ML25121A288
| ML25121A288 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 05/01/2025 |
| From: | Joseph C Constellation Energy Generation |
| To: | Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation, Document Control Desk |
| Shared Package | |
| ML25121A287 | List: |
| References | |
| SVPLTR 25-0032 | |
| Download: ML25121A288 (1) | |
Text
Constellation May 1, 2025 SVPL TR 25-0032 U.S. Nuclear Regulatory Commission ATTN : Document Control Desk Washington, DC 20555-0001 Dresden Nuclear Power Station, Units 1, 2 and 3 Facility Operating License No. DPR-2 Dresden Nuclear Power Station 6500 North Dresden Road Morris, IL 60450 10 CFR 50.36a (a)(2)
Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos.50-010, 50-237, and 50-249
Subject:
Dresden Nuclear Power Station 2024 Radioactive Effluent Release Report The Radioactive Effluent Release Report for January through December 2024 for Dresden Nuclear Power Station (DNPS) is submitted in accordance with Sections 6.9.A.4 and 5.6.3, "Radioactive Effluent Release Report," of the DNPS Unit 1 and Units 2 and 3 Technical Specifications, respectively and 10 CFR 50.36a, "Technical specifications on effluents from nuclear power reactors."
Should you have any questions concerning this letter, please contact Daniel J. Murphy, Regulatory Assurance Manager, at (779) 231 -7 443.
Carolyne Joseph Site Vice President Dresden Nuclear P wer Station