UNITED STATES NUCLEAR REGULATORY COMMISSION ADVISORY COMMITTEE ON REACTOR SAFEGUARDS WASHINGTON, D. C. 20555 Honorable Marcus A. Rowden Chairman August 19, 1976

u. s. Nuclear Regulatory Connnission Washington, DC 20555

SUBJECT:

REPORT ON THE SHIPPING!?ORI' A'IOMIC PCMER STATION LIGHT WATER BREEDER REACIOR

Dear Mr. Rmden:

At its 196th meeting, August 12-14, 1976, the Advisory Committee on Reactor Safeguards reviewed the Energy Research and Developnent Administration (ERDA) proposal to install a light water breeder reactor (LWBR) core, and to make numerous modifications, in the Shippingport Atomic Power Station. It is proposed to operate the LWBR core for about three years. A Subcorrnnittee meeting and site visit was held on July 21, 1976. The Committee had the benefit of discussions with representatives of the westinghouse Electric Corporation (Bettis), the Division of Naval Reactors of ERDA, Duquesne Light Company, the Nuclear Regulatory Commission (NRC) Staff, and of the documents listed. The COII1Rittee reported previously on the Shippingport Atanic Power Station at its 2nd meeting, November 1-3, 1957, its 30th meeting, December 7, 1960, and its 60th meeting, December 10-12, 1964.

The proposed lliBR oxide fuel core consists of thorium-232 and uranium---233 and is designed to have a net conversion ratio slightly greater than 1.0, canpared to the conventional pressurized water reactor with a conversion ratio less than 1.0. The LWBR core will operate at less than one-half the power density of the preceding core.

The Committee recognizes that the Shippingport Atomic Power Station is the oldest operating commercial reactor. It was designed and built in accordance with the stringent requirements imposed by the Naval Reactors Program at a time prior to the issuance of 10 CFR Part 50. The Committee also recognizes that it is not possible to demonstrate strict compliance with all current safety criteria being applied to new plant construction.

Substantial modifications have been made to the Shippingport Atomic Power Station emergency core cooling system, and safety-related improvements have been made in many other portions of the plant.

The ACRS concurs with the NRC Staff recommendations regarding installation of diverse trip signals for initiation of safety injection, and the instal-lation of a chlorine monitor in the control room.

1545

Honorable Marcus A. Row::len 2 -

August 19, 1976 With regard to lockout of the pressurizer surge line isolation valve, which is being re-examined by the NRC Staff and will be discussed in a supplemental Staff report, the ACRS position regarding valve lockout has been cited pre-viously (e.g., ACRS Re:i;x,rt on Trojan Nuclear Station, dated November 20, 1974, and Item IIC-1 of ACRS Report No. 4 on Status of Generic Items Relating to Light~vater Reactors, dated April 16, 1976).

The Connnittee believes it to be acceptable for the Shippingport Atomic Power Station to operate with the Light Water Breeder Reactor core as proposed.

Additional Remarks by Mr. H. S. Isbin Sincerely yours,

~v,~

Dade w. Moeller Chairman In the review of this project the Committee was informed that a Division of Naval Reactors' representative monitors the operations of the reactor.

The concept of a federal monitor on a watch standing basis with the author-ity to shut the reactor down appears to me to be a carryover of the initial operating procedures of the Shippingport Atomic Power Station of some twenty years ago.

In my opinion, a federal monitor would not enhance safety within the present system of licensing commercial nuclear power reactors. 'Ihe evo-lution of the independent federal agency, the Nuclear Regulatory Commission, with its full. comple-nent of technical and experienced personnel to set Tech-nical Specifications for operations, to carry out inspections and enforce-ments, and to require rigid qualifications for the licensee's operators, now constitutes the authority for thorough and effective monitoring of nuclear power operations.

References:

1. Nuclear Regulatory Commission (NRC) Staff's Safety Evaluation Report for the Light Water Breeder Reactor (LWBR), dated July 1976.
2. Shippingport Atomic Power Station Safety Analysis Report for the LWBR, Volumes l through 10.