ML25247A047

From kanterella
Jump to navigation Jump to search
Form 5.1-1 Post Examination Check Sheet
ML25247A047
Person / Time
Site: Clinton 
Issue date: 09/05/2025
From:
NRC/RGN-III/DORS/OB
To:
Constellation Energy Generation
Gregory Roach
Shared Package
ML23202A100 List:
References
Download: ML25247A047 (1)


Text

Form 5.1-1 Post examination Check Sheet Post examination Check Sheet Facility: Clinton Dates of Examination: July 14-23, 2025 Activity Description Date Complete

1. *Received post examination package from facility licensee and verified complete. (ES-4.4) 7/29/2025
2. *Reviewed and incorporated any necessary facility and applicant written examination comments. NRC grading of written examination completed. (ES-4.4) 7/31/2025
3. *Reviewed and incorporated any necessary facility and applicant operating test comments. NRC grading of operating test completed.

(ES-3.6) 8/6/2025

4. *Completed NRC chief examiner review of operating test and written examination grading. (ES-3.6 and ES-4.4) 8/6/2025
5. Completed licensing official review.

8/7/2025

6. Mailed licenses, preliminary results, and pass letters.

8/11/2025

7. Notified facility licensee of results.

8/11/2025

8. Issued the examination report (refer to Operator Licensing Manual Chapter (OLMC) 510, Operator Licensing Examination Reports).

9/5/2025

9. Returned reference material after final resolution of any informal NRC staff reviews, hearing demands, or both.

N/A

10. Performed examination recordkeeping activities (refer to OLMC 520, Operator Licensing Examination Records and Documentation, and Management Directive 3.53, NRC Records and Document Management Program).

9/5/2025

  • Activity may not be applicable for a retake examination. If this activity does not apply, place an N/A in the Date Complete column.