David Rhoades
Senior Vice President
Constellation Energy Generation, LLC
President and Chief Nuclear Officer (CNO)
Constellation Nuclear
4300 Winfield Road
Warrenville, IL 60555
SUBJECT:
INFORMATION REQUEST TO SUPPORT UPCOMING PROBLEM
IDENTIFICATION AND RESOLUTION INSPECTION AT BYRON STATION
Dear David Rhoades:
This letter is to request information to support our scheduled Problem Identification and
Resolution (PI&R) inspection beginning September 15, 2025, at Byron Station. This inspection
will be performed in accordance with the NRC baseline Inspection Procedure 71152, Problem
Identification and Resolution.
Experience has shown that these inspections are extremely resource intensive both for the
NRC inspectors and the utility staff. In order to minimize the impact that the inspection has on
the site and to ensure a productive inspection, we have enclosed a list of documents required
for the inspection.
The documents requested are copies of condition reports and lists of information necessary
to ensure the inspection team is adequately prepared for the inspection. The information
requested prior to the inspection may be provided in either CD-ROM/DVD or other online
access and should be ready for NRC review by August 25, 2025. If there are any questions
about the material requested or the inspection in general, please contact me at 630-829-9884
or Thomas.Hartman@nrc.gov.
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget,
Control Number 3150-0011.
July 15, 2025
D. Rhoades
2
The NRC may not conduct or sponsor, and a person is not required to respond to a request for
information or an information collection requirement unless the requesting document displays
a currently valid Office of Management and Budget control number.
In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390 of the NRCs
Public Inspections, Exemptions, Requests for Withholding, of the NRCs Rules of Practice,
a copy of this letter, its enclosure, and your response (if any) will be available electronically for
public inspection in the NRCs Public Document Room or from the Publicly Available Records
(PARS) component of the NRC's Agencywide Documents Access and Management System
(ADAMS). ADAMS is accessible from the NRC website at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
Thomas Hartman
Senior Resident Inspector
Reactor Projects Branch 3
Division of Operating Reactor Safety
Docket Nos. 05000454 and 05000455
License Nos. NPF-37 and NPF-66
Enclosure:
Requested Information to Support
PI&R Inspection
cc: Distribution via LISTSERV
Signed by Hartman, Thomas
on 07/15/25
D. Rhoades
3
Letter to David Rhodes from Thomas Hartman dated July 15, 2025.
SUBJECT:
INFORMATION REQUEST TO SUPPORT UPCOMING PROBLEM
IDENTIFICATION AND RESOLUTION INSPECTION AT BYRON STATION
DISTRIBUTION:
Tim Steadham
RidsNrrDorlLpl3
RidsNrrPMByron Resource
RidsNrrDroIrib Resource
R3-DORS
ADAMS Accession Number: ML25196A058
Publicly Available
Non-Publicly Available
Sensitive
Non-Sensitive
OFFICE
RIII
NAME
THartman:anm
DATE
07/15/2025
OFFICIAL RECORD COPY
Enclosure
REQUESTED INFORMATION TO SUPPORT
PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION
INSPECTION REPORT 05000454/2025012 AND 05000455/2025012
Please provide the information on a compact disc (one for each of the four team members),
or other online access venue. Unless otherwise specified, the time frame for requested
information is for the period of August 1, 2023, through the time the data request is answered.
Please label any electronic files with file content information. In the case of any list of condition
reports requested, the list should be in Excel sortable format.
In addition, inspectors will require computer access to the corrective action program (CAP)
database while on site.
(a) PROGRAM DOCUMENTS
1.
Copies of current administrative procedures associated with: (1) corrective action
process (including procedures on how to perform root and apparent cause evaluations);
(2) operating experience program; (3) self-assessment program (including quality
assurance audit program); (4) maintenance rule program; (5) operability determination
process; (6) system health process or equivalent equipment reliability improvement
programs; (7) work control and work scheduling process; (8) operational decision
making (ODMI) process and (9) aging management program.
2.
A current copy of the Employee Concerns Program/Ombudsman administrative
procedure(s).
3.
Description of any substantive changes made to the CAP since the last Problem
Identification and Resolution (PI&R) Inspection (September 2023). Please include
the effective date with each listed change.
(b) ASSESSMENTS
4.
A copy of Quality Assurance (QA) audits of the CAP.
5.
A copy of self-assessments and associated condition reports generated in preparation
for this PI&R inspection.
6.
A list of all other QA audits completed.
7.
The schedule of future QA audits (2 years).
8.
A copy of completed CAP self-assessments and the plan/schedule for future
CAP self-assessments (2 years).
9.
A chronological list of department and site self-assessments completed
(include date completed and a brief description of the assessment).
10. A list of condition reports (CRs) written for findings or concerns identified in
self-assessments and audits. Include a brief description/title of the finding,
its status, and include a cross-reference to the audit or self-assessment number.
2
(c) CORRECTIVE ACTION DOCUMENTS
11. A copy of completed root cause evaluations generated since August 1, 2023. Provide
status of any remaining actions developed as part of the evaluations. Include a brief
description/title, the date completed, significance/priority level, assigned organization,
and system affected. Also include a reference, if not part of the root cause package,
to the documents and/or CRs directing and tracking the actions.
12. A list of completed apparent cause evaluations generated since August 1, 2023. Provide
status of any remaining actions developed as part of the evaluations. Include a brief
description/title, the date completed, significance/priority level, assigned organization, and
system affected. Also include a reference, if not part of the apparent cause package,
to the documents and/or CRs directing and tracking the actions.
13. A list of completed common cause evaluations generated since August 1, 2023. Provide
status of any remaining actions developed as part of the evaluations. Include a brief
description/title, the date completed, significance/priority level, assigned organization,
and system affected. Also include a reference, if not part of the common cause package,
to the documents and/or CRs directing and tracking the actions.
14. A list of all open CRs at the time the data request is answered. Include CR number,
a brief description/title, the date initiated, system affected if any, significance level,
and anticipated completion date, if available.
15. A list of CRs that were closed since August 1, 2023. Include CR number, a brief
description/title, the date initiated and closed, significance/priority level, assigned
organization, system affected and whether there was an associated operability
evaluation. This list should include all CRs that were opened any time before the
data request is answered.
16. A list of open corrective actions at the time the data request is answered. Include CR
number, a brief description/title, significance/priority level, initiating date and due date.
The list should include the number of due date extensions and the department
responsible.
17. A list of CRs generated by the corporate office that involve or affect plant operation.
Include the date initiated, a brief description/title, site(s) affected, system affected,
significance/priority level, assigned organization, and status (if closed, include date
closed; if open, include scheduled date to be closed).
18. A list of completed effectiveness reviews with a brief description of the results.
Include a cross-reference to the CRs for which the effectiveness review was conducted
and, if applicable, CR numbers documenting any additional follow-up actions.
19. A list of CRs initiated for inadequate or ineffective corrective actions. Include the date
initiated, a brief description/title, significance/priority level, system affected, assigned
organization, and status (if closed, include date closed; if open, include scheduled date
to be closed). Include a cross-reference to the CR or evaluation that generated the
original corrective action.
3
20. A copy of any performance reports or indicators used to track CAP effectiveness.
The end-of-quarter data will suffice; monthly reports are not required.
21. A data table (or similar format) showing the total number of CRs generated per year
from 2020 sortable by department (i.e., operations, engineering, security etc.).
22. A data table showing the number of issues identified externally (NRC, INPO, other etc.)
per year as compared to internally since 2020.
(d) TRENDS
23. A list of CRs initiated for trends. Include the date initiated, a brief description/title,
significance/priority level, and status (if closed, include date closed; if open, include
scheduled date to be closed).
24. Copies of any completed trend reports for CRs. Quarterly trend reports are acceptable;
copies of all monthly reports are not required.
25. Copies of all apparent, common and/or root cause evaluations regarding adverse human
performance trends.
(e) OPERATING EXPERIENCE
26. A copy of the most recent operating experience program effectiveness review.
27. A list of CRs initiated to evaluate industry and NRC operating experience, and NRC
generic communications (e.g., bulletins, information notices, generic letters, etc.).
Include date the CR was initiated, a brief description/title, and the status (if closed,
include date closed; if open, include scheduled date to be closed).
(f) SYSTEMS AND COMPONENTS
28. A list of the top ten risk significant systems and top ten risk significant components.
29. A list of operability determinations/evaluations that were active during the period
of August 1, 2023, through the time the data request is answered. Include a brief
description/title, date initiated, date closed, or date scheduled to be closed.
30. Cause analysis, corrective actions documents, health reports, and trend analysis for
systems and components considered Maintenance Rule (a)(1). Provide this information
starting one year earlier from when the system or component entered (a)(1) status.
Include dates when system/components entered (a)(1) status and, if applicable, returned
to (a)(2) status. For recurring reports, quarterly reports are sufficient; monthly reports are
not required.
31. A list of temporary modifications that were active from August 1, 2023, through the time
the data request is answered. Include a brief description/title, installation date, and
current status.
4
(g) SCWE
32. Results of completed safety culture/safety conscious work environment surveys or
self-assessments since August 1, 2023. Include reference to associated CRs and status
of the CRs actions. Also include schedule/plans for future surveys.
(h) REGULATORY ISSUES
33. A copy of CRs for issues (findings, violations, etc.) documented in NRC inspection
reports. Include the CR number, brief description/title, date initiated and the status
(if closed, include date closed; if open, include scheduled date to be closed).
34. A list of CRs for licensee-identified violations that have been documented in NRC
inspection reports. Include the CR number, brief description/title, date initiated and the
status (if closed, include date closed; if open, include scheduled date to be closed).
35. A list of CRs associated with NRC identified issues. These issues are those not
documented in NRC inspection reports. Include the CR number, brief description/title,
date initiated and the status (if closed, include date closed; if open, include scheduled
date to be closed).
36. A list of current control room deficiencies and operator work-arounds, sortable by
priority, with a brief description/title and corresponding CR and/or work order number.
(i) 5-YEAR REVIEW
37. A list of CRs and work orders (WOs) regarding the Emergency Diesel Generator Starting
Air system that have been generated since August 1, 2020. Include the CR number,
brief description/title, level of evaluation (i.e., root cause, apparent cause, common
cause etc.), date initiated, and the status (if closed, include date closed; if open,
include scheduled date to be closed).
(j) ADMIN
38. A copy of the latest plant organizational chart and phone listing.
39. Scheduled dates, times, and location for all meetings associated with implementing the
CAP (e.g., CR screening meetings, corrective action review board meetings, OPEX
review, etc.). Include work order screening/assessment meetings if considered part of
the CAP process.
5
(k) Documents Requested to Be Available During the Inspection:
a.
Updated Safety Analysis Report;
b.
Technical Specifications and Technical Requirements Manual;
c.
Procedure index;
d.
A copy of the QA manual;
e.
A list of issues brought to the ECP/ombudsman and the actions taken for resolution;
f.
A list of the codes used in the CAP; and
g.
A copy of the latest independent/offsite organization review of safety culture/safety
conscious work environment and internal equivalent assessments if not provided as part
of the requested data package.
Other:
On the first day of the inspection, or early on the second day, please provide the inspection
team a briefing of your CAP. Include your expectations for personnel using the program and
how the work order system fits into the overall scheme for addressing identified issues. Also
please demonstrate how to use a computer to access CAP data.