ML25203A083

From kanterella
Jump to navigation Jump to search
Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000280/2025404 and 05000281/2025404
ML25203A083
Person / Time
Site: Surry  Dominion icon.png
Issue date: 07/24/2025
From: Jannette Worosilo
NRC/RGN-II/DFRSS
To: Carr E
Dominion Energy
References
IR 2025404
Download: ML25203A083 (4)


See also: IR 05000280/2025404

Text

Eric S. Carr, President

Nuclear Operations and Chief Nuclear Officer

Innsbrook Technical Center

5000 Dominion Boulevard

Glen Allen, VA 23060-6711

SUBJECT:

SURRY POWER STATION UNITS 1 & 2 - NOTIFICATION OF TARGET SET

INSPECTION AND REQUEST FOR INFORMATION (NRC INSPECTION

REPORT NO. 05000280/2025404 AND 05000281/2025404)

Dear Eric Carr:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region II (RII) staff will conduct an inspection of the Target Sets specified by the conditions of

your operating license at the Surry Power Station Units 1 & 2 on October 21 - 23, 2025. The

inspection team will be led by Mr. William Monk, Sr. Reactor Inspector, and Mr. Roland Womack,

Sr. Physical Security Inspector both from the NRC RII office.

The inspection will be conducted in accordance with Inspection Procedure 71130.14, Review of

Power Reactor Target Sets, and effective as of March 9, 2023.

On July 21, 2025, during communications between Mr. Johnny Baker of your staff, and Mr. Monk,

NRC RII, our respective staff, confirmed arrangements for a three-day onsite inspection. The

schedule is as follows:

Onsite preparation / SGI review: October 21, 2025

Onsite inspection: October 22 - 23, 2025

Mr. Monk and Mr. Womack (Observing Inspector) will be onsite for three days during the week

and will arrive the morning of Tuesday, October 21, 2025. The first day will be preparation time

to review safeguard information (SGI) material onsite. The following day the team will conduct an

entrance meeting at the sites request in the morning and an exit meeting the following Thursday

afternoon, unless there is an emergent issue which would either delay the exit or be cause for it

to take place over the phone/video conference call. Due to the security related nature of the

inspection, we request a conference room that is SGI accessible.

In order to complete the inspection in the time allotted, the inspectors need to review your non-

SGI target sets program references and other pertinent documents prior to the inspection.

Please provide the non-SGI documents listed below via email or CERTREC upload by October

3, 2025.

Mr. Monk and Mr. Womack plan to only review SGI material onsite in your secure spaces and

return materials to your staff at the end of each day.

July 24, 2025

E. Carr

2

The types of documents the team will be reviewing during the conduct of the inspection are listed

below. Please contact Mr. Monk at (404) 997-4579 prior to preparing copies and

sending/uploading the files if there are any questions. The inspection team will try to minimize

your administrative burden by specifically identifying those documents required for inspection

preparation.

Provide the following Target Set Program documents:

All non-SGI procedures that relate to the Target Set identification, maintenance, and

development

Site Target Sets (ready for review once onsite)

List of the Target Set Expert Panel members (names, qualifications, and positions)

Response to security event operations procedure

Any procedure listed as a credited operator manual action (OMA) in the target sets

Results of the last two target set expert panel reviews (i.e., TSAT meeting minutes)

Condition Reports associated with the Target Set program and the Safety/Security

interface since the last triennial inspection (last 3 years)

Any design change packages or modification packages that affected Target Sets

A summary or list of any changes that have occurred to the Target Sets since the last

inspection

A copy of the sites Safety / Security Interface procedure

Items needed during the Target Inspection Week:

Access to all Non-SGI and SGI procedures related to Target Sets

Site Target Sets, Protective Strategy, Contingency Plan (ONSITE REVIEW)

A point of contact knowledgeable in Target Sets and the protective defensive strategy

We will require a meeting with Target Set knowledgeable personnel (including

operations) to discuss target set content

We will keep the requested information only as long as it is necessary to complete the

inspection activity. Additionally, if you feel that any requested documents would contain

proprietary or company sensitive information, please make sure they are appropriately marked

and attached to an appropriate affidavit for withholding in accordance with 10 CFR 2.390.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number 3150 -

0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding, of

the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically

for public inspection in the NRCs Public Document Room or from the Publicly Available Records

(PARS) component of the NRC's Agencywide Documents Access and Management System

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

E. Carr

3

Your cooperation and support during this inspection will be most appreciated. If you have

questions concerning this inspection, or the inspection team's information or logistical needs,

please contact William. Monk, the team leader, in the Region II Office at (404) 997-4579.

Sincerely,

Jannette Worosilo Chief

Nuclear Security Branch

Division of Fuels, Radiological Safety, and Security

Docket Nos.: 50-280; 50-281

License Nos.: DPR-32; DPR-37

cc: Distribution via ListServ

Signed by Worosilo, Jannette

on 07/24/25

ML25202A083

X SUNSI Review

X Non-Sensitive

Sensitive

X Publicly Available

Non-Publicly Available

OFFICE RII/DFRSS

RII/DORS

NAME

W. Monk

J. Worosilo

DATE

07/22/25

07/24/25