South Carolina, Inc., Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report
ML25135A114
Person / Time
Site: Summer, 07201038  South Carolina Electric & Gas Company icon.png
Issue date: 05/15/2025
From: Denise Edwards
Dominion Energy South Carolina, South Carolina Electric & Gas Co
To:
Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation, Document Control Desk
References
25-143
Download: ML25135A114 (1)


Text

Dominion Energy South Carolina V. C. Summer Nuclear Station Bradham Boulevard & Highway 215, Jenkinsville, SC 29065 Mailing Address:

P.O. Box 88, Jenkinsville, SC 29065 Dominion Energy.com ATTN: Document Control Desk US Nuclear Regulatory Commission Washington, D.C. 20555-001 May 15, 2025 DOMINION ENERGY SOUTH CAROLINA, INC.

~

Dominion*

iiiiii"' Energy Serial No.25-143 LIC/AA/RO Docket Nos. 50-395 and 72-1038 License No. NPF-12 VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) UNIT 1 INDEPENDENT SPENT FUEL STORAGE INSTALLATION ANNUAL RADIOACTIVE EFFLUENT RELEASE REPORT In accordance with 10 CFR 72.44(d)(3), Dominion Energy South Carolina, Inc. hereby submits the Independent Spent Fuel Storage Installation (ISFSI) annual report for the previous twelve months of operation at VCSNS.

By the design of the seal welded storage canisters of the ISFSI, there are no plausible effluent release pathways. Periodic surveillances and radiological surveys of and around the facilities performed during the year confirm that the canister and overpack assemblies are performing as designed. There have been no effluent releases from the ISFSI for the past twelve months.

Should you have any questions, please call Michael S. Moore at (803) 345-4752.

Sincerely,

. Edwards Director, Nuclear Station Safety and Licensing V. C. Summer Nuclear Station Commitments made by this letter: None cc:

G. J. Lindamood - Santee Cooper M. Miller - NRC G. Miller - NRC Project Manager NRC Resident Inspector ISFSI