Request for Information for the NRC Age-Related Degradation Inspection Inspection Report 05000346/2025012
ML25253A472
Person / Time
Site: Davis Besse 
Issue date: 09/11/2025
From: Thomas Briley
NRC/RGN-III/DORS/EB1
To: Tony Brown
Vistra Operations Company
References
IR 2025012
Download: ML25253A472 (1)


See also: IR 05000346/2025012

Text

Terry Brown

Site Vice President

Vistra Operations Company, LLC

Davis-Besse Nuclear Power Station

5501 N. State Rte. 2, Mail Stop A-DB-3080

Oak Harbor, OH 43449-9760

SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATION - REQUEST FOR

INFORMATION FOR THE NRC AGE-RELATED DEGRADATION

INSPECTION: INSPECTION REPORT 05000346/2025012

Dear Terry Brown:

The purpose of this letter is to request information to support our scheduled age-related

degradation inspection beginning October 20, 2025, at Davis-Besse Nuclear Power Station.

This inspection will be performed in accordance with NRC baseline inspection procedure

71111.21N.04 Age-Related Degradation.

An initial list of documents requested to support identification of structures, systems, and

components (SSCs) that will be reviewed during the inspection is provided in enclosure 1.

For SSCs that the inspection team plans to review, an initial list of the documents the team

plans to review during the conduct of the inspection is listed in enclosure 2. The team leader will

contact you with identified SSCs. Also, personnel should be available at the site during the

inspection who are knowledgeable regarding maintenance, surveillance, testing, inspection, and

condition monitoring programs.

This letter contains voluntary information collections that are subject to the Paperwork

Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB)

approved these information collections (approval number 3150-0011). The burden to the public

for these information collections is estimated to average 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> per response. Send

comments regarding this information collection to the FOIA, Library and Information Collection

Branch, Office of the Chief Information Officer, Mail Stop: T6-A10M, U.S. Nuclear Regulatory

Commission, Washington, DC 20555-0001, or by email to Infocollects.Resource@nrc.gov, and

to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0011)

OMB, Washington, DC 20503.

The NRC may not conduct nor sponsor, and a person is not required to respond to, a request

for information or an information collection requirement unless the requesting document

displays a currently valid OMB control number.

September 11, 2025

T. Brown

2

In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390, Public

Inspections, Exemptions, Requests for Withholding, of the NRC's Rules of Practice, a copy of

this letter, its enclosures, and your response (if any) will be available electronically for public

inspection in the NRCs Public Document Room or from the Publicly Available Records System

(PARS) component of NRCs Agencywide Document Access and Management System

(ADAMS). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

If there are any questions about the material requested, or the inspection in general, please

contact me at 630-829-9595 or Thomas.Briley@nrc.gov.

Sincerely,

Thomas Briley

Senior Reactor Inspector

Engineering Branch 1

Division of Operating Reactor Safety

Docket No. 05000346

License No. NPF-3

Enclosure:

1. Requested Information to Support

Age-Related Degradation Sample

Selection

2. Requested Information to Support

Age-Related Degradation Inspection

cc: Distribution via LISTSERV

Signed by Briley, Thomas

on 09/11/25

T. Brown

3

Letter to Terry Brown from Thomas Briley dated September 11, 2025.

SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATION - REQUEST FOR

INFORMATION FOR THE NRC AGE-RELATED DEGRADATION

INSPECTION: INSPECTION REPORT 05000346/2025012

DISTRIBUTION:

Rodney Clagg

RidsNrrDorlLpl3

RidsNrrPMDavisBesse Resource

RidsNrrDroIrib Resource

Jack Giessner

Mohammed Shuaibi

Diana Betancourt-Roldan

John Pelchat

Jared Heck

Jennifer Dalzell

R3-DORS

ADAMS Accession Number: ML25253A472

SUNSI Review

Non-Sensitive

Sensitive

Publicly Available

Non-Publicly Available

OFFICE

RIII

NAME

TBriley:gmp

DATE

09/11/2025

OFFICIAL RECORD COPY

Enclosure 1

Enclosure 1 - Requested Information to Support Age-Related Degradation Sample

Selection

The documents and information requested below should generally be made electronically

available to the inspection team for the teams use both on-site and off-site. At the end of the

inspection, the documents in the teams possession should not be retained.

This document request is based on typical documents that a generic plant might have. As such,

this document request is not meant to imply that any specific plant is required to have all the

listed documents. In addition, your plant-specific document titles may vary from the document

titles listed below.

The following information is requested by September 29, 2025, or sooner, to facilitate the

sample selections.

Documents requested, if applicable:

1.

List of 50.65 (a)(1) SSCs from the past 5 years.

2.

List of maintenance rule functional failures (including preventable) from the past 5 years

3.

Most recent evaluation of maintenance effectiveness required per 10 CFR 50.65(a)(3)

4.

Maintenance rule scoping and performance criteria document

5.

List of preventative maintenance deferrals and preventative maintenance change

requests in the last 5 years

6.

Equipment reliability characterization and preventative maintenance program procedures

7.

List of 10 CFR Part 21 Reports applicable to the site from the past 5 years

8.

Site specific corrective actions associated with component failures, or tagged with

aging, age-related, wear, accelerated wear, abnormal wear, accelerated

degradation, abnormal degradation, corrosion, degradation, etc.

9.

List of technical specification operability determinations from the past 5 years

10. List of risk-significant long-lived passive SSCs (for licensees in the period of extended

operation (PEO))

11. Aging management programs (AMPs) and any plant-specific or industry operating

experience reviews that have been used to update aging management activities

(for licensees in the period of extended operation)

12. List of top 100 most risk-significant structures and components. If possible, designate

the component as active or passive in the risk ranking

13. List of RISC-1, RISC-2, and RISC-3 SSCs (for licensees that implement 10 CFR 50.69)

2

14. Safety significant functions identified during the RISC categorization process, and

alternative treatment requirements (for licensees that implement 10 CFR 50.69)

15. Last feedback and process adjustment required per 10 CFR 50.69(e)(1) (for licensees

that implement 10 CFR 50.69)

16. Site specific probabilistic risk assessment (PRA) identifying risk-significant functions

17. List of systems (system numbers/designators and corresponding names)

Enclosure 2

Enclosure 2 - Requested Information to Support Age-Related Degradation Inspection

The team lead will identify samples (i.e., structures and components) after receipt of information

requested in enclosure 1. The documents and information requested below should generally be

made electronically available to the inspection team for the teams use both on-site and off-site.

At the end of the inspection, the documents in the teams possession should not be retained.

This document request is based on typical documents that a generic plant might have. As

such, this document request is not meant to imply that any specific plant is required to have all

the listed documents. In addition, your plant-specific document titles may vary from the

document titles listed below. We also request that the information provided be sorted by the

list below for each sample.

The following information is requested by October 13, 2025, or sooner, to facilitate the

inspection.

1.

List of corrective action documents for the last 10 years

2.

Maintenance, surveillance, testing, inspection, and condition monitoring testing

requirements, acceptance criteria, and periodicities

3.

Bases documents associated with maintenance, surveillance, testing, inspection, and

condition monitoring testing requirements, acceptance criteria, and periodicities

4.

Last 2 years of maintenance, surveillance, testing, inspection, and condition monitoring

testing results; for periodicities greater than 2 years, the last two test results

5.

Self-imposed and vendor recommendations

6.

If available

a)

Equipment reliability category/characterization (e.g., non-critical,

run-to-maintenance, etc.)

b)

Preventative maintenance templates for the maintenance strategy

c)

System design basis documents and the specific updated final safety analysis

report section that describes the function

d)

Piping and instrumentation drawings (P&IDs) and electrical one-line drawings

e)

Control circuit drawings

f)

Design/procurement specifications

g)

List of applicable modifications for the component

If you have questions regarding the information requested, please contact the lead inspector.