Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000354/2025010
ML25156A024
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 06/05/2025
From: Jason Schussler
Division of Operating Reactors
To: Mcfeaters C
Public Service Enterprise Group
References
IR 2025010
Download: ML25156A024 (1)


See also: IR 05000354/2025010

Text

June 5, 2025

Charles McFeaters

President and Chief Nuclear Officer

PSEG Nuclear, LLC - N09

P.O. Box 236

Hancocks Bridge, NJ 08038

SUBJECT:

HOPE CREEK GENERATING STATION - REQUEST FOR INFORMATION

FOR A BIENNIAL PROBLEM IDENTIFICATION AND RESOLUTION

INSPECTION; INSPECTION REPORT 05000354/2025010

Dear Charles McFeaters:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region I staff will conduct a biennial problem identification and resolution inspection at

Hope Creek Generating Station. Daniel Beacon, a Senior Project Engineer from the NRCs

Region I office, will lead the inspection team. The inspection will be conducted in accordance

with Inspection Procedure 71152, Problem Identification and Resolution, dated October 31,

2023 (ADAMS Accession No. ML23214A284).

The inspection will assess the effectiveness of your problem identification and resolution

program in identifying, prioritizing, evaluating, and correcting problems, including the use of

operating experience, assessments, and audits. This inspection will also assess your program

for raising concerns under the established safety conscious work environment.

The onsite inspection is scheduled for the weeks of August 4 and August 18, 2025.

To minimize the inspection impact on the site and to ensure a productive inspection for both

parties, we have enclosed a request for information needed for the inspection. It is important

that all of these documents are up-to-date and complete in order to minimize the number of

additional documents requested during the preparation and/or the onsite portions of the

inspection. Insofar as possible, this information should be provided electronically to the lead

inspector by July 4, 2025.

If there are any questions about the inspection or the material requested in the enclosure,

please contact the lead inspector at 610-337-5372 or via e-mail at daniel.beacon@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, Control Number 3150-

0011. The NRC may not conduct or sponsor, and a person is not required to respond to,

a request for information or an information collection requirement unless the requesting

document displays a currently valid Office of Management and Budget Control Number.

C. McFeaters

2

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with Title 10 of the Code of Federal Regulations (10 CFR), Part 2.390, Public

Inspections, Exemptions, Requests for Withholding.

Sincerely,

Jason Schussler, Team Leader

Technical Support and Administrative Team

Division of Operating Reactor Safety

Docket No. 05000354

License No. NPF-57

Enclosure:

Request for Information for Biennial

Problem Identification and Resolution

Inspection

cc w/encl: Distribution via ListServ

JASON

SCHUSSLER

Digitally signed by JASON

SCHUSSLER

Date: 2025.06.05

07:29:50 -04'00'

ML25156A024

SUNSI Review

Non-Sensitive

Sensitive

Publicly Available

Non-Publicly Available

OFFICE

RI/DORS

RI/DORS

NAME

DBeacon

JSchussler

DATE

6/2/2025

6/4/2025

REQUEST FOR INFORMATION

BIENNIAL PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION

Enclosure

Inspection Report: 05000354/2025010

Team Lead Information Week of June 16, 2025

Gathering Visit:

Onsite Inspection Dates:

August 4, through August 8, 2025; and

August 18, through August 22, 2025

Inspection Procedure:

71152, Problem Identification and Resolution,

dated October 31, 2023

Lead Inspector:

Daniel Beacon, Senior Project Engineer

610-337-5372

daniel.beacon@nrc.gov

The following information is requested by July 4, 2025, or sooner, to facilitate inspection

preparation. The requested information is for the period from June 1, 2023 through

June 1, 2025 (Present), which covers the timeframe since the previous problem identification

and resolution (PI&R) inspection. The inspection procedure also specifies a five-year review for

a subset of selected program, system, or component issues. The selected samples for this five-

year review will be provided at a future date.

An information gathering trip is currently scheduled for the week of June 16, 2025. The purpose

of this trip is for the team lead to familiarize their self with the site organization including

meetings with department managers and overview of the corrective action program and to

finalize remaining administrative arrangements for the inspection.

Feel free to contact the lead inspector as soon as possible if you have any questions regarding

this information request. Please provide the information electronically in pdf files, Excel, or

other searchable formats, preferably on an internet database system (e.g., OneDrive). The files

should contain descriptive names, be indexed, and hyperlinked to facilitate ease of use.

Information in lists should contain enough information to be easily understood by someone

who has knowledge of light water reactor technology.

I. General

1. Organization charts, phone list, and list of system engineers.

2. List of system numbers/designations and a list of system engineers assigned to those

systems.

3. Access to a hardcopy set of system prints (P&IDs) and operator training manuals for the

team room. These will be returned at the end of the inspection.

4. Technical Requirements Manual (TRM) including the bases.

5. Copy of the Quality Assurance Manual and Quality Assurance Topical Report.

REQUEST FOR INFORMATION

BIENNIAL PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION

2

6. A schedule of the date/time/location of meetings associated with implementation of the

correction action program such as Plan-of-the-Day, Station Ownership Committee

(SOC), Management Review Committee (MRC), etc.

7. Probability risk assessment (PRA) risk-ranking of systems, including a chart with highest

risk systems/components.

II. Corrective Actions

1. Copy of procedures related to the corrective action program, including issue

identification, cause evaluations, corrective actions, trending, self-assessments, audits,

operability determinations, work management, operating experience, etc.

2. List of all corrective action program deficiency reports (Notifications) initiated after

June 1, 2023 (last PI&R inspection) - in electronic spreadsheet format - include the

following (as applicable): system number/designation, date initiated, significance level,

status (open or closed), title/short description, department, date closed or due, and if

possible, the number of due date extensions.

3. Separate list of all corrective action program documents (Notifications) initiated before

June 1, 2023 (last PI&R inspection) that remain open - in electronic spreadsheet

format - include the following (as applicable): system number/designation, date initiated,

significance level, status (open or closed), title/short description, department, date

closed or due, and if possible, the number of due date extensions.

4. List of all root cause evaluations (RCE), apparent cause evaluations (ACE), common

cause evaluations (CCE), and work group evaluations (WGE), performed after June 1,

2023 (last PI&R inspection) - include number, title, eval type, and date completed.

5. Matrix of the total number of condition report Notifications generated annually and

monthly for all of 2023 and 2024, and to date for 2025 by department.

6. For all notice of violations, non-cited violations, and findings issued since

June 1, 2023 (last PI&R inspection) - provide copies of the associated Notifications

including all supporting information such as closeout documentation.

7. For all licensee event reports (LERs) issued since June 1, 2023 (last PI&R inspection) -

provide copies of the associated Notifications including all supporting information such

as closeout documentation.

8. List of open temporary modifications, operability determinations, control room

deficiencies and operator workarounds\\challenges, and adverse condition monitoring

plans - in electronic spreadsheet format - include tracking no., system id., title/short

description, date initiated, and date corrective action(s) due/work order(s) scheduled.

9. List of rework and repeat maintenance items, and a list of maintenance performance

metrics including the backlog of corrective and elective maintenance issues - include

tracking no., unit/system id, work order no., title/short description, date initiated, date

corrective action(s) due/work order(s) scheduled, and department.

REQUEST FOR INFORMATION

BIENNIAL PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION

3

10. Copies of the system health reports for all (a)(1) systems and all systems pending

maintenance rule expert panel review for (a)(1) status determination.

11. List of all maintenance rule systems, include risk significance of system (high or low) and

whether the system is considered an (a)(1) or (a)(2). The list should indicate the trend in

overall system performance since the last PI&R inspection. For all (a)(1) systems,

please include a copy of the Action Plan and expert panel minutes.

III. Operating Experience

1. List of operating experience reviews, including Part 21s and NRC generic

communications (i.e., Information Notices, Generic Letters, Bulletins) initiated since the

last PI&R inspection. Provide tracking number, title/short description, date initiated, date

due or closed, significance level, evaluation class/type, status, department, and, if

possible, the number of due date extensions.

2. List of industry operating experience issues (nuclear steam supply system vendor

reports, EPRI Reports, and OPEX reports from other facilities) entered into the

corrective action program for review since the last PI&R inspection. Provide tracking

number, title/short description, date initiated, date due or closed, significance level,

evaluation class/type, status, department, and, if possible, the number of due date

extensions.

3. List of correction action program tracking items generated as a result of issues identified

during the operating experience (OE) reviews and assessment. Provide tracking

number, title/short description, date initiated, date due or closer, significance level,

evaluation class/type, status, department, and, if possible, the number of due date

extensions.

IV. Audits and Assessments

1. Copy of all Quality Assurance (QA) reviews (audits, assessments, etc.) and self-

assessments of the corrective action program performed, and safety culture reviews

since the last PI&R inspection.

2. Copy of the corrective action program trend reports and performance indicators used by

management since the last PI&R inspection.

3. A list of Notifications generated as a result of identified trends (either by station or

department) initiated since the last PI&R inspection. Provide IR number, title, and

open/closed status.

4. List of reports or specific issues identified by safety review committees (such as PORC,

NSRB, etc.) or other management oversight mechanisms since the last PI&R inspection.

Indicate whether these items are being tracked in the corrective action program or other

means.

5. Most recent PI&R functional area self-assessment (FASA) that was performed in

preparation for the upcoming PI&R inspection.

REQUEST FOR INFORMATION

BIENNIAL PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION

4

6. Last completed Institute of Nuclear Power Operations (INPO) evaluation and assistance

report. (Hard copy only. Will be reviewed onsite to maintain confidentiality.)

V. Safety Conscious Work Environment and Employee Concern Program (ECP)

1. Procedures related to the ECP.

2. Procedures related to the Safety Conscious Work Environment and the stations

management of related issues.

3. Access to a list of all ECP cases and contacts initiated since the last PI&R inspection.

Include a list of IRs generated as a result of these reviews. (Will be reviewed onsite to

maintain confidentiality)

4. All safety culture reviews (audits, assessments, surveys, trend review, etc.) initiated

since the last PI&R inspection. Include a list of any Notifications generated as a result of