NextEra Slides for 8-7-25 Duane Arnold Proposed Restart Environmental Pre-Submittal Meeting
ML25219A021
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 08/07/2025
From:
NextEra Energy Duane Arnold
To:
Office of Nuclear Material Safety and Safeguards
References
Download: ML25219A021 (1)


Text

Duane Arnold Energy Center Environmental Presentation Aug. 7, 2025

2 Opening Remarks / Project Team NextEra Energy Duane Arnold, LLC NextEra Energy Duane Arnold Mike Davis Licensing Project Manager Kaitlyn Watkins Principal Environmental Specialist Mike Casey Environmental Radiation Protection Manager ENERCON Jennifer Meek Environmental Licensing Lead Stacy Burgess Senior Manager, Environmental Licensing Rachel Turney-Work Director, Environmental Licensing

3 Agenda NextEra Energy Duane Arnold, LLC Meeting purpose/goal 1

Licensing history 2

Current plant status 3

Planned restart activities 4

Station aerial 5

Vicinity map 6

Current status of site major environmental permits and operations 7

Current operations and path forward 8

4 Meeting Purpose and Goal 1

NextEra Energy Duane Arnold, LLC

Purpose:

Provide overview of site Discuss path forward for NRC National Environmental Policy Act (NEPA) review Discuss the timeline for restart Goal:

Gain understanding and NRC feedback on process for NRCs NEPA review

5 Licensing History 2

NextEra Energy Duane Arnold, LLC Duane Arnold commenced commercial operation in 1974 One BWR with thermal output of 1,912 MWt, output of 610 MWe Site is approximately 500 acres License renewal granted in December 2010, with the current operating license expiring in 2034 Ceased operations in 2020. Currently, idled and in decommissioning status On January 23, NextEra Energy Duane Arnold, LLC submitted the following documents Duane Arnold restart overview and regulatory path to reauthorization of power operations Request for exemption from 10 CFR 50.82(a)(2), officially notifying NRC of NextEra Energy Duane Arnold, LLCs intention to submit a series of licensing applications to support open communications and agency resource planning

6 Current Plant Status 3

NextEra Energy Duane Arnold, LLC All spent fuel transferred to Independent Spent Fuel Storage Installation (ISFSI)

Spent fuel pool is filled without fuel Major systems status:

Most major plant systems drained and deenergized Training and administrative buildings removed Mechanical draft cooling towers removed Generator output transformer and in-scope transmission lines removed The main power block buildings remain intact

7 Planned Restart Activities 4

NextEra Energy Duane Arnold, LLC Plant to be restored to previous operating license condition at 2020 shutdown Planned plant modifications:

New cooling towers Restoration of in-scope transmission lines New office and warehouse buildings Sewage treatment system upgrade Dredging of intake Permit applications to support restart activities and resumption of power operations

8 Station Aerial NextEra Energy Duane Arnold is owned and operated by NextEra Energy Duane Arnold, LLC Duane Arnold Energy Center is located in Linn County, Iowa, and encompasses approximately 500 acres along the west bank of the Cedar River Pleasant Creek Solar now occupies approximately 40 acres of the Duane Arnold site 5

Proposed Protected Area Fence

9 Vicinity (6-Mile Radius) Map 6

NextEra Energy Duane Arnold, LLC

10 Current Status of the Site Major Environmental Permits and Operations 7

NextEra Energy Duane Arnold, LLC National Pollutant Discharge Elimination System (NPDES) Wastewater Permit Water Use Permit Linn County Minor Air Operating Permits Hazardous Waste Generator Radioactive Material License

11 Current Operations 8

NextEra Energy Duane Arnold, LLC Environmentally related equipment in operation:

Storm drain system discharges to a retention pond Well water for cooling and as a domestic water source Radwaste and control buildings HVAC systems remain energized Fire protection systems

12 Path Forward 9

NextEra Energy Duane Arnold, LLC Under NEPA, it is anticipated that NRC will prepare an Environmental Assessment (EA) for this restart NextEra Energy Duane Arnold, LLC will:

Coordinate with the NRC Environmental Project Manager regarding the need for an environmental review document and the subject areas that would be useful to address Submit an environmental review document (tentatively in October 2025) that focuses on restart activities useful for the NRCs NEPA review Support both virtual and on-site audits for the EA preparation Work with NRC to determine final steps

- Anticipated that a final EA and Finding of No Significant Impact (FONSI) will be issued within 12 months of acceptance of an environmental submittal

13 Discussion/Questions NextEra Energy Duane Arnold, LLC