ML25153A513

From kanterella
Jump to navigation Jump to search
Service, Inc., NRC Regulatory Issue Summary 2025-03; Preparation and Scheduling of Operator Licensing Examinations
ML25153A513
Person / Time
Site: Millstone, Summer, Surry, North Anna  Dominion icon.png
Issue date: 06/02/2025
From: James Holloway
Dominion Energy Services, Dominion Nuclear Connecticut, South Carolina Electric & Gas Co, Virginia Electric & Power Co (VEPCO)
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
25-126
Download: ML25153A513 (1)


Text

June 2, 2025 Dominion Energy Services, Inc.

5000 Dominion Boulevard, Glen Allen. VA 23060 Dominior.Energy.com United States Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 DOMINION ENERGY NUCLEAR CONNECTICUT, INC.

VIRGINIA ELECTRIC AND POWER COMPANY DOMINION ENERGY SOUTH CAROLINA, INC.

MILLSTONE POWER STATION UNITS 2 AND 3 NORTH ANNA POWER STATION UNITS 1 AND 2 SURRY POWER STATION UNITS 1 AND 2 VIRGIL C. SUMMER NUCLEAR STATION UNIT 1 NRC REGULATORY ISSUE

SUMMARY

2025-03

~

Dominion

~

Energy" Serial No.:

25-126 NRA/KHB RO Docket Nos.: 50-336/423 50-338/339 50-280/281 50-395 License Nos.: DPR-65 NPF-49 NPF-4/7 DPR-32/37 NPF-12 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS In response to NRC Regulatory Issue Summary 2025-03, enclosed is the requested information on proposed site-specific operator licensing examination schedules and the estimated number of applicants planning to take those examinations and/or the NRC's generic fundamentals examinations (GFEs).

No new commitments are intended by this letter. If you have any questions concerning this information, please contact Mr. Shayan Sinha at (804) 273-4687.

Sincerely,

( //-\\

Cf,

.{-1/'.-V-0 J (~~..,__.,-c,,.-..,,..._.'

r I

f James E. Holloway 0

Vice President - Nuclear Engineering and Fleet Support

Enclosures:

1. NRG Form 536 for Millstone
2. NRG Form 536 for North Anna
3. NRG Form 536 for Surry
4. NRG Form 536 for V. C. Summer Commitments made by this letter: None cc:

U.S. Nuclear Regulatory Commission Region I ATTN: Operations Branch U.S. Nuclear Regulatory Commission Region II ATTN: Operations Branch Mr. Richard Guzman U. S. Nuclear Regulatory Commission G. Edward Miller NRG Project Manager U.S. Nuclear Regulatory Commission L. John Klos NRG Project Manager U.S. Nuclear Regulatory Commission NRG Senior Resident Inspector Millstone Power Station NRG Senior Resident Inspector North Anna Power Station NRG Senior Resident Inspector Surry Power Station NRG Senior Resident Inspector V. C. Summer Nuclear Station SN 25-126 Page 2 of 2

SN 25-126 NRC Form 536 for Millstone Power Station Millstone Power Station Dominion Energy Nuclear Connecticut, INC

NRC FORM 536 U. S. NUCLEAR REGULA TORY COMMISSION APPROVED BY 0MB: NO. 3150-0131 EXPIRES: 01/31/2027 (01-16-2024) c)Y"u<o,,,

Estimated burden per,esponse to comply 1*,ilh lhis vo!\\Jntary infoonation colloction request 45 m'nutes.

.:,"'~~

~,o~

OPERA TOR LICENSING This informalioo collection is used lo plan budgels and resources for operalol exam:nalions. Send

~

oommenls regarding burden eslimale to the FOIA, Library, and ln!Olmation Col!ecUons Branch (T-6 0

A10M), U.S. Nuclear Regula!oly Commission, Washington, DC 20555-0001, or by ema;I to

\\;

EXAMINATION DATA i

I lnfooo!lecls.Resource@nrc.gov, and the 0MB reviewer at 0MB Office of lnlormalion and RegulatOIY

'+.,

+o.._

Affa~s. (3150-0131), Attn: Desk Off,cer for the Nuclear Regulato/y Commission, 725 17th Streel NW,

~......

Washington, DC 20503; email: o'ra submiss!oncmb.eoo.gov. The NRG ma-1 not conduct or sponsor, and a person is not,equired to respond to, a collection of infOlmation un!ess the document rnquesting or requiring the collection displays a currenlly valid 0MB control numbel.

FACILITY NRC REGION

!Millstone Unit 2 11 1

A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2026 CY 2027 CY 2028 cy2029 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

0 1

0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2026 CY2027 CY2028 CY2029 NUMBER OF REACTOR 8

0 8

0 OPERATORS NUMBER OF SENIOR REACTOR 4

0 4

0 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 4

0 4

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 09/1412026 NIA 09111/2028 NIA ALTERNATE DATE 0912112026 NIA 09/1812028 NIA NRG FORM 536 (01-16-2024)

NRC FORM536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3150-0131 EXPIRES: 01/31/2027 (01-16-2024)

<]Y'RREGc,,c Estimated burden per response lo comply wilh !his voluntary information collection request 45 minutes.

~

This information collection is used lo plan budgets and resources for operator examinations. Send

/ ~

OPERATOR LICENSING

~

comments regarding burden estimale lo the FOIA, Library, and Information Collections Branch (T-6

~

0 A10M), U.S. Nuclear Regulatory Commission. Washington, DC 20555-0001. or by email to

\\;

~

EXAMINATION DATA

':,~:a l

~

lnfocol1ects.Resouri:e@nrc.gov, and lhe 0MB reviewer at 0MB Office of Information and Regulatory

+-0#

Affairs, (3150-0131), Attn: Desk Officer for the Nuclear Regulatory Commission, 725 17th Street NW, Washington, DC 20503; email: oira submission@omb.eop.oov.

The NRC may not conduct or sponsor, and a person is not requred to respond to, a collection of information unless the document requesting or requiring the collection displays a currently val.d 0MB control number.

FACILITY NRCREGION

!Millstone Unit 3 I

I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2026 CY 2027 CY 2028 cy2029 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

1 0

1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2026 CY2027 CY2028 CY2029 NUMBER OF REACTOR 0

6 0

6 OPERATORS NUMBER OF SENIOR REACTOR 0

8 0

8 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 0

4 0

4 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERA TORS - LIMITED PROPOSED DA TES PRIMARY DATE NA 09/13/2027 NA 09/10/2029 ALTERNATE DATE NA 09/20/2027 NA 09/17/2029 NRG FORM 536 (01 2024)

NRC Form 536 for North Anna Power Station North Anna Power Station Virginia Electric and Power Company SN 25-126

NRC FORM 536 U. S. NUCLEAR REGULA TORY COMMISSION APPROVED BY 0MB: NO. 3150-0131 EXPIRES: 01/31/2027 (01-16-2024)

Estimated burden per response to comply \\\\ilh this vo!untary infonnation collection request: 45 minutes.

l.,~,\\

OPERA TOR LICENSING This inf0fll1ation collection is used to plan budgets and resources for operator examinations. Send comments reganfng burden estimate lo the FOIA, Library, and Information Collections Branch (T-6 0

A10M), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by email to EXAMINATION DATA c;,_

il

~

't,~

p lnfocollecls.Resource@nrc.gov, and the 0MB reviewer at 0MB Office of Information and Regulatory

,s...,

+o Aflails, (3150-0131), Attn: Desk Olficer for the Nuclear Regulatory Commission, 725 17th Street NW, Washington, DC 20503: email: oira submission@omb.eop gov.

The NRC may not conduct or sponsor, and a person is not requred to respond to, a collection of infoonation unless the document requesting°' requiring the collection displays a curiently valid 0MB control number.

FACILITY NRCREGION INorth Anna Power Station 11 11 I

A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2026 CY 2027 CY 2028 cy2029 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

1 1

0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2026 CY2027 CY2028 CY2029 NUMBER OF REACTOR 7

8 8

0 OPERATORS NUMBER OF SENIOR REACTOR 1

4 4

0 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 2

4 4

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 6/8/2026 8/15/2027 8/7/2028 ALTERNATE DATE n/a n/a 9/18/2028 NRC FORM 536 (01-16-2024)

SN 25-126 NRC Form 536 for Surry Power Station Surry Power Station Virginia Electric and Power Company

NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3150*0131 EXPIRES: 01/31/2027 (01-16-2024)

~

IU:oc,,(

Estimated burden per response to oomply with this voluntary information collection request 45 minutes.

This information collection is used to plan budgets and resources for operator exam11ations. Send o.,

OPERATOR LICENSING

/;

~

corrvnenls regarding burden estimate to the FOIA, Library, and Information Col eclions Branch {f.6

~

0 A 10M), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by emal to

\\; ~

EXAMINATION DATA

\\

I lnfocollects.Resource@llrc.gov, and the OMS reviewer at 0MB Ollice of Information and Regu!atory

s,.-1

+-0 Affairs, (3150-0131), Attn: Desk Officer for the Nuclear Regulatory Commission, 725 17th Street NW, Washington, DC 20503; ema3: oira submission@OOlbeoo.gov.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless the doc>Jment requesting or requiring the collection displays a currently valid 0MB control number.

FACILITY NRC REGION iurry Power Station I

II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2026 CY 2027 CY 2028 cv2029 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

1 1

0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2026 CY2027 CY2028 CY2029 NUMBER OF REACTOR 12 12 OPERATORS NUMBER OF SENIOR REACTOR 7

6 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 2

3 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 OPERA TORS - LIMITED PROPOSED DATES PRIMARY DATE 3/15/2027 8/28/2028 AL TERNA TE DATE 3/22/2027 09/05/2028 NRC FORM 536 (01-16-2024)

NRC Form 536 for Virgil C. Summer Nuclear Station Virgil C. Summer Nuclear Station Dominion Energy South Carolina, INC.

SN 25-126

NRCFORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3150-0131 EXPIRES: 01/31/2027 (01 2024)

~I\\IIE"q&{

Estimated burden per response to comply v.ith this voluntary information collection request 45 minutes.

o:,Y This information collection is used to plan budgets and resources for operator examinations. Send

/ ~

OPERATOR LICENSING

~

comments regard!ng burden estimate to the FOIA, Library, and lnfom,alion Collections Branch (T-6 0

A 10M). U.S. Nuclear Regulatory Commission, Wash;ngton, DC 20555-0001, or by email to t;

~

EXAMINATION DATA

~~

r.

~

lnfocollects.Resource@nrc.gov, and the 0MB reviewer at 0MB Office ol lnfom,ation and Regulato,y

~o~

Affairs, (3150-0131), Attn: Desk Offocer for the Nuclear Regulatory CO<nmission, 725 17th Street NW, Washington, DC 20503; email:

oira submission@ornb.eoo.oov.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless the document requesting or requiring the collection displays a currentiy valid 0MB control number.

FACILITY NRC REGION Ive Summer I !Region II I

I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2026 CY 2027 CY 2028 cy2029 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

1 0

1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2026 CY2027 CY2028 CY2029 NUMBER OF REACTOR 0

9 0

9 OPERATORS NUMBER OF SENIOR REACTOR 0

3 0

3 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 0

3 0

3 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-LIMITED PROPOSED DATES 3/30/26-9/27 /27 1/03/28-10/19/29 PRIMARY DATE 09/06/2027 10/08/2029 ALTERNATE DATE 08/30/2027 11/08/2029 NRG FORM 536 (01-16-2024)