Eric S. Carr, President Nuclear Operations and Chief Nuclear Officer Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
SURRY POWER STATION UNITS 1 & 2 - NOTIFICATION OF TARGET SET INSPECTION AND REQUEST FOR INFORMATION (NRC INSPECTION REPORT NO. 05000280/2025404 AND 05000281/2025404)
Dear Eric Carr:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
Region II (RII) staff will conduct an inspection of the Target Sets specified by the conditions of your operating license at the Surry Power Station Units 1 & 2 on October 21 - 23, 2025. The inspection team will be led by Mr. William Monk, Sr. Reactor Inspector, and Mr. Roland Womack, Sr. Physical Security Inspector both from the NRC RII office.
The inspection will be conducted in accordance with Inspection Procedure 71130.14, Review of Power Reactor Target Sets, and effective as of March 9, 2023.
On July 21, 2025, during communications between Mr. Johnny Baker of your staff, and Mr. Monk, NRC RII, our respective staff, confirmed arrangements for a three-day onsite inspection. The schedule is as follows:
Onsite preparation / SGI review: October 21, 2025 Onsite inspection: October 22 - 23, 2025 Mr. Monk and Mr. Womack (Observing Inspector) will be onsite for three days during the week and will arrive the morning of Tuesday, October 21, 2025. The first day will be preparation time to review safeguard information (SGI) material onsite. The following day the team will conduct an entrance meeting at the sites request in the morning and an exit meeting the following Thursday afternoon, unless there is an emergent issue which would either delay the exit or be cause for it to take place over the phone/video conference call. Due to the security related nature of the inspection, we request a conference room that is SGI accessible.
In order to complete the inspection in the time allotted, the inspectors need to review your non-SGI target sets program references and other pertinent documents prior to the inspection.
Please provide the non-SGI documents listed below via email or CERTREC upload by October 3, 2025.
Mr. Monk and Mr. Womack plan to only review SGI material onsite in your secure spaces and return materials to your staff at the end of each day.
July 24, 2025
E. Carr 2
The types of documents the team will be reviewing during the conduct of the inspection are listed below. Please contact Mr. Monk at (404) 997-4579 prior to preparing copies and sending/uploading the files if there are any questions. The inspection team will try to minimize your administrative burden by specifically identifying those documents required for inspection preparation.
Provide the following Target Set Program documents:
All non-SGI procedures that relate to the Target Set identification, maintenance, and development Site Target Sets (ready for review once onsite)
List of the Target Set Expert Panel members (names, qualifications, and positions)
Response to security event operations procedure Any procedure listed as a credited operator manual action (OMA) in the target sets Results of the last two target set expert panel reviews (i.e., TSAT meeting minutes)
Condition Reports associated with the Target Set program and the Safety/Security interface since the last triennial inspection (last 3 years)
Any design change packages or modification packages that affected Target Sets A summary or list of any changes that have occurred to the Target Sets since the last inspection A copy of the sites Safety / Security Interface procedure Items needed during the Target Inspection Week:
Access to all Non-SGI and SGI procedures related to Target Sets Site Target Sets, Protective Strategy, Contingency Plan (ONSITE REVIEW)
A point of contact knowledgeable in Target Sets and the protective defensive strategy We will require a meeting with Target Set knowledgeable personnel (including operations) to discuss target set content We will keep the requested information only as long as it is necessary to complete the inspection activity. Additionally, if you feel that any requested documents would contain proprietary or company sensitive information, please make sure they are appropriately marked and attached to an appropriate affidavit for withholding in accordance with 10 CFR 2.390.
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150 -
0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
E. Carr 3
Your cooperation and support during this inspection will be most appreciated. If you have questions concerning this inspection, or the inspection team's information or logistical needs, please contact William. Monk, the team leader, in the Region II Office at (404) 997-4579.
Sincerely, Jannette Worosilo Chief Nuclear Security Branch Division of Fuels, Radiological Safety, and Security Docket Nos.: 50-280; 50-281 License Nos.: DPR-32; DPR-37 cc: Distribution via ListServ Signed by Worosilo, Jannette on 07/24/25
ML25202A083 X SUNSI Review X Non-Sensitive Sensitive X Publicly Available Non-Publicly Available OFFICE RII/DFRSS RII/DORS NAME W. Monk J. Worosilo DATE 07/22/25 07/24/25