ML25219A023

From kanterella
Jump to navigation Jump to search
Nuclear Power Plant - Emergency Preparedness Biennial Exercise Inspection Report 05000333/2025501
ML25219A023
Person / Time
Site: FitzPatrick 
Issue date: 08/07/2025
From: Brice Bickett
Division of Operating Reactors
To: Rhoades D
Constellation Energy Generation, Constellation Nuclear
References
IR 2025501
Download: ML25219A023 (1)


Text

August 7, 2025 David P. Rhoades Senior Vice President Constellation Energy Generation, LLC President and Chief Nuclear Officer (CNO)

Constellation Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT - EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000333/2025501

Dear David Rhoades:

On July 17, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at James A. FitzPatrick Nuclear Power Plant and discussed the results of this inspection with Alex Sterio, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Brice A. Bickett, Chief Security, Emergency Preparedness and Incident Response Branch Division of Radiological Safety & Security Docket No. 05000333 License No. DPR-59

Enclosure:

As stated cc w/ encl: Distribution via LISTSERV BRICE BICKETT Digitally signed by BRICE BICKETT Date: 2025.08.07 08:46:50 -04'00'

ML25219A023 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRSS RI/DRSS NAME SMercurio BBickett DATE 8/6/2025 8/7/2025

Enclosure U.S. NUCLEAR REGULATORY COMMISSION Inspection Report Docket Number:

05000333 License Number:

DPR-59 Report Number:

05000333/2025501 Enterprise Identifier: I-2025-501-0010 Licensee:

Constellation Nuclear Facility:

James A. FitzPatrick Nuclear Power Plant Location:

Oswego, NY Inspection Dates:

Inspectors:

Approved By:

July 14, 2025 to July 17, 2025 C. Crisden, Emergency Response Coordinator B. Dyke, Operations Engineer K. Hussar, Senior Physical Security Inspector S. Mercurio, Senior Emergency Preparedness Inspector E. Miller, Senior Resident Inspector Brice A. Bickett, Chief Security, Emergency Preparedness and Incident Response Branch Division of Radiological Safety & Security

2

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an emergency preparedness biennial exercise inspection at James A. FitzPatrick Nuclear Power Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations No findings or violations of more than minor significance were identified.

Additional Tracking Items None.

3 INSPECTION SCOPES Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY 71114.01 - Exercise Evaluation Inspection Review (IP Section 02.01-02.11) (1 Sample)

(1)

The inspectors evaluated the biennial emergency plan exercise. The exercise scenario simulated a loss of offsite power and a seismic event resulting in a primary containment leak with rising radiation levels that constitutes a rapidly progressing severe accident on July 15, 2025.

71114.04 - Emergency Action Level and Emergency Plan Changes Inspection Review (IP Section 02.01-02.03) (1 Sample)

(1)

The inspectors evaluated the following submitted Emergency Action Level and Emergency Plan changes:

24-49, EP-AA-1000, Standardized Radiological Emergency Plan, Revision 34 24-52, EP-MA-121-1002, Alert and Notification System (ANS) Program, Revision 16 25-13, EP-AA-110-200-F-06/F-21, Nine Mile Point Flow Rate Calculation, Revision B/Nine Mile Point Meteorological Data Acquisition, Revision E 25-22, EP-AA-122-100, Drill and Exercise Planning and Scheduling, Revision 14 This evaluation does not constitute NRC approval.

71114.08 - Exercise Evaluation - Scenario Review Inspection Review (IP Section 02.01 - 02.04) (1 Sample)

(1)

The inspectors reviewed and evaluated the proposed scenario for the biennial emergency plan exercise on June 11, 2025.

4 OTHER ACTIVITIES - BASELINE 71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

EP01: Drill/Exercise Performance (DEP) Sample (IP Section 02.12) (1 Sample)

(1)

July 1, 2024 through June 30, 2025 EP02: Emergency Response Organization (ERO) Drill Participation (IP Section 02.13)

(1 Sample)

(1)

July 1, 2024 through June 30, 2025 EP04: Emergency Response Facility and Equipment Readiness (ERFER) (IP Section 02.14)

(1 Sample)

This is a new NRC performance indicator, introduced in Nuclear Energy Institute 99-02, Revision 8 (Agencywide Documents Access and Management System (ADAMS)

ML24331A114). Licensees began collecting data for this performance indicator on January 1, 2025.

(1)

January 1, 2025 through June 30, 2025 INSPECTION RESULTS No findings were identified.

EXIT MEETINGS AND DEBRIEFS The inspectors verified no proprietary information was retained or documented in this report.

On July 17, 2025, the inspectors presented the emergency preparedness biennial exercise inspection results to Alex Sterio, Site Vice President, and other members of the licensee staff.

5 DOCUMENTS REVIEWED Inspection Procedure Type Designation Description or Title Revision or Date 71114.01 Corrective Action Documents Resulting from Inspection 04888146 Miscellaneous James A. FitzPatrick Nuclear Power Plant 2025 Emergency Preparedness Biennial Exercise Scenario 05/14/2025 EP-AA-1000 Constellation Standardized Radiological Emergency Plan Revision 34 EP-AA-1014 Constellation Radiological Emergency Plan Annex for James A. Fitzpatrick Station Revision 5 71114.04 Corrective Action Documents Resulting from Inspection 04882977 07/17/2025