Constellation September 8, 2025 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
Subject:
Calvert Cliffs Nuclear Power Plant, Unit No. 2 Renewed Facility Operating License No. DPR-69 NRC Docket No. 50-318 Spring 2025 - 180 Day Steam Generator Report Larry D. Smith Manager-Regulatory Assurance Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby. MD 20657 667 313 6503 Office larry sm1th2@constellat1on com TS 5.6.9
Reference:
- 1.
Calvert Cliffs Nuclear Power Plant Units 1 and 2 Technical Specification 5.6.9 In accordance with Reference 1, Attachment (1) provides the results of the steam generator tube inspection conducted on Calvert Cliffs Unit 2 in 2025. This report includes the number and extent of tubes examined and indications identified.
There are no regulatory commitments contained in this letter.
Should you have questions regarding this matter, please contact Mr. Larry D. Smith at (667) 313-6503.
Respectfully, C77b%JZ-Larry D. Smith Manager - Regulatory Assurance LDS/jj
Attachment:
(1) Calvert Cliffs Nuclear Power Plant Unit 2 Steam Generator Tube Inspection Report CC2R26 cc:
(Without Enclosure)
NRC Project Manager, Calvert Cliffs NRC Regional Administrator, Region I NRC Resident Inspector, Calvert Cliffs Z. Barthel, MD-DNR