Finding global solutions to the worlds most critical needs.
Abilene Christian University Nuclear Energy eXperimental Testing Lab ACU Box 28208, Abilene, Texas 79699-8208 acunextlab.org Page 1 of 2 September 15, 2025 Docket No. 50-610 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 205550001
Subject:
Abilene Christian University Molten Salt Research Reactor Degradation Management Program Semiannual Status Update Abilene Christian University (ACU) received a construction permit (CP) for the Molten Salt Research Reactor (MSRR) from the Nuclear Regulatory Commission (NRC) on September 16, 2024 (ML24243A040). Permit condition 3.D requires ACU to submit a report to the NRC on a recurring 6-month period on the application of the Degradation Management Program (DMP), including a summary of any program changes that were made during the period, commencing on the date of CP issuance.
In accordance with permit condition 3.D(b), ACU submitted its DMP to the NRC on December 5, 2024 (ML24340A190). No changes to the DMP have been issued.
This letter and Enclosure 1 provide the second semiannual status update on the implementation of the DMP, covering the period from March 16, 2025, to September 15, 2025, and fulfill the reporting requirement under permit condition 3.D.
Subject matter experts met in April 2025 to implement the DMP process to the MSRRs in-scope components. Enclosure 1 summarizes the work completed, including:
identifying in-scope components, grouping components, defining consequential failure, determining applicable degradation mechanisms, selecting mitigation strategies, identifying design, fabrication, and operation requirements for each component group, and outlining next steps.
If you have questions or need additional information, please contact Lester Towell at lester.towell@acu.edu.
I declare under the penalty of perjury that the information is true and correct. Executed on September 15, 2025.
Respectfully, Rusty Towell, Ph.D.
Director of NEXT Lab
Finding global solutions to the worlds most critical needs.
Abilene Christian University Nuclear Energy eXperimental Testing Lab ACU Box 28208, Abilene, Texas 79699-8208 acunextlab.org Page 2 of 2
Enclosures:
- 1. Degradation Management Program Implementation Update Report (Proprietary)
- 2. Degradation Management Program Implementation Update Report (Public)
- 3. Request for Withholding from Public Disclosure and Affidavit in Accordance with 10 CFR 2.390(a)(4) cc:
Alissa Neuhausen, Chief, NRR Advanced Reactor Licensing Branch 2 Jorge Hernández Munoz, Project Manager, NRR Advanced Reactor Licensing Branch 2 Edward Helvenston, Project Manager, NRR Non-Power Production and Utilization Facility Licensing Branch Brian Bettes, Project Manager, NRR Advanced Reactor Licensing Branch 2