NRR E-mail Capture - Farley 1 and 2 and Vogtle 1 and 2 - Proposed Inservice Inspection (ISI) Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) (L-2024-LLR-0041)
ML25125A214
Person / Time
Site: Farley, Vogtle  Southern Nuclear icon.png
Issue date: 05/05/2025
From: John Lamb
Plant Licensing Branch II
To: Sparkman W
Southern Nuclear Operating Co
References
L-2024-LLR-0041
Download: ML25125A214 (2)


Text

From:

John Lamb Sent:

Monday, May 5, 2025 12:50 PM To:

Sparkman, Wesley A.; Johnston, Jeanne D.

Cc:

Joyce, Ryan M.

Subject:

FYI - Farley 1 and 2 and Vogtle 1 and 2 - Proposed Inservice Inspection (ISI) Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) (L-2024-LLR-0041)

Wes and Jeanne, By letter dated June 18, 2024 (ML24170B057), Southern Nuclear Operating Company (SNC, the licensee) submitted an alternative request for Joseph M. Farley Nuclear Plant (Farley), Units 1 and 2, and Vogtle Electric Generating Plan (Vogtle), Units 1 and 2. This proposed alternative would increase the inspection interval of American Society of Mechanical EngineersSection XI Table IWB-2500-1 Examination Category B-B and Table IWC-2500-1 Examination Category C-A for item numbers B2.40, C1.10, C1.20, and C1.30 from every ISI interval to every other interval.

By email dated June 26, 2024 (ML24180A001), the NRC staff accepted the Alternative request for review with an estimated completion date of June 26, 2025, and an estimated completion of 120 hours0.00139 days <br />0.0333 hours <br />1.984127e-4 weeks <br />4.566e-5 months <br /> to complete the review. The estimated completion date remains the same (June 26, 2025), and the revised estimated completion hours has been changed from 120 hours0.00139 days <br />0.0333 hours <br />1.984127e-4 weeks <br />4.566e-5 months <br /> to 160 hours0.00185 days <br />0.0444 hours <br />2.645503e-4 weeks <br />6.088e-5 months <br />.

Thanks.

John

Hearing Identifier:

NRR_DRMA Email Number:

2760 Mail Envelope Properties (MN2PR09MB5084391E0997946352641129FA8E2)

Subject:

FYI - Farley 1 and 2 and Vogtle 1 and 2 - Proposed Inservice Inspection (ISI)

Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)

(L-2024-LLR-0041)

Sent Date:

5/5/2025 12:49:37 PM Received Date:

5/5/2025 12:49:00 PM From:

John Lamb Created By:

John.Lamb@nrc.gov Recipients:

"Joyce, Ryan M." <rmjoyce@southernco.com>

Tracking Status: None "Sparkman, Wesley A." <wasparkm@southernco.com>

Tracking Status: None "Johnston, Jeanne D." <jeajohns@southernco.com>

Tracking Status: None Post Office:

MN2PR09MB5084.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 973 5/5/2025 12:49:00 PM Options Priority:

Normal Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date: