Request for Information for the NRC Commercial Grade Dedication Inspection Inspection Report 05000440/2025011
ML25162A014
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 06/11/2025
From: Thomas Briley
NRC/RGN-III/DORS/EB1
To: Penfield R
Vistra Operations Company
References
IR 2025011
Download: ML25162A014 (1)


See also: IR 05000440/2025011

Text

Rod Penfield

Site Vice President

Vistra Operations Company, LLC

Perry Nuclear Power Plant

10 Center Road

Perry, OH 44081

SUBJECT:

PERRY NUCLEAR POWER PLANT - REQUEST FOR INFORMATION FOR

THE NRC COMMERCIAL-GRADE DEDICATION INSPECTION: INSPECTION

REPORT 05000440/2025011

Dear Rod Penfield:

On July 14, 2025, the U.S. Nuclear Regulatory Commission (NRC) will begin a

commercial-grade dedication (CGD) inspection at Perry Nuclear Power Plant. This inspection

will be performed in accordance with NRC Inspection Procedure 71111.21N.03, Commercial

Grade Dedication.

The inspection will evaluate the implementation of Perrys process for dedicating

commercial-grade items, as required in applicable portions of Title 10 of the Code of Federal

Regulations (10 CFR) Part 50, Appendix B, Quality Assurance Criteria for Nuclear Power

Plants and Fuel Reprocessing Plants, to ensure reasonable assurance is provided that these

items will perform their intended safety function. Additionally, the inspection will evaluate

implementation of Perrys procurement process for safety-related components, as required in

Appendix B.

Experience with previous baseline inspections of similar depth and length has shown that this

type of inspection is resource intensive, both for the NRC inspectors and the licensee staff. To

minimize the inspection impact on the site and to ensure a productive inspection for both

parties, we have enclosed a request for information. The first request (Enclosure 1) is generally

for information that will be used to choose the inspection samples or information that will be

applicable to all inspection samples throughout the inspection. The second request

(Enclosure 2) is for information that is specific to an individual sample.

We have discussed the schedule for inspection activities with your staff and understand that our

regulatory contact for this inspection will be George Dujanovic of your organization.

If there are any questions about the material requested, or the inspection in general, please

contact the lead inspector, Thomas Briley, at 630-829-9595 or Thomas.Briley@nrc.gov.

June 11, 2025

R. Penfield

2

This letter contains voluntary information collections that are subject to the Paperwork

Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB)

approved these information collections (approval number 3150-0011). The burden to the public

for these information collections is estimated to average 42 hours4.861111e-4 days <br />0.0117 hours <br />6.944444e-5 weeks <br />1.5981e-5 months <br /> per response. Send

comments regarding this information collection to the FOIA, Library and Information Collection

Branch, Office of the Chief Information Officer, Mail Stop: T6-A10M, U.S. Nuclear Regulatory

Commission, Washington, DC 20555-0001, or by email to Infocollects.Resource@nrc.gov, and

to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0011)

OMB, Washington, DC 20503.

The NRC may not conduct nor sponsor, and a person is not required to respond to, a request

for information or an information collection requirement unless the requesting document

displays a currently valid OMB control number.

In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,

of the NRCs Rules of Practice, a copy of this letter, its enclosures, and your response (if any)

will be available electronically for public inspection in the NRCs Public Document Room or from

the Publicly Available Records System (PARS) component of NRC's Agencywide Document

Access and Management System (ADAMS). ADAMS is accessible from the NRC website at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

Thomas Briley, Senior Reactor Inspector

Engineering Branch 1

Division of Operating Reactor Safety

Docket No. 05000440

License No. NPF-58

Enclosure:

1.

Requested Information to Support

Commercial-Grade Dedication

Sample Selection

2.

Requested Information to Support

Commercial-Grade Dedication

Inspection

cc: Distribution via Listserv

Signed by Briley, Thomas

on 06/11/25

R. Penfield

3

Letter to Rod Penfield from Thomas Briley dated June 11, 2025.

SUBJECT:

PERRY NUCLEAR POWER PLANT - REQUEST FOR INFORMATION FOR

THE NRC COMMERCIAL-GRADE DEDICATION INSPECTION:

INSPECTION REPORT 05000440/2025011

DISTRIBUTION:

Tim Steadham

RidsNrrPMPerry Resource

RidsNrrDorlLpl3

RidsNrrDroIrib Resource

Jack Giessner

Mohammed Shuaibi

Diana Betancourt-Roldan

Bryan Bergeon

John Pelchat

David Curtis

Jared Heck

R3-DORS

ADAMS Accession Number: ML25162A014

Publicly Available

Non-Publicly Available

Sensitive

Non-Sensitive

OFFICE

RIII

NAME

TBriley:gmp

DATE

06/11/2025

OFFICIAL RECORD COPY

Enclosure 1

Enclosure 1 - Requested Information to Support Commercial-Grade Degradation Sample

Selection

The documents and information requested below should generally be made electronically

available to the inspection team for the teams use both on-site and off-site. At the end of the

inspection, the documents in the teams possession should not be retained. This document

request is based on typical documents that a generic plant might have. As such, this document

request is not meant to imply that any specific plant is required to have all the listed documents.

In addition, your plant-specific document titles may vary from the document titles listed below.

The following information is requested by June 23, 2025, or sooner, to facilitate sample

selection.

Documents requested, if available:

1.

Copy of procedures for dedicating commercial-grade items/services, procuring

safety-related structures, systems, and components (SSCs), performing receipt

inspections, controlling counterfeit, fraudulent, and suspect items, and 10 CFR Part 21

evaluations and reporting.

2.

List of commercial-grade items, with a brief description of application, that have been

dedicated for safety-related application within the past six years. These items may be

dedicated by Perry or dedicated by a vendor (or other licensee) and procured by Perry.

Please note whether the item has been installed in the plant. The list should identify the

systems/components where the items were installed or were intended to be installed for

use.

3.

List of components procured as safety-related within the past six years. Please note

whether the item has been installed in the plant. The list should identify the

systems/components where the items were installed or were intended to be installed for

use.

4.

List of corrective action program documents, with descriptions, related to

commercial-grade items, procurement, or storage, including any items that failed after

completing the dedication process. The list should encompass the past six years of

these activities.

5.

List components procured as safety-related or commercial-grade items intended to be

dedicated for safety-related applications that are on hold because of concerns identified

during receipt, dedication, or from operating experience/corrective action program as

applicable. The list should identify the systems/components where the items were

intended to be installed for use.

6.

Copies of any self-assessments/audits of the safety-related procurement or the

commercial-grade dedication and procurement processes that were completed within

the two-years prior to the start date of this inspection.

2

7.

List of components procured as safety-related or commercial-grade items dedicated for

safety-related applications, in the past six years, where the procurement/dedication

process was expedited to support rapid turnaround (less than seven days). The list

should identify the systems/components where the expedited items were installed or

were intended to be installed for use. It should also identify whether the item has been

installed.

8.

List of systems (system numbers/designators and corresponding names)

9.

Copy of qualifications, as applicable, of personnel who performed commercial-grade

dedication, safety-related component procurement, and/or receipt inspection/testing

activities within the past six years.

10. Copy of updated final safety analysis report, technical specifications (and bases), and

technical requirements manual.

11. Copy of simplified plant drawings (if available). Note: these may be uncontrolled

documents such as big notes, training diagrams, etc.

Enclosure 2

Enclosure 2: Requested Information to Support Commercial-Grade Degradation Inspection

The team lead will identify samples (i.e., structures and components) following receipt of

information contained in Enclosure 1. The documents and information requested below should

generally be made electronically available to the inspection team for the team's use both on-site

and off-site. At the end of the inspection, the documents in the teams possession should not be

retained. This document request is based on typical documents that a generic plant might have.

As such, this document request is not meant to imply that any specific plant is required to have

all the listed documents. In addition, your plant-specific document titles may vary from the

document titles listed below. We also request that the information provided be sorted by the list

below for each sample.

The following information is requested by July 7, 2025, or sooner, to facilitate the inspection.

Documents requested, if available:

1.

Complete commercial-grade item dedication package including relevant documentation

such as the following, as applicable: description of item/service, identification of safety

functions and safety classifications, like-for-like or equivalency evaluations, credible

failure modes/failure modes and effects analysis, critical characteristics and acceptance

criteria, identification of the suppliers commercial quality assurance program or other

documented controls.

2.

Complete purchase order including relevant documentation such as the following, as

applicable: purchase requisition, catalog specifications, item product data sheets/vendor

manuals, shelf-life information, service/qualified life information, certificates of

conformance/compliance/quality, vendor test and inspection reports, third-party or sub

vendor test and inspection results, vendor dedication or partial dedication information,

material receiving reports, packing list/invoices or other shipping documents, and other

pertinent vendor/licensee correspondence.

3.

Receipt inspection reports and any related test reports, documents noting any deviations

from design, material, and performance characteristics relevant to the safety function

(nonconformance dispositions).

4.

Documents showing objective evidence of special test and inspection procedures used

to verify technical and quality requirements have been met, commercial-grade survey

reports, or source verification reports; any other documents to trace the item from the

time it was dedicated to the time it was installed, tested, and accepted.

5.

Completed installation work orders and stock or material issue forms; completed

post-installation test procedures and results.

6.

Design basis information of the inspection sample such as: normal/accident service

environment, normal/accident performance requirements, design basis

document/system description, calculation/drawing/procedure updates, etc.

7.

10 CFR 50.59 documentation, if required.

2

8.

Historical performance information, including corrective action documents, maintenance

rule performance, failure analysis or root cause analysis for any failed components, and

system health reports related to the installed components.