ML25258A160
| ML25258A160 | |
| Person / Time | |
|---|---|
| Site: | North Anna (NPF-004, NPF-007) |
| Issue date: | 09/15/2025 |
| From: | Joel Jenkins Virginia Electric & Power Co (VEPCO) |
| To: | Office of Nuclear Reactor Regulation, Document Control Desk |
| References | |
| 25-223 | |
| Download: ML25258A160 (1) | |
Text
Dominion Energy Virgin ia North Anna Power Station 1022 Haley Drive, Mineral, VA 23117 DominionEnergy.com September 15, 2025 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555 Gentlemen:
i; Dominion
=--' Energy Serial No.25-223 NAPS/RAP Docket Nos. 50-338, 339 License Nos. NPF-4, NPF-7 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION ENERGY VIRGINIA)
NORTH ANNA POWER STATION UNITS 1 AND 2 CATEGORY 1 STRUCTURES - SETTLEMENT MONITORING PROCEDURE REVISION As required by Atomic Safety and Licensing Appeal Board Decision ALAB-578, this letter is to notify you that a revision has been made to periodic test procedure 0-PT-112, Category 1 Structures - Settlement Monitoring.
Periodic test procedure 0-PT-112 has been revised to change the wording associated with when the test is initiated and other administrative changes.
If you have any questions, please contact Matthew A. Hayes at (540) 894-2100.
Very truly yours, l es :n:S-----
Site Vice President Commitments made in this letter: None cc:
Julio Lara - Region II NRC Senior Resident Inspector - North Anna Power Station