ML25148A342

From kanterella
Jump to navigation Jump to search
Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 24
ML25148A342
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 03/17/2025
From: Bonifanti M
Constellation Energy Generation
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
25-10
Download: ML25148A342 (1)


Text

,,,,,_,,

SAFEGUARDS INFORMATION

~

Constellation, CCN: 25-10 March 17, 2025 Page 1 10 CFR 50.90 10 CFR 50.54(p)

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Peach Bottom Atomic Power Station, Units 1, 2, 3, and Independent Spent Fuel Storage Installation (ISFSI).

Facility Operating License No. DPR-12 Subsequent Renewed Facility Operating License Nos. DPR-44 and DPR 56 NRC Docket Nos. 50-171, 50-277, 50-278 and 72-29

Subject:

Peach Bottom Atomic Power Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 24 In accordance with 10 CFR 50.54, "Conditions of licenses," paragraph (p)(2), Constellation Energy Generation, LLC (CEG) is submitting Revision 24 to the Peach Bottom Atomic Power Station (PBAPS) Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program (Security Plan). This revision was implemented on March 7, 2025. In accordance with 10 CFR 50.54(p)(2), PBAPS is submitting this change within 60 days of implementation (i.e., no later than May 6, 2025).

The PBAPS Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program have been revised as a result of new industry Rule guidance. The affected Security Plan sections are as follows:

1. Section 16.2; Communications; System Descriptions.
2. Section 24.1.3; Temporary Suspension of Security Measures; Reporting
3. Section 24.2.3; Suspensions of Security Measures during Severe Weather or Other Hazardous Conditions; Notification.
4. Appendix A: Glossary of Terms and Acronyms.

CEG has concluded that the changes do not decrease the safeguards effectiveness of the PBAPS Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, or the Independent Spent Fuel Storage Installation Security Program. and Attachment 2 contain Safeguards Information. Therefore, CEG requests that this information be withheld from public disclosure in accordance with 10 CFR 2.390, "Public SAFEGUARDS INFORMATION ATTACHMENT 1 and ATTACHMENT 2 CONTAIN SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED Soo 1 JJivf 55 Zip

,J~~

µ,..,f 5 5

SAFEGUARDS INFORMATION

  • rim Constellation U.S. Nuclear Regulatory Commission March 17, 2025 Page 2 inspections, exemptions, requests for withholding," paragraph (a)(1 )(i), and 10 CFR 73.21,

"Requirements for the protection of safeguards information," paragraph (b)(1 )(i).

There are no commitments in this letter.

If you have any questions or require additional information, please contact Mr. Ray Moye Jr.,

Senior Manager Site Security at 717-456-3025.

Respectfully,

~~4bf Martin A Bonifanti Site Vice President Peach Bottom Atomic Power Station Constellation Generation Company, LLC Attachments: 1. Peach Bottom Atomic Power Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 24 (Contains Safeguards Information) including Figures 1, 2, and 3 (Non-Safeguards Information)

2. SY-AA-101-104-F-03, Table of Changes for Site Security Plan Change Submittals (Contains Safeguards Information) cc:

Regional Administrator - NRC Region I w/attachments SAFEGUARDS INFORMATION ATTACHMENT 1 and ATTACHMENT 2 CONTAIN SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED

SAFEGUARDS INFORMATION

,._,, Constellation.

U.S. Nuclear Regulatory Commission March 17, 2025 Page 3 bee:

Sr. Vice President, Mid-Atlantic Operations Sr. Vice President, Operations Support w/o attachments Site Vice President, PBAPS Plant Manager, PBAPS Director, Operations, PBAPS Senior Manager, Site Security, PBAPS Senior Manager, Site Training, PBAPS Manager, Regulatory Assurance, PBAPS Manager, Licensing - KSA3-E Commitment Coordinator - PBAPS Records Management - PBAPS SAFEGUARDS INFORMATION ATTACHMENT 1 and ATTACHMENT 2 CONTAIN SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED II II II II II II II

SAFEGUARDS INFORMATION

  • ~

Constellation U.S. Nuclear Regulatory Commission March 17, 2025 Page 4 ATTACHMENT 1 Peach Bottom Atomic Power Station, Units 1, 2, 3 and ISFSI Docket No. 50-171, 50-277, 50-278 and 72-29 Peach Bottom Atomic Power Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 24 (Includes Figures 1, 2, and 3)

SAFEGUARDS INFORMATION ATTACHMENT 1 CONTAINS SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED

SAFEGUARDS INFORMATION

-_, Constellation U.S. Nuclear Regulatory Commission March 17, 2025 Page 5 ATTACHMENT 2 Peach Bottom Atomic Power Station, Units 1, 2, 3 and ISFSI Docket No. 50-171, 50-277, 50-278 and 72-29 SY-AA-101-104-F-03, Table of Changes for Site Security Plan Change Submittals SAFEGUARDS INFORMATION ATTACHMENT 2 CONTAINS SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED