ML25196A360

From kanterella
Jump to navigation Jump to search
03-12-76 Recirculation Pump Trip to Help Limit the Consequences of an ATWS Event in BWRs
ML25196A360
Person / Time
Issue date: 03/12/1976
From: Moeller D
Advisory Committee on Reactor Safeguards
To: Gossick L
NRC/EDO
References
Download: ML25196A360 (1)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION ADVISORY COMMITTEE ON REACTOR SAFEGUARDS WASHINGTON, D. C. 20555 March 12, 1976 Lee V. Gossick Executive Director for Operations

Subject:

RECIRCULATION PUMP TRIP TO HELP LIMIT THE CONSEQUENCES OF AN ATWS EVENT IN BWRs It has recently come to the attention of the ACRS that not all operating boiling water reactors have installed a recirculation pump trip to help limit the consequences of an ATWS event.

Such a trip was proposed by applicants for construction permits in 1971 and for operating licenses in 1972.

The Committee believes that the recirculation pump trip represents a substantial improvement in protection for BWRs and should be imple-mented promptly on all operating BWRs unless analyses have shown that such a trip is not required to mitigate the consequences of ATWS.

Please provide the Committee with a list of those reactors in operation, or nearing operation, which do not have such a trip and a schedule for installation of this trip on a timely basis.

1906 Sincerely, Isl Dade W. Moeller Dade W. Moeller Chairman