ML25183A392

From kanterella
Jump to navigation Jump to search
Summary of Meeting with Global Laser Enrichment to Discuss Chapter 1 General Information and Chapter 2 Organization and Administration (EPID L-2024-NEW-0005)
ML25183A392
Person / Time
Site: 07007033
Issue date: 12/18/2025
From: Eben Allen
NRC/NMSS/DFM/FFLB
To: Lav S
NRC/NMSS/DFM/FFLB
Shared Package
ML25183A388 List:
References
EPID L-2024-NEW-0005
Download: ML25183A392 (0)


Text

OFFICIAL USE ONLY - PROPRIETARY INFORMATION OFFICIAL USE ONLY - PROPRIETARY INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 205550001 MEMORANDUM TO:

Samantha Lav, Chief Fuel Facility Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards FROM:

Eben Allen, Project Manager Fuel Facility Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards

SUBJECT:

SUMMARY

OF MEETING HELD ON JUNE 11, 2025, WITH GLOBAL LASER ENRICHMENT TO DISCUSS CHAPTER 1 GENERAL INFORMATION AND CHAPTER 2 ORGANIZATION AND ADMINISTRATION (ENTERPRISE PROJECT IDENTIFIER L-2024NEW0005)

The U.S. Nuclear Regulatory Commission (NRC) staff conducted a closed Microsoft Teams meeting with Global Laser Enrichment (GLE) on June 11, 2025, from 9:00 a.m. until 10:00 a.m.

and from 2:00 p.m. until 3:00 p.m. on Chapters 1 and 2 to facilitate a mutual understanding of NRC provided observations. There was one observation on Chapter 1 Structural safety regarding Natural Phenomena Hazards, five observations on Chapters 1 financial qualifications, five observations on Chapter 1 geotechnical, and two observations, on Chapters 1 hydrology, and 18 observations generically covering Chapter 1. During the Chapter 2 meeting a total of 36 observations were provided to GLE prior to the meeting but due to time constraints 20 were discussed in detail.

A detailed meeting summary is contained in Enclosure 1 Meeting Summary (ML25183A389).

The Chapter 1 pre-application observations can be referenced in Enclosure 2 - Pre-Application Observations on the Draft Chapter 1, General Information for Global Laser Enrichment, LLC (ML25183A390) and the Chapter 2 pre-application observations can be referenced in - Pre-Application Observations on the Draft Chapter 2, Organization and Administration for Global Laser Enrichment, LLC (ML25183A391) of this package.

CONTACT: Matthew Bartlett, NMSS/DFM 301-415-7154 Enclosures 1, 2, and 3 transmitted herewith contain proprietary information. When separated from the sensitive conditions in the enclosures, this document is decontrolled.

December 18, 2025 Signed by Allen, Eben on 12/18/25

OFFICIAL USE ONLY - PROPRIETARY INFORMATION S. Lav 2

OFFICIAL USE ONLY - PROPRIETARY INFORMATION Attendees:

NRC Global Laser Enrichment Matt Bartlett, Senior Licensing Project Manager Brandon Noe Samantha Lav, Chief Fuel Facility Licensing Jesus Diaz-Quiroz Eben Allen, Licensing Project Manager James Kloosterman Kenneth Kline, Financial Analyst David Winn Luissette Candelario-Quintana, Civil Engineer Structural Scott Steuer Gang Zhao, Structural Engineer Chris Dean George Alexander, Risk Analyst Amy Johnson Benjamin Karmiol, Fuel Cycle Operations Engineer John Olvera (BGS)

Cinthya Roman, Deputy Director, Div. Fuel Management Guy Scott Kevin Slavings James Rickman Tim Knowles Thomas (T.J.) Harrison (BGS)

Docket No. 07007033

Enclosures:

1.

Meeting Summary (Non-public) 2.

Observations on the Draft Chapter 1 (Non-public) 3.

Observations on the Draft Chapter 2 (Non-public)

ML25183A388 (pkg, non-public), ML25183A392 (memo),

ML25183A389 (encl 1, non-public), ML25183A390 (encl 2, non-public),

ML25183A391 (encl 3, non-public)

OFFICE NMSS/DFM NMSS/DFM NMSS/DFM NMSS/DFM NMSS/DFM NAME EAllen MBartlett WWheatley SLav MBartlett DATE 8/7/2025 9/2/2025 9/5/2025 12/9/2025 12/18/2025