ML25133A154

From kanterella
Jump to navigation Jump to search
Prairie Nuclear Generating Plant, Units 1 and 2 and Monticello Nuclear Generating Plant - NRC Regulatory Issue Summary 2025-03 - Preparation and Scheduling of Operator Licensing Examinations
ML25133A154
Person / Time
Site: Monticello, Prairie Island  Xcel Energy icon.png
Issue date: 05/13/2025
From: Scott S
Northern States Power Co, Xcel Energy
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
L-XE-25-008, RIS 2025-003
Download: ML25133A154 (1)


Text

(l Xcel Energy May 13, 2025 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Prairie Island Nuclear Generating Plant, Units 1 and 2 Docket Nos. 50-282 and 50-306 Renewed Facility Operating License Nos. DPR-42 and DPR-60 Monticello Nuclear Generating Plant Docket No. 50-263 Subsequent Renewed Facility Operating License No. DPR-22 414 Nicollet Mall Minneapolis, MN 55401 L-XE-25-008 RIS 2025-03 NRC Regulatory Issue Summary 2025 Preparation and Scheduling of Operator Licensing Examinations As requested by NRC Regulatory Issue Summary 2025-03, "Preparation and Scheduling of Operator Licensing Examinations," dated April 9, 2025, Northern States Power Company, a Minnesota Corporation (NSPM), doing business as Xcel Energy, hereby submits the operator licensing examination data for calendar years 2026 through 2029 for the Monticello and Prairie Island Nuclear Generating Plants. Enclosed is the corresponding NRC Form 536 which provides the estimated number of applicants to be tested and the proposed primary and alternate dates for the examinations.

Summary of Commitments Thi~k~n;w commitments and no revisions to existing commitments.

Sara L. Scott Director, Nuclear Licensing and Regulatory Services Northern States Power Company - Minnesota Enclosures cc:

Administrator, Region 111, USNRC Project Manager, Monticello and Prairie Island, USNRC Resident Inspectors, Monticello and Prairie Island, USNRC

ENCLOSURES NRC FORM 536 OPERATING LICENSING EXAMINATION DATA FOR CY 2026 THROUGH 2029 FOR MONTICELLO NUCLEAR GENERATING PLANT AND PRAIRIE ISLAND NUCLEAR GENERATING PLANT UNIT 1 AND 2 2 Pages to Follow

NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3150-0131 EXPIRES: 01/31/2027 (01-16-2024)

,C..._tJ,-P. REOt,(-1,-

Estimated burden per response to comply with this voluntaiy information collection request: 45 minutes.

This information collection is used to plan budgets and resources for operator examinations. Send

.. ~,

OPERATOR LICENSING comments regarding burden estimate to the FOIA, Libraiy, and Information Collections Branch (T-6

,c 0

A 10M), U.S. Nuclear Regulatoiy Commission, Washington, DC 20555-0001, or by email to

~ -

~:

EXAMINATION DATA l~

I lnfocollects.Resource@nrc.gov, and the 0MB reviewer at: 0MB Office of Information and Regulatoiy

~o Affairs, (3150-0131), Attn: Desk Officer for the Nuclear Regulatoiy Commission, 725 17th Street NW,

  • it**"'

Washington, DC 20503; email: ojra suhmjssjon@omb eop gov. The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless the document requesting or requiring the collection displays a currently valid 0MB control number.

FACILITY NRC REGION

!Monticello Nuclear Generating Plant I

1111 I

A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 26 CY 27 CY 28 CY 29 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED EXAMINATIONS

8. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 26 CY 27 CY 28 CY 29 NUMBER OF REACTOR 8

8 OPERATORS NUMBER OF SENIOR REACTOR 10 11 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 2

1 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 10/19/2026 9/18/2028 AL TERNA TE DA TE 10/26/2026 10/2/2028 NRC FORM 536 (01-16-2024)

NRC FORM S3S U. S. NUCLEAR REOULATORV CONM.IS5aON APPROVED BY OUB: NO. l160-4131 ElCPIRH: 01/lV2021 (t, *l h.*l JP.

i,.

( (j

~F(U~

h 1 NI t

  • J.i i *t rf*m '""' 1'I f>*i I 'Hl.i.,

OPERA TOR LICENSJNG l l l"lt iltll\\(

Qfl r.tP4l~ t J rot I t\\m) ftt <~~ U. H-:1.ud

11.

C I\\

~

9 *1dt1,

, d 1(, 11 f (I l b-: -., Hk

<11&-.

\\'f 6 I,

EXAMINATION DATA

.. M, I ~

t

    • F, *l

"'C, ff llflJ f\\

~

I, 11 l

~ ~ I t.,

t,

.bA

~.,

r t; O 1'-'....

t Ot.

  • w; d,.

l

!flJr.~,

Al, -. J3 tllj,,Al)1 tvJ-C,:.rr11t-..

  • r

~<t'tC..orwi l 1.!i,;,1'3( ilft/1 itJt -

,m.r ll lilt e 0 1; U:l(i

!((teh l

,j;, * ~ ) t I. 1\\1 O<fJf"& \\I 11,ll *-1 0 1~!

,/, n 1tr,111t., ~ hi.t:'Mi IT<Qr'fOJ lf nro_; ~. <<rrt~

l t~

t<r1111 n-:,r, FACILITY NRCREGION Prairie Island Nuclear Generating Plant Ill A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 26 CY 27 CY 28 CY 29 E.$i1MA1EO UM~OF 0

1 0

1 LICEr-1see~FREPAA ED EXAMINATIONS ESTIMATED.UMBER OF 0

0 0

0 NRC*~EPAREO EXAMJNATIOUS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 26 CY 27 CY 28 CY 29 UMEER OF REACTOR 6

6 OPt:RATOOS NU BER Of S IOAR CTOR 10 10 OPERAT~S

  • INSTANT NU 18ER Of SENIOR REACTOR 2

2 OPERATORS-UPGRAOE NV ~SSA Of SENIOR REACTOR 0

0 OPERA TORS - lit..TED PROPOSED OA. TES PAI tARY DATE 10/11/2027 8/13/2029 ALT~NATI: OATE 10/25/2027 8/27/2029 tl}C Fvl?tl ~.it* I \\.t Xll:1!