ML25218A182

From kanterella
Jump to navigation Jump to search
Announcement Letter for the Quality Assurance Implementation Inspection of Uso Sfr Owner, LLC
ML25218A182
Person / Time
Site: 99902150
Issue date: 08/14/2025
From: Kerri Kavanagh
NRC/NRR/DRO/IQVB
To: George Wilson
USO SFR Owner
References
Download: ML25218A182 (1)


Text

Mr. George Wilson Senior Vice President, Regulatory Affairs USO SFR Owner, LLC 15800 Northup Way Bellevue, WA 98008

SUBJECT:

QUALITY ASSURANCE IMPLEMENTATION INSPECTION OF USO SFR OWNER, LLC

Dear Mr. Wilson:

This letter documents the U.S. Nuclear Regulatory Commission (NRC) staffs plan to perform a Quality Assurance implementation inspection of USO SFR Owner, LLC (USO), a wholly owned subsidiary of TerraPower, LLC (TerraPower), as it pertains to design and testing activities conducted for the Natrium Reactor Plant, Kemmerer Power Station Unit 1 application. As discussed via phone conversation on Wednesday, August 13, 2025, the NRC inspection team plans to arrive at your facility on Monday, March 23, 2026, and will conduct an inspection through Friday, March 27, 2026. After the inspection, a report will be issued and transmitted to you via letter.

The lead inspector for this effort is Mr. Yamir Diaz-Castillo; you may contact him at (301) 415-2228 or via electronic mail at Yamir.Diaz-Castillo@nrc.gov.

The following docket number has been assigned to your facility: 99902150. Please refer to this number on any correspondence sent to the NRC.

Sincerely, Kerri Kavanagh, Chief Quality Assurance and Vendor Inspection Branch Division of Reactor Oversight Office of Nuclear Reactor Regulation Docket No.: 99902150 August 14, 2025 Signed by Kavanagh, Kerri on 08/14/25

ML25218A182 NRR-106 OFFICE NRR/DRO/IQVB NRR/DRO/IQVB NAME TLee KKavanagh DATE 8/6/2025 8/14/2025