuel storage regulations by revising the Holtec International HI-STORM UMAX Canister Storage System listing within the List of approved spent fuel storage casks to include Revision 1 to Amendment Nos. 0 through 2 to Certificate of Compliance (CoC) No. 1040. Revision 1, effective April 21, 2025.
Callaway Plant is implementing Revision l to Amendment No. 0 of Certificate of Compliance (CoC)
No. 1040, which involves updating the basis for the dose rate limits for the closure lids and modifying the dose rate limit values and description of the locations of the dose rate measurements.
Implementation of Certificate of Compliance (CoC) No. 1040, Revision l to Amendment No. 0, has been completed as of the date of this letter.
8315 County Road 459 Steedman, MO 65077.
AmerenMissouri.com
ULNRC-06964 September 24, 2025 Page 2 of 5 The following information is provided as required by 10 CFR 72.2 12(b)(2):
Licensee Name:
Union Electric Company Licensee Address:
Callaway Nuclear Plant Post Office Box 620 Fulton, MO 65251 Reactor License No:
NPF-30 Docket Nos.:
50-483 and 72-1045 (ISFSI)
Contact Name and
Title:
Jeremy Morton, Supervising Engineer, Regulatory Affairs and Licensing Cask Certificate No.:
Certificate of Compliance No. 1040, Amendment 0, Revision 1, effective April 6, 2015 Cask Model:
HI-STORM UMAX Canister Storage System Cask Identification Nos.:
Multi-Purpose Canister (MPC) Identification Nos:.:
See Attached Table "Updated Registration of Dry Spent Fuel Storage Canister (MPCs)"
Cavity Enclosure Container (CEC) Identification Nos.:
See Attached Table "Updated Registration of Dry Spent Fuel Storage Canister (MPCs)"
The attached table, "Updated Registration of Dry Spent Fuel Storage Canisters (MPCs)," provides the following information for each of the 42 MPCs currently stored at Callaway Plant:
1)
MPC Number (Inservice date) 2)
Cavity Enclosure Container (CEC) Number (ISFSI Location)
- 3) Original Registration Date (ULNRC #)
4)
Original Cask Certificate Number 5)
New Cask Certificate Number
ULNRC-06964 September 24, 2025 Page 3 of 5 This letter does not contain new commitments. For any questions regarding this submittal, please contact Mr. Jeremy Morton, Supervising Engineer, Regulatory Affairs and Licensing, at 314-225-1803.
Sincerely, Memes ls Berri).
Thomas B. Elwood Manager, Regulatory Affairs DS/IWK
Attachment:
Updated Registration of Dry Spent Fuel Storage Canister (MPCs)
ULNRC-06964 September 24, 2025 Page 4 of 5 cc.
Mr. John Monninger Regional Administrator U.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. M. Chawla Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O8BIA Washington, DC 20555-0001 Director Division of Spent Fuel Management Office ofNuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
ULNRC-06964 September 24, 2025 Page 5 of 5 Index and send hardcopy to QA File A160.0761 Hardcopy:
Certrec Corporation 6500 West Freway, Suite 400 Fort Worth, TX 76116 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)
Electronic distribution for the following can be made via Responses and Reports ULNRC Distribution:
NSRB Secretary STARS Regulatory Affairs Mr. Jay Silberg (Pillsbury Winthrop Shaw Pittman LLP)