200 Energy Way Kennett Square, PA 19348 www.constellation.com RS-25-101 10 CFR 51 May 15, 2025 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 & DPR-25 NRC Docket Nos. 50-237 & 50-249
Subject:
Dresden Nuclear Power Station, Units 2 and 3, Subsequent License Renewal Application, Architectural Survey Update
References:
- 1. Dresden Nuclear Power Station, Units 2 and 3, Subsequent Operating License Renewal - Appendix E - Applicants Environmental Report, dated February 29, 2024 (ML24108A011)
- 2. Letter from Christopher D. Wilson (Constellation Energy Generation, LLC) to U.S. NRC, Dresden Nuclear Power Station, Units 2 and 3, Subsequent License Renewal Environmental Review, Responses to NRC Requests for Confirmation of Information (RCIs) and Requests for Additional Information (RAIs), dated February 3, 2025 (ML25034A107)
- 3. Letter RS-25-100 from Kevin Lueshen (Constellation Energy Generation, LLC) to Illinois Department of Natural Resources, State Historic Preservation Office, Dresden Nuclear Power Station Units 2 and 3 License Renewal, Draft Architectural Survey dated May 15, 2025.
In Reference 1, Constellation Energy Generation, LLC (CEG) submitted the Environmental Report for Dresden Nuclear Power Station (DNPS), Units 2 and 3, in support of the Subsequent License Renewal Application (SLRA). In the listed Reference 2, CEG provided responses to the NRCs Requests for Confirmation of Information (RCIs) and Requests for Additional Information (RAIs).
RAI HCR-07 requested CEG to conduct an architectural survey of aboveground resources on the DNPS site, identify historic properties, and apply the National Register criteria as required in 36 CFR 800.4(c).
CEG has completed a draft architectural survey in accordance with the response to RAI HCR-07, which concluded that all surveyed resources and DNPS as a whole are not eligible for National Register of Historic Places (NRHP) inclusion. The draft architectural survey was sent to the Illinois Department of Natural Resources, State Historic Preservation Office (SHPO) on May 15, 2025, with a letter requesting concurrence from the SHPO on the recommendations in the draft survey.
May 15, 2025 U.S. Nuclear Regulatory Commission Page 2 There are no regulatory commitments contained in this letter.
Should you have any questions regarding this submittal, please contact Ms. Iba Ello-Fletcher, Licensing Lead, DNPS Subsequent License Renewal Project, at (779) 231-5462 or by email at Iba.ElloFletcher@Constellation.com.
I declare under the penalty of perjury that the foregoing is true and correct. Executed on the 15th day of May 2025.
Respectfully, Kevin Lueshen Licensing Director Constellation Energy Generation, LLC cc:
NRC Regional Administrator, Region III NRC Senior Resident Inspector - Dresden Nuclear Power Station NRC Project Manager (Safety Review), NRR-DNRL NRC Project Manager (Environmental Review), NRR-DNRL NRC Project Manager, NRR-DORL - Dresden Nuclear Power Station Illinois Emergency Management Agency - Division of Nuclear Safety Lueshen, Kevin Digitally signed by Lueshen, Kevin Date: 2025.05.15 07:13:33 -05'00'