ML25125A079
| ML25125A079 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 05/05/2025 |
| From: | Moore L NRC Region 4 |
| To: | Kunzli H, Mccoy J - No Known Affiliation |
| References | |
| Download: ML25125A079 (1) | |
Text
From:
Lee Moore To:
McCoy, Jack; Kunzli, Hayley
Subject:
RFI for River Bend Station EP Program Inspection (July 2025)
Date:
Monday, May 5, 2025 8:09:00 AM Attachments:
RFI for RBS EP Program Insp July 2025.pdf Mr. McCoy, Mrs. Kunzli, This e-mail serves to transmit a request for information to support and prepare for the Emergency Preparedness (EP) Program inspection at River Bend Station scheduled to occur the week of July 14, 2025.
By design, the biennial EP Program inspection includes the use of Inspection Procedures (IP) 71114.02, 71114.03, 71114.04, 71114.05 and 71151, to assess the overall health and maintenance of the stations EP program. Details of the requested materials are included in the attachment to this e-mail. If possible, please make the requested materials available to me in electronic format using the online document portal of the stations choice, by the dates stated within the attachment. If you are unable to complete the request by this date, please contact me at the phone number listed below to discuss alternative options.
This letter/e-mail does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget under control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
This email and its enclosures will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Lee M. Moore, P.E.
Emergency Preparedness Inspector US Nuclear Regulatory Commission, Region IV (817) 200-1147 Lee M. Moore, P.E.
Emergency Preparedness Inspector US Nuclear Regulatory Commission, Region IV (817) 200-1147 ADAMS Accession # ML25125A079
Request for Information for EP Program and Performance Indicator Verification Inspection Docket 05000458 (River Bend Station) Inspection Report 2025003 Inspection Procedures 71114.02, 71114.03, 71114.04, 71114.05 and 71151 In-Office Review: June 16 - July 11, 2025 Onsite/Inspection Week: July 14 - 18, 2025 Document Requests (by the IP they support) - Make preparation documents available by June 16, 2025. For the preparation documents, please provide them for the period August 18, 2023 - June 13, 2025.
o 71114.02 Alert & Notification System Testing
Copy of the FEMA approved ANS design report and any approved modification packages (make the most current report revision available electronically; making older report revisions available during the onsite week is acceptable)
List showing any ANS changes since last program inspection, including a short change description
Copies of primary and backup ANS testing and maintenance procedures o
71114.03 ERO Staffing and Augmentation Systems
Provide a copy of the procedure(s) for primary and backup ERO callout methods
Provide copies of the quarterly ERO tests o
71114.04 EAL and Emergency Plan Changes
Provide a copy of the 50.54(q) procedure (all revisions in effect during the time period
Provide a copy of the 50.54(q) evaluations performed during the time period
Provide a listing of the 50.54(q) screens performed during the time period o
Provide copies of all drill reports (on-and off-site). Include any stand-alone drills such as medical drills, ambulance, etc., for the time period
Provide a copy of the annual ETE surveillance reports generated during the time period
Provide corrective action program procedure(s)
Provide copies of any internal and external assessments (except INPO) for the time period. Include 50.54(t) assessments and any reviews of MOUs.
Provide a list of the Work Orders associated with corrective maintenance for E-Plan related equipment for the time period
Provide a Condition Report (CR) report for all EP CRs for the time period
Provide a copy of any site QA audits/assessments for the time period (have audit checklists available during the week of onsite inspection)
Provide a copy of site QA annual/trimester reports applicable to the time period
Provide a copy of any tracking tools being used to ensure the site is meeting the eight-year drill and exercise cycle requirements specified in 10 CFR 50, Appendix E, Section IV.F.2.j.
o 71151 PI Verification ERO Participation and DEP 2nd quarter 2024 through 2nd quarter 2025 ANS Reliability 2nd quarter 2024 through 4th quarter 2024 ERFER 1st quarter 2025 through 2nd quarter 2025 Provide documentation used to determine the PI values available for us during the onsite week. Electronic files can be provided in advance if the licensee desires (optional).
In advance, provide us a list of the DEP opportunities used in developing the PI values. A sample of more supporting documentation about some of the opportunities will be requested when inspectors are onsite.
o General Requests Provide a copy of the Emergency Plan. Include revisions in effect for last two years.
Provide copies of the Emergency Plan Implementing Procedures.
Provide a copy of the on-shift ERO staffing analysis If there are any challenges or questions related to providing the requested materials, please contact the lead inspector (Lee Moore, phone: 817-200-1147), at the stations earliest convenience.
This request does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget under control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
This e-mail and its enclosures will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.