Kelly Ferneau Executive VP and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106
SUBJECT:
DONALD C. COOK NUCLEAR PLANT - INFORMATION REQUEST FOR THE CYBER-SECURITY BASELINE INSPECTION, NOTIFICATION TO PERFORM INSPECTION
Dear Kelly Ferneau:
On December 1st, 2025, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline inspection in accordance with Inspection Procedure (IP) 71130.10 Cyber-Security, Revision 0 at your Donald C. Cook Nuclear Plant. The inspection will be performed to evaluate and verify that the Donald C. Cook Nuclear Power Stations digital computer and communication systems and networks associated with safety, security, or emergency preparedness (SSEP) functions are adequately protected against cyberattacks in accordance with Title 10 of the Code of Federal Regulations (10 CFR), Part 73, Section 54, Protection of Digital Computer and Communication Systems and Networks, and the U.S. Nuclear Regulatory Commission (NRC) approved cybersecurity plan (CSP). The onsite portion of the inspection will take place December 01 - 05, 2025.
Experience has shown that baseline inspections are extremely resource intensive, both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for documents needed for the inspection. These documents have been divided into four groups.
The first group specifies information necessary to assist the inspection team in choosing the focus areas (i.e., sample set) to be inspected by the cyber-security IP. This information should be made available electronically no later than September 26, 2025. The inspection team will review this information and, by October 17, 2025, will request the specific items that should be provided for review.
The second group of additional requested documents will assist the inspection team in the evaluation of the critical systems and critical digital assets (CSs/CDAs), defensive architecture, and the areas of the licensees CSP selected for the cyber-security inspection. This information will be requested for review in the regional office prior to the inspection by November 14, 2025, as identified above.
August 20, 2025
K. Ferneau 2
The third group of requested documents consists of those items that the inspection team will review, or need access to, during the inspection. Please have this information available by the first day of the onsite inspection, December 01, 2025.
The fourth group of information is necessary to aid the inspection team in tracking issues identified as a result of the inspection. It is requested that this information be provided to the lead inspector as the information is generated during the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.
The lead inspector for this inspection is Alan Dahbur. We understand that our regulatory contact for this inspection is Matthew Hohlek of your organization. If there are any questions about the inspection or the material requested, please contact the lead inspector at 630-829-9810 or via email at Alan.dahbur@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely, Alan Dahbur, Senior Reactor Inspector Engineering Branch 2 Division of Operating Reactor Safety Docket Nos. 05000315 and 05000316 License Nos. DPR-58 and DPR-74
Enclosure:
Donald C. Cook Nuclear Plant Cyber-Security Inspection Document Request cc w/encl: Distribution via LISTSERV Signed by Dahbur, Alan on 08/20/25
K. Ferneau 3
Letter to Kelly Ferneau from Alan Dahbur dated August 20,2025.
SUBJECT:
DONALD C. COOK NUCLEAR PLANT - INFORMATION REQUEST FOR THE CYBER-SECURITY BASELINE INSPECTION, NOTIFICATION TO PERFORM INSPECTION DISTRIBUTION:
Rodney Clagg RidsNrrDorlLpl3 RidsNrrPMDCCook Resource RidsNrrDroIrib Resource Jack Giessner Mohammed Shuaibi Diana Betancourt-Roldan John Pelchat Jared Heck Jennifer Dalzell R3-DORS ADAMS Accession Number: ML25232A182
SUNSI Review
Non-Sensitive
Sensitive
Publicly Available
Non-Publicly Available OFFICE R-III NAME ADahbur:anm DATE 08/20/2025 OFFICIAL RECORD COPY
Enclosure Inspection Report: 05000315/2025404 AND 05000316/2025404 Inspection Dates:
December 01- 05, 2025 Inspection Procedure:
IP 71130.10, Cyber-Security, Revision 0 NRC Inspectors:
Jorge Corujo-Sandin Alan Dahbur, Lead 630-829-9741 630-829-9810 Jorge.Corujo-Sandin@nrc.gov Alan.Dahbur@nrc.gov NRC Contractors:
Justin Bowden James Hartman Justin.Bowden@nrc.gov James.Hartman@nrc.gov I.
Information Requested for In-Office Preparation The initial request for information (i.e., first RFI) concentrates on providing the inspection team with the general information necessary to select appropriate components and CSP elements to develop a site-specific inspection plan. The first RFI is used to identify the list of critical systems and critical digital assets (CSs/CDAs) plus operational and management (O&M) security control portions of the CSP to be chosen as the sample set required to be inspected by the cyber-security IP. The first RFIs requested information is specified below in Table RFI #1. The Table RFI #1 information is requested to be provided to the regional office by September 26, 2025, or sooner, to facilitate the selection of the specific items that will be reviewed during the onsite inspection weeks.
The inspection team will examine the returned documentation from the first RFI and identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more focused follow-up request to develop the second RFI. The inspection team will submit the specific systems and equipment list to your staff by October 17, 2025, which will identify the specific systems and equipment that will be utilized to evaluate the CSs/CDAs, defensive architecture, and the areas of the licensees CSP selected for the cyber-security inspection. We request that the additional information provided from the second RFI be made available to the regional office prior to the inspection by November 14, 2025.
The required Table RFI 1 information shall be provided electronically to the lead inspector by September 26, 2025. If a compact disk (CD) is provided, please provide four copies (one for each inspector/contactor). The preferred file format for all lists is a searchable Excel spreadsheet file. These files should be indexed and hyper-linked to facilitate ease of use. If you have any questions regarding this information, please call the inspection team leader as soon as possible.
2 Table RFI #1 Request:
IP Ref 1
A list of all Identified Critical Systems and Critical Digital Assets, -
highlight/note any additions, deletions, reclassifications due to new guidance from white papers, changes to NEI 10-04, 13-10, etc.
since the last cyber security inspection.
Overall 2
Network Topology Diagrams to include information and data flow for critical systems in levels 2, 3 and 4 (If available)
Overall 3
Ongoing Monitoring and Assessment program documentation 03.01(a) 4 The most recent effectiveness analysis of the Cyber Security Program 03.01(b) 5 Vulnerability screening/assessment and scan program documentation 03.01(c) 6 Cyber Security Incident response documentation, including incident detection, response, and recovery documentation as well as contingency plan development, implementation and including any program documentation that requires testing of security boundary device functionality 03.02(a) and 03.04(b) 7 Password/Authenticator documentation 03.02(c) 8 Portable Media and Mobile Device control documentation, including kiosk security control assessment/documentation 03.02(e) 9 List of all design changes that affected CDAs that have been installed and completed since the last cyber security inspection, including either a summary of the design change or the 50.59 documentation of the change 03.03(a) 10 Supply Chain Management documentation including any security impact analysis for new acquisitions 03.03(a),
(b) and (c) 11 Configuration Management documentation including any security impact analysis performed due to configuration changes since the last inspection 03.03(a) and (b) 12 Cyber Security Plan and any 50.54(p) analysis to support changes to the plan since the last inspection 03.04(a) 13 Any cybersecurity event reports submitted in accordance with 10 CFR 73.77 since the last cybersecurity inspection and any copies of any recordable cybersecurity events since the last inspection 03.04(a)
3 Table RFI #1 Request:
IP Ref 14 Provide a list of all procedures and policies provided to the NRC with their descriptive name and associated number (if available)
Overall 15 Performance testing report (if applicable) 03.06 (a)
In addition to the above information please provide the following:
(1) Name(s) and phone numbers for the regulatory and technical contacts.
Based on this information, the inspection team will identify and select specific systems and equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and submit a list of specific systems and equipment to your staff by October 17, 2025, for the second RFI (i.e., RFI #2).
II.
Additional Information Requested to be Available Prior to Inspection.
As stated in Section I above, the inspection team will examine the returned documentation requested from Table RFI #1 and submit the list of specific systems and equipment to your staff by October 17, 2025, for the second RFI (i.e., RFI #2).
The second RFI will request additional information required to evaluate the CSs/CDAs, defensive architecture, and the areas of the licensees CSP selected for the cyber-security inspection. The additional information requested for the specific systems and equipment is identified in Table RFI #2.
The Table RFI 2 information shall be provided electronically to the lead inspector by November 14, 2025. If a compact disk (CD) is provided, please provide four copies (one for each inspector/contactor). The preferred file format for all lists is a searchable Excel spreadsheet file. These files should be indexed and hyper-linked to facilitate ease of use. If you have any questions regarding this information, please call the inspection team leader as soon as possible.
4 Table RFI #2 Request Items For the system(s) chosen for inspection provide:
1 Ongoing Monitoring and Assessment activity performed on the system(s) 03.01(a) 2 All Security Control Assessments for the selected system(s) 03.01(a) 3 All vulnerability screenings/assessments associated with, or scans performed on the selected system(s) since the last cyber security inspection.
All vulnerability screenings and assessments completed prior to putting new equipment into service as part of the select design changes 03.01(c) 4 Documentation (including configuration files and rules sets) for Network-based Intrusion Detection/Protection Systems (NIDS/NIPS),
Host-based Intrusion Detection Systems (HIDS), and Security Information and Event Management (SIEM) systems for system(s) chosen for inspection) 03.02(b) 5 Documentation (including configuration files and rule sets) for intra-security level firewalls and boundary devices used to protect the selected system(s) 03.02(c) 6 Copies of all periodic reviews of the access authorization list for the selected systems since the last inspection 03.02(d) 7 Baseline configuration data sheets for the selected CDAs 03.03(a) 8 Documentation on any changes, including Security Impact Analyses, performed on the selected system(s) since the last inspection 03.03(b) 9 Copies of the purchase order documentation for any new equipment purchased for the selected systems since the last inspection 03.03(c) 10 Copies of any cyber security drills performed since the last inspection, along with any reports or assessments generated.
03.02(a) 03.04(b) 11 Copy of the individual recovery plan(s) for the selected system(s) including documentation of the results the last time the backups were executed.
03.02(a) 03.04(b) 12 Corrective actions taken as a result of cyber security incidents/issues to include previous NRC violations and Licensee Identified Violations since the last cyber security inspection 03.04(d)
5 Table RFI #2 Request Items 13 The most recent Cybersecurity Quality Assurance audit and/or self-assessment and a list of Corrective Actions generated as a result III.
Information Requested to be Available on First Day of Inspection For the specific systems and equipment identified in Section II above, provide the following RFI (i.e., Table Week Onsite) electronically by December 01, 2025, the first day of the inspection.
Table Week Onsite Request:
Items 1
Copies of corrective actions written for issues identified since receipt of RFI #1.
03.04(d) 2 Updated Copies of corrective actions taken as a result of cyber security incidents/issues, to include previous NRC violations and Licensee Identified Violations since the last cyber security inspection, as well as vulnerability-related corrective actions 03.04(d)
In addition to the above information please provide the following:
(1) Copies of the following documents do not need to be solely available to the inspection team as long as the inspectors have easy and unrestrained access to them.
a.
Updated Final Safety Analysis Report, if not previously provided; b.
Original FSAR Volumes; c.
Original SER and Supplements; d.
FSAR Question and Answers; e.
Quality Assurance Plan; f.
Technical Specifications, if not previously provided; g.
Latest IPE/PRA Report; and (2) Vendor Manuals, Assessment and Corrective Actions:
a.
The most recent Cyber-Security Quality Assurance (QA) audit and/or self-assessment; and
6 b.
Corrective action documents (e.g., condition reports, including status of corrective actions) generate as a result of the most recent Cyber-Security QA audit and/or self-assessment.
IV.
Information Requested To Be Provided Throughout the Inspection (1) Copies of any corrective action documents generated as a result of the inspection teams questions or queries during the inspection.
(2) Copies of the list of questions submitted by the inspection team members and the status/resolution of the information requested (provided daily during the inspection to each inspection team member).
If you have any questions regarding the information requested, please contact the inspection team leader.