ML25121A241

From kanterella
Jump to navigation Jump to search
News Release-III-25-008: NRC to Discuss 2024 Performance of Fermi Nuclear Power Plant
ML25121A241
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 04/10/2025
From:
Office of Public Affairs Region II
To:
References
News Release-III-25-008
Download: ML25121A241 (1)


Text

No: III-25-008 April 10, 2025

Contact:

Viktoria Mitlyng, 630-829-9662 Prema Chandrathil, 630-829-9663 NRC to Discuss 2024 Performance of Fermi Nuclear Power Plant Nuclear Regulatory Commission staff will discuss the 2024 safety performance of the Fermi nuclear power plant during an in-person open house April 17. The plant, in Newport, Michigan, is operated by DTE Electric Co.

The open house will be held from 2-3 p.m. Eastern time at the Carleton Branch Library Community Room, 1444 Kent St., in Carleton. The NRC will discuss its assessment of the plants 2024 performance. Staff responsible for plant inspection and oversight, including the resident inspectors based at the site, will be available to address any regulatory or technical questions and concerns.

The NRC determined that Fermi operated safely during 2024. All inspection findings and performance indicators were green or very low safety significance. As a result, the plant remains under the NRCs baseline level of oversight, which entails thousands of hours of inspection each year.

The NRC Reactor Oversight Process uses color-coded inspection findings and indicators to measure plant performance. The colors start at green and increase to white, yellow or red, based on the safety significance of the issues involved. Inspection findings or performance indicators with more than a very low safety significance trigger an increase of NRC oversight.

Plant inspections are performed by two NRC resident inspectors and inspection specialists from the agencys Region III Office in Naperville, Illinois.

The annual assessment letter for Fermi is available on the NRC website. Current performance information is also available on the NRC website and is updated on a quarterly basis.

P1TB1bA#y1 P T bA#y P1TB3bA#y1 P T 4bA#y P T 5bA#y P1TB6bA#y1 P1TB7bA#y1 P T 8bA#y