ML25147A095

From kanterella
Jump to navigation Jump to search
RB-2024-11-Public Forms
ML25147A095
Person / Time
Site: River Bend 
Issue date: 11/25/2024
From: Heather Gepford
Operations Branch IV
To:
Entergy Operations
References
05000458/2024301
Download: ML25147A095 (0)


Text

EXAM ASSIGNMENT TICKLER Chief:

Hernandez Facility:

RBS 11/25/2024 U/I:

Start of Op Test:

11/18/2024 11/22/2024 Due Date Date Complete Initials 3/18/2024 11/29/2023 NH 4/22/2024 11/29/2023 NH 4/22/2024 11/29/2023 NH 4/22/2024 4/8/2024 NH 4/22/2024 4/3/2024 NH 5/6/2024 11/30/2023 NH 6/17/2024 6/17/2024 NH 7/1/2024 6/30/2024 NH 8/12/2024 n/a 9/2/2024 9/4/2024 NH 9/16/2024 9/12/2024 NH 9/30/2024 9/30/2024 NH 10/14/2024 10/1/2024 NH 10/14/2024 10/10/2024 NH 10/7/2024 10/7/2024 NH 10/21/2024 10/21/2024 NH 10/28/2024 11/4/2024 NH 11/4/2024 11/8/2024 NH 11/11/2024 11/14/2024 NH 11/11/2024 n/a 11/11/2024 11/14/2024 NH 11/11/2024 10/10/2024 NH 11/11/2024 11/14/2024 NH 11/18/2024 11/14/2024 NH 12/6/2024 12/6/2024 NH 12/15/2024 12/2/2024 NH 12/23/2024 n/a 12/23/2024 12/9/2024 NH 12/30/2024 12/9/2024 NH 1/6/2025 12/17/2024 NH 1/13/2025 n/a 1/13/2025 12/17/2024 NH 1/13/2025 1/10/2024 NH 2/3/2025 n/a 2/10/2025 1/10/2024 NH 2/17/2025 n/a Rev. 12 Final applications reviewed and audited; exam approval and waiver/excusal letters sent On-site validation & 10% audit of license applications Administer Operating Test Preliminary license applications & waiver/excusal requests due NRC Forms 398/396 Final license applications & waiver/excusal requests due Form 2.2-1 Proctoring/written exam administration guidelines reviewed with facility licensee Preliminary license applications and waivers reviewed Facility licensee management feedback on the examination requested by the NRC supervisor Written exams and operating tests approved by Branch Chief Approved scenarios and JPMs distributed to examiners BC signs Exam Approval Letter (Form 2.3-1)

Operating test outline(s) reviewed by NRC and feedback provided to facility licensee Form 2.3-1 signed by CE & BC Peer review of written exam complete Form 2.3-5 Proposed exams, outlines, supporting documentation, and reference materials due.

Written exam and operating test reviews completed Document review on Forms 2.3-1 and 2.3-5 NRC-prepared examinations approved by the NRC supervisor and forwarded for facility licensee review Feedback approved by Branch Chief Examination review results discussed between NRC and facility licensee NRC examiners and facility contact assigned Facility contact briefed on security and other requirements Operating test outline(s) and other checklists due Forms 1.3-1, 2.3-1, 3.2-1, 3.2-2, 3.4-1, 3.3-1 Reference material due for NRC prepared exams ES-2.1.F Corporate Notification Letter sent Letter 2.1-1 produced by CE NRC developed written examination outline sent to facility contact Forms 4.1-BWR/PWR and COMMON Date of Written Exam:

Description Notes Examination administration date confirmed For NRC prepared exams, arrangements made for the facility to submit reference materials End of Op Test:

Written Exam Developed By: NRC / Facility Operating Test Developed By: NRC / Facility RPS/IP number of examinees updated print Report-21 Waivers/deferrals reviewed for impact on licensing decision Post exam written comments reviewed and incorporated and NRC grading completed Chief examiner review of operating test and/or written exam grading completed Branch Chief review of exam results completed Examiner's document op test results on ES 303's Replaces NUREG-1021, Revision 12, Forms 2.1-1 and 5.1-1 Post exam operating test comments reviewed and ES-303-1 updated Signed ES 303's to BC produced by CE License/Proposed Denial letters mailed; Facility notified of results Ref Mat'l Returned after Final Resolution of Appeals Examination Report Issued 21 days after proposed denial letters mailed.

Post exam comments and graded exams received Final Denial Letters mailed (if no request for informal review)

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Nicholas Hernandez /

Nicholas Hernandez /

11/7/2024 11/7/2024 Heather Gepford / 11/14/2024

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
a.
b.

C.

Form 2.3-4 Written Examination Quality Checklist Facility: RBS Date of Exam: 11/25/2024 Exam Level:

RO/SRO Item Description Questions and answers are technically accurate and applicable to the facility. Each question includes a technical reference.

a. All questions reference NRG knowledge and abilities (KIAs) requirements.
b. Facility learning objectives are referenced as available.
c. All questions include an exolanation of the correct answer exolanation and a distractor analvsis.

Senior reactor operator (SRO) questions test at the SRO license level.

The sampling process was random and systematic. (If more than four reactor operator (RO) or two SRO questions were repeated from the last two NRG licensing exams, including full {100-question) retake examinations, consult the NRG Office of Nuclear Reactor Regulation operator licensing oroaram office.}

Question duplication from the licensee screening/audit exam was controlled as indicated below (check the item that applies) and appears appropriate:

_ The audit exam was systematically and randomly developed.

X The audit exam was completed before the license exam was started.

_ The examinations were developed independently.

_ The licensee certifies that there is no duplication.

Other (exolain}:

Bank use meets limits (no more than 75% from the bank, at least Bank Modified New 10% new (at the comprehension/analysis level), and the rest new or modified); enter the actual RO/SRO-only question distribution>

4/0 5/0 66/25 Between 38 and 45 questions of the questions on the RO exam and Memory GIA at least 13 of the questions on the SRO-only portion of the exam are written at the comprehension/analysis level; enter the actual RO/SRO-only question distribution >

33/ 12 42/ 13 References/handouts provided do not give away answers or aid in the elimination of distractors.

Question content conforms to specific KIA statements in the previously approved examination outline and is aoorooriate for the KIA statements' assianed tier; deviations are iustified.

Question psychometric quality and format meet the instructions and guidelines in ES-4.2.

The exam contains the required number of one-point, multiple-choice items; the total is correct and agrees with the value on the cover sheet.

Author Facility Reviewer(*)

NRG Reviewer(#)

rdnr vm um;t P

/S ig nature NRC Chief Examiner NRC Regional Supervisor

  • The facility licensee signature is not applicable for NRG-developed tests.

(Y)es/ (N)o a

b*

y y

y y

y y

y y

y y

N/A NIA y

y NIA NIA y

y y

y y

y y

y y

y Date 11/6/2024 11/6/2024

  1. An independent NRG reviewer performs steps in column c. This may be the NRG Chief Examiner if he/she did not develoo the written examination under review.

c#

Y Y

Y Y

Y N/A Y

N/A Y

Y Y

Y Y

Nicholas Hernandez /

11/7/2024 Nicholas Hernandez /

11/7/2024 Heather Gepford 11/14/2024

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Nicholas Hernandez /

Nicholas Hernandez /

11/7/2024 11/7/2024

  • 5 on scenario 1 to ensure applicants receive enough events.

Heather Gepford / 11/14/2024

Form 3.4-1 Events and Evolutions Checklist Facility: RBS Date of Exam: 11/18/24 Operating Test No. : RB-2024-11 Crew: 1 A

P P

L I

C A

N T

E V

E N

T T

Y P

E Scenarios 1

2 3

4 T

O T

A L

M I

N I

M U

M(*)

CREW POSITION CREW POSITION CREW POSITION CREW POSITION S

R O

A T

C B

O P

S R

O A

T C

B O

P S

R O

A T

C B

O P

S R

O A

T C

B O

P R

I U

RO I

U1 RX 0

0 0

1 1

0 NOR 1

0 1

1 1

1 I/C 4

4 8

4 4

2 MAJ 1

1 2

2 2

1 Man.

Ctrl 0

2 2

1 1

0 TS 2

0 2

0 2

2 RO I1 U

RX 0

0 0

1 1

0 NOR 0

1 1

1 1

1 I/C 4

8 12 4

4 2

MAJ 1

1 2

2 2

1 Man.

Ctrl 3

0 3

1 1

0 TS 0

2 2

0 2

2 RO1 I

U RX 0

0 0

1 1

0 NOR 1

1 2

1 1

1 I/C 3

4 7

4 4

2 MAJ 1

1 2

2 2

1 Man.

Ctrl 2

1 3

1 1

0 TS 0

0 0

0 2

2

Form 3.4-1 Events and Evolutions Checklist Facility: RBS Date of Exam: 11/18/24 Operating Test No. : RB-2024-11 Crew: 2 A

P P

L I

C A

N T

E V

E N

T T

Y P

E Scenarios 1

2 3

4 T

O T

A L

M I

N I

M U

M(*)

CREW POSITION CREW POSITION CREW POSITION CREW POSITION S

R O

A T

C B

O P

S R

O A

T C

B O

P S

R O

A T

C B

O P

S R

O A

T C

B O

P R

I U

RO I

U2 RX 0

0 0

1 1

0 NOR 1

0 1

1 1

1 I/C 4

4 8

4 4

2 MAJ 1

1 2

2 2

1 Man.

Ctrl 0

2 2

1 1

0 TS 2

0 2

0 2

2 RO I2 U

RX 0

0 0

1 1

0 NOR 0

1 1

1 1

1 I/C 4

8 12 4

4 2

MAJ 1

1 2

2 2

1 Man.

Ctrl 3

0 3

1 1

0 TS 0

2 2

0 2

2 RO2 I

U RX 0

0 0

1 1

0 NOR 1

1 2

1 1

1 I/C 3

4 7

4 4

2 MAJ 1

1 2

2 2

1 Man.

Ctrl 2

1 3

1 1

0 TS 0

0 0

0 2

2

Form 3.4-1 Events and Evolutions Checklist Facility: RBS Date of Exam: 11/18/24 Operating Test No. : RB-2024-11 Crew: 3 A

P P

L I

C A

N T

E V

E N

T T

Y P

E Scenarios 1

2 3

4 T

O T

A L

M I

N I

M U

M(*)

CREW POSITION CREW POSITION CREW POSITION CREW POSITION S

R O

A T

C B

O P

S R

O A

T C

B O

P S

R O

A T

C B

O P

S R

O A

T C

B O

P R

I U

RO I

U3 RX 0

0 0

1 1

0 NOR 1

0 1

1 1

1 I/C 4

4 8

4 4

2 MAJ 1

1 2

2 2

1 Man.

Ctrl 0

2 2

1 1

0 TS 2

0 2

0 2

2 RO I3 U

RX 0

0 0

1 1

0 NOR 0

1 1

1 1

1 I/C 4

8 12 4

4 2

MAJ 1

1 2

2 2

1 Man.

Ctrl 3

0 3

1 1

0 TS 0

2 2

0 2

2 RO3 I

U RX 0

0 0

1 1

0 NOR 1

1 2

1 1

1 I/C 3

4 7

4 4

2 MAJ 1

1 2

2 2

1 Man.

Ctrl 2

1 3

1 1

0 TS 0

0 0

0 2

2

Form 3.4-1 Events and Evolutions Checklist Facility: RBS Date of Exam: 11/18/24 Operating Test No. : RB-2024-11 Crew: 4 A

P P

L I

C A

N T

E V

E N

T T

Y P

E Scenarios 1

2 3

4 T

O T

A L

M I

N I

M U

M(*)

CREW POSITION CREW POSITION CREW POSITION CREW POSITION S

R O

A T

C B

O P

S R

O A

T C

B O

P S

R O

A T

C B

O P

S R

O A

T C

B O

P R

I U

RO I4 U

RX 0

0 0

1 1

0 NOR 1

0 1

1 1

1 I/C 4

4 8

4 4

2 MAJ 1

1 2

2 2

1 Man.

Ctrl 0

2 2

1 1

0 TS 2

0 2

0 2

2 RO I5 U

RX 0

0 0

1 1

0 NOR 0

1 1

1 1

1 I/C 4

8 12 4

4 2

MAJ 1

1 2

2 2

1 Man.

Ctrl 3

0 3

1 1

0 TS 0

2 2

0 2

2 RO4 I

U RX 0

0 0

1 1

0 NOR 1

1 2

1 1

1 I/C 3

4 7

4 4

2 MAJ 1

1 2

2 2

1 Man.

Ctrl 2

1 3

1 1

0 TS 0

0 0

0 2

2

IP 21 Operator Licensing Exam Schedule From 10/01/2024 to 09/30/2025 Phase Code: 2 - Construction, 5 - Operational Region: 4 By Date

  1. Candidates Exam Start Exam End Site Docket #

Insp Rpt Cac #

RO LSRO SROI SROU Type Exam Author Chief Examiner Examiner 10/6/2024 10/12/2024 River Bend 05000458-1 2024301 000956 0

0 0

0 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

Hernande z, Nick Breidenbach, Paul; Harrington, Chris; Williams, Russell; Hernandez, Nick; Kirkland, John 11/17/2024 11/23/2024 River Bend 05000458-1 2024301 000500 6

0 5

3 FB-OR-INITIAL LICENSE EXAM ADMINISTRATI ON (EXAD)

NFF Hernande z, Nick Breidenbach, Paul; Harrington, Chris; Williams, Russell; Hernandez, Nick; Kirkland, John Prepared on 1/10/2025 12:50:51 PM Activity Codes: EXAD, NEXAD, NOV, OV Exam Author: ALL Orgs: ALL Sites: RBS

IP 21 Operator Licensing Exam Schedule Region/Site Summary RO SROI SROU LSRO Total 4

6 5

3 0

14 Region/Docket Summary RO SROI SROU LSRO Total 4

6 5

3 0

14 Exam Date/Site Summary RO SROI SROU LSRO Total 11/17/2024 6

5 3

0 14 Exam Date/Docket Summary RO SROI SROU LSRO Total 11/17/2024 6

5 3

0 14 Prepared on 1/10/2025 12:50:51 PM Activity Codes: EXAD, NEXAD, NOV, OV Exam Author: ALL Orgs: ALL Sites: RBS