ML25246C209

From kanterella
Jump to navigation Jump to search
Fuel Fabrication Facility September 8, 2025, Pre-Application Meeting on the Leu+ Integrated Safety Analysis Summary - Proprietary and Non-Proprietary Slides
ML25246C209
Person / Time
Site: Westinghouse
Issue date: 09/03/2025
From: Subosits S
Westinghouse
To:
Office of Nuclear Material Safety and Safeguards, Document Control Desk
Shared Package
ML25246C208 List:
References
LTR-RAC-25-41
Download: ML25246C209 (1)


Text

WESTINGHOUSE NON-PROPRIETARY CLASS 3

© 2025 Westinghouse Electric Company LLC All Rights Reserved Director, Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Document Control Desk 11555 Rockville Pike Rockville, Maryland 20852-2738 Direct tel: 803-647-3193 e-mail: stephen.subosit@westinghouse.com Our ref: LTR-RAC-25-41 September 3, 2025

SUBJECT:

COLUMBIA FUEL FABRICATION FACILITY SEPTEMBER 8, 2025, PRE-APPLICATION MEETING ON THE LEU+ INTEGRATED SAFETY ANALYSIS

SUMMARY

PROPRIETARY AND NON-PROPRIETARY SLIDES

Dear Director:

Following the May 16, 2024, pre-application meeting on the proposed license amendment request for the Columbia Fuel Fabrication Facility low enriched uranium plus (LEU+) facility, Westinghouse Electric Company LLC (Westinghouse) requested a focused pre-application meeting to discuss the LEU+ integrated safety analysis summary. The proprietary and non-proprietary slides for the September 8, 2025, pre-application meeting are enclosed with this letter.

This submittal contains proprietary information of Westinghouse. In conformance with the requirements of 10 CFR Section 2.390, as amended, of the Commissions regulations, Westinghouse is enclosing with this submittal an Affidavit. The Affidavit sets forth the basis on which the information identified as proprietary may be withheld from public disclosure by the Commission. Correspondence with respect to the proprietary aspects of this submittal or the Westinghouse Affidavit should reference AW-25-059.

Please contact Camille Zozula, Licensing and Regulatory Affairs for LEU+ if there are questions.

Sincerely, Stephen Subosits Manager, Regulatory Affairs Westinghouse Columbia Fuel Fabrication Facility Docket 70-1151, License SNM-1107 Westinghouse Electric Company LLC Columbia Fuel Fabrication Facility 5801 Bluff Road Hopkins, South Carolina 29061-9121 USA Stephen Subosits (Sep 3, 2025 12:37:37 EDT)

Stephen Subosits

WESTINGHOUSE NON-PROPRIETARY CLASS 3 LTR-RAC-25-41 September 3, 2025 2

Enclosures:

1) Affidavit, AW-25-059
2) Non-Proprietary slides for September 8, 2025, pre-application meeting on LEU+ ISA Summary
3) Proprietary slides for September 8, 2025, pre-application meeting on LEU+ ISA Summary cc:

NRC, Yawar Faraz NRC, Robert Mathis NRC, Diana Woodyatt NRC, Thomas Vukovinsky