ML25189A264

From kanterella
Jump to navigation Jump to search
Notification of Inspection NRC Inspection Report 05000416/2025003 and Request for Information
ML25189A264
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 07/08/2025
From: Harrington C
NRC/RGN-IV/DORS/OB
To: Kapellas B
Entergy Operations
References
IR 2025003
Download: ML25189A264 (1)


See also: IR 05000416/2025003

Text

July 08, 2025

Brad Kapellas, Site Vice President

Entergy Operations, Inc.

Grand Gulf Nuclear Station

P.O. Box 756

Port Gibson, MS 39150

SUBJECT:

GRAND GULF NUCLEAR STATION - NOTIFICATION OF INSPECTION (NRC

INSPECTION REPORT 05000416/2025003) AND REQUEST FOR

INFORMATION

Dear Brad Kapellas:

During the week of August 18, 2025, three inspectors from the Nuclear Regulatory

Commissions (NRC) Region IV office will perform the baseline biennial requalification

inspection at Grand Gulf, using NRC Inspection Procedure 71111.11B, Licensed Operator

Requalification Program.

Experience has shown that this inspection is a resource intensive inspection both for the NRC

inspectors and your staff. To minimize the impact to your onsite resources and to ensure a

productive inspection, we have enclosed a request for documents needed for this inspection.

These documents have been divided into three groups:

The first group (Section A of the enclosure) identifies information to be provided prior to

the inspection to ensure that the inspectors are adequately prepared.

The second group (Section B of the enclosure) identifies the information the inspectors

will need upon arrival at the site.

The third group (Section C of this enclosure) identifies the items which are necessary to

close out the inspection and are usually sent a few weeks after the inspectors have left

the site.

It is important that all these documents are up to date and complete to minimize the number of

additional documents requested during the preparation and/or the onsite portions of the

inspection.

B. Kapellas

2

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Robert Mitchell of your training

organization. Our inspection dates are subject to change based on your updated schedule of

examination activities. If there are any questions about this inspection or the material requested,

please contact me, Chris Harrington, at (817) 200-1254 (christopher.harrington@nrc.gov).

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number

3150-0018. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget control number.

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

Chris Harrington, Operations Engineer

Operations Branch

Division of Reactor Safety

Docket No. 05000416

License No. NPF-29

Enclosure:

Initial Request for Information

Biennial Requalification Inspection

Signed by Harrington, Chris

on 07/08/25

ML25189A264

SUNSI Review

ADAMS:

Non-Publicly Available

Non-Sensitive

Keyword:

By: CMH13

Yes No

Publicly Available

Sensitive

NRC-002

OFFICE

BC:DORS/BC

OE:DORS/OB

NAME

HGepford

CHarrington

SIGNATURE

/RA/

/RA/

DATE

07/08/25

07/08/25

Enclosure

Initial Request for Information

Biennial Requalification Inspection

Grand Gulf

Inspection Report: 05000416/2025003

Inspection Dates:

August 18, 2025 - August 22, 2025

Inspection Procedure:

IP 71111.11B, Licensed Operator Requalification

Program

Lead Inspector:

Chris Harington, Operations Engineer

A. The following information is requested to support inspection preparation activities.

These items are listed by section as they appear in the inspection module (i.e. 03.04a,

03.04b, etc.). Requested materials can be sent via a file hosting service (preferably

SharePoint) or in an electronic format on CD/DVD to arrive at the Region IV office no

later than July 31, 2025.

CD/DVD to: US Nuclear Regulatory Commission, Region IV

ATTN: Chris Harrington

1600 E. Lamar Blvd

Arlington, TX 76011

General Requests:

List of licensed operators (SRO & RO) by crew (operating & staff)

List of plant events and industry operating experience incorporated into LOR

program since last BRQ

Audits and/or self-assessment reports addressing the licensed operator

requalification training program

A summary report of condition reports related to operator actions/errors in the control

room

03.04a: Biennial Requalification Written Examinations

The current and approved biennial written examination schedule

The current requalification cycle written examination results for both SRO & RO that

have already been administered up to the week prior to the inspectors arrival onsite.

2

Written examinations that have been approved for administration up to and including

the week before the inspectors are onsite. This will need to have adequate password

protection or double envelope protection if mailed via regular mail per NUREG-1021.

The current requalification cycle examination methodology (sample plan)

03.04b: Annual Requalification Operating Tests

The schedule for the operating tests (JPMs & scenarios) to be given the week of

August 18, 2025 (week inspectors are onsite)

The operating tests (JPMs & scenarios) (password protected and provide separately

via telephone at later date) to be given the week of August 18, 2025

Current requalification cycle operating tests (SRO & RO) and results up to the week

prior to the inspection inspectors arrival onsite

2024 NRC required annual operating tests

Current requalification cycle operating test methodology (sample plan)

03.04c: Administration of an Annual Requalification Operating Test

Procedures used to administer the annual operating test

Procedures used to assess operator performance

Procedures that describe conduct of simulator training

03.04d: Requalification Examination Security

Submit any tracking tools that you use to prevent excessive overlap on the written

examinations and meet the intent of sampling all required topics on a periodic basis.

Submit any tracking tools that you use to prevent excessive overlap on the operating

tests and meet the intent of sampling all required malfunctions (including major

events, instrument/component malfunctions, TS calls, etc.) on a periodic basis.

Procedures that describe examination security, including procedures used to develop

the examinations that include guidelines on overlap between examinations in current

exam cycle tests and prior year examinations

List of condition reports since the last biennial requalification inspection related to

examination security and overlap

3

03.04e: Remedial Training and Re-Examinations

List of remedial training conducted or planned since last requalification exam

(includes training provided to operators to enable passing requalification exam and

training provided to correct generic or individual weaknesses observed during

previous requalification exam cycle).

Remediation plans (lesson plans, reference materials, and attendance

documentation)

03.04f: Operator License Conditions

Procedures and program documentation for maintaining active operator licenses,

tracking training attendance, and ensuring medical fitness of licensed operators.

Procedures and associated documentation that supports reactivation of any SRO/RO

license (operating or staff crew) since the last biennial inspection.

03.04g: Control Room Simulator

Simulator discrepancy report summary list for open discrepancy reports and

summary list for those items closed since August 31, 2025.

Primary parameters tested to verify core physics parameters (such as moderator

temperature coefficient, integral rod worth). The applicable reference graphs from the

plant physics data book (electronic or other means as available) should also be

included as well as the test procedures used and the acceptance criteria with results.

A list of simulator modification packages completed in the last two-year window.

B. The following information is requested to support the onsite inspection activities.

Requested materials should be available to the inspectors, either electronically or

hardcopy, upon site arrival on August 18, 2025.

03.03: Requalification Exam Results / 03.04a and 03.04b: Biennial Requalification Written

Exam and Annual Requalification Operating Tests Quality

Results up to the day the inspectors leave the site

03.04f: Conformance with Operator License Conditions

Access to licensed operators records (operating and staff crews).

Access to licensed operators training attendance records.

Access to licensed operators medical records.

4

03.04g: Control Room Simulator Performance

Simulator discrepancies from August 31, 2023 - August 18, 2025. This should

include open and closed simulator discrepancy reports, including the

documentation/justification for closure.

Current model deficiencies, including FSAR vs design differences in the simulator

(any documentation on this).

Summary list of modifications from August 31, 2023 - August 18, 2025.

Simulator differences lesson plan used in training (current to August 18, 2025).

Simulator annual performance test packages (usually in a single book but may be

electronic or in single test packages), complete with transient tests, steady state

tests, and malfunction tests. This should also include the test procedures for each

test, the acceptance criteria, and results. For each transient test, the reference chart

should be included or an equivalent subject matter expert review versus the

simulator results with a write-up for any differences beyond the ANSI standard

requirements.

Test packages used to verify core physics parameters (such as moderator

temperature coefficient and integral rod worth). The applicable reference graphs from

the plant physics data book (electronic or other means as available) should also be

included as well as the test procedures used and the acceptance criteria with results.

C. Grand Gulf is required to send the final results summary (see Table 1 below) and any

remaining exams and operating tests that have not been reviewed to the regional

office lead inspector for this inspection for final review and comparison against the

Significance Determination Tools to communicate the exit results for the inspection.

TABLE 1: EXAMINATION RESULTS

1. Total number of licensed operators.

2. Number of licensed operators administered a requalification

examination required by 10 CFR 55.59(a).

3. Number of individual licensed operators who failed any portion of a

requalification examination (written, JPM, or individual simulator

scenario failures).

4. Divide line 3 by line 2 to obtain the individual requalification

examination failure rate. Line 3/Line 2.

%

5. Number of crews administered simulator scenarios as part of a

requalification examination required by 10 CFR 55.59(a).

6. Number of crews who performed unsatisfactorily on the

simulator scenarios.

7. Divide line 6 by line 5 to obtain the crew simulator scenario

failure rate. Line 6/Line 5.

%