301 2B Exam Administrative Items
ML25113A216
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 04/23/2025
From:
NRC/RGN-II
To:
Virginia Electric & Power Co (VEPCO)
References
50-338/24-301, 50-339/24-301 50-338/OL-24, 50-339/OL-24
Download: ML25113A216 (1)


Text

ML25113A216

Form 2.1-1 Examination Preparation Checklist Facility: _North Anna________________________

Date of Examination: _8/5/24___

Developed by: Written:

Facility NRC

//

Operating:

Facility NRC Target Date*

Task Description Chief Examiners Initials

-240

1. Examination administration date confirmed (A.1-5). For NRC-prepared examinations, arrangements are made for the facility licensee to submit reference materials (B.4, C.4.g and F).

MD

-210

2. NRC examiners and facility licensee contact assigned (B.1 and C.1-3).

MD

-210

3. Facility licensee contact briefed on examination security and other requirements (D.4). As applicable, the facility licensee contact submits to the NRC any prescreened K/As for elimination from the written examination outline, with a description of the facility licensees prescreening process (ES-4.1 A.1.a and ES-4.1 B.2).

MD

-210

4. Reference material due for NRC-prepared examinations (F).

N/A

-210

5. Examination kick-off call held (C.4). The NRC sends the corporate notification letter (A.5).

MD

-195

6. Written examination outline developed by the NRC and sent to the facility licensee contact (must be on the examination security agreement) (B.2, ES-4.1 A.1.b and ES-4.1 A.2.a).

MD

-150

7. Operating test outlines and checklists due: Forms 1.3-1, 2.3-1, 3.2-1, 3.2-2, 3.3-1, and 3.4-1, as applicable (B.6). Facility licensee provides a draft operating test administration schedule to the NRC (B.18).

MD

-136

8. Operating test outlines reviewed by the NRC and feedback provided to the facility licensee (ES-2.3).

MD

-100

9. NRC-prepared examinations approved by the NRC supervisor and forwarded for facility licensee review (ES-2.3).

N/A

-75

10. Proposed examinations (written, JPMs, and scenarios, as applicable) and outline forms; quality checklists and supporting documentation (including Forms 2.3-2 and 2.3-4 and any Form 2.3-1, 1.3-1, and 3.4-1 updates); and reference materials due.

MD

-60

11. Preliminary waiver/excusal requests due (ES-2.2 E.1).

MD

-50

12. Written examination and operating test reviews completed (ES-2.3). The NRC supervisors authorization to proceed with the facility review granted (ES-2.3 D).

MD

-50

13. Examination review results discussed between the NRC and the facility licensee (B.14).

MD

-35

14. Examination preparatory week conducted by the NRC and the facility licensee (I).

MD

-30

15. Preliminary license applications, including any waiver/excusal requests, due (ES-2-2 C.1).

MD

-14

16. Final license applications, including any waiver/excusal requests, due and Form 2.2-1 prepared (ES-2.2 C and E).

MD

-7

17. Written examinations and operating tests approved by the NRC supervisor (C.9)

MD

-7

18. Facility licensee management feedback on the examination requested by the NRC supervisor (C.10).

MD

-7

19. Final applications reviewed; 10% of applications audited to confirm qualifications/eligibility (ES-2.2 G); and examination approval letter (Letter 2.3-1) and waiver/excusal letters sent.

MD

-7

20. Written examination administration guidelines reviewed with the facility licensee (D.14).

MD

-7

21. Approved scenarios and job performance measures distributed to NRC examiners (D.12).

MD

  • Target dates are based on facility licensee-prepared examinations and the examination date identified in the corporate notification letter. These dates are for planning purposes and may be adjusted in coordination with the facility licensee.

SIGN

Form 5.1-1 Postexamination Check Sheet Postexamination Check Sheet Facility: North Anna Dates of Examination: August 5 - 16, 2024 Activity Description Date Complete

1. *Received postexamination package from facility licensee and verified complete. (ES-4.4) 11/6/24
2. *Reviewed and incorporated any necessary facility and applicant written examination comments. NRC grading of written examination completed. (ES-4.4) 11/6/24
3. *Reviewed and incorporated any necessary facility and applicant operating test comments. NRC grading of operating test completed.

(ES-3.6) 12/2/24

4. *Completed NRC chief examiner review of operating test and written examination grading. (ES-3.6 and ES-4.4) 12/2/24
5. Completed licensing official review.

12/3/24

6. Mailed licenses, preliminary results, and pass letters.

12/4/24

7. Notified facility licensee of results.

12/4/24

8. Issued the examination report (refer to Operator Licensing Manual Chapter (OLMC) 510, Operator Licensing Examination Reports).

12/23/24

9. Returned reference material after final resolution of any informal NRC staff reviews, hearing demands, or both.

N/A

10. Performed examination recordkeeping activities (refer to OLMC 520, Operator Licensing Examination Records and Documentation, and Management Directive 3.53, NRC Records and Document Management Program).

4/22/25

  • Activity may not be applicable for a retake examination. If this activity does not apply, place an N/A in the Date Complete column.

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 March 5, 2024 Laµra Dudes, Regional Administrator United States Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 Serial No.24-068 NAPS/RAP Docket Nos.

50-338 50-339 License Nos.

NPF-4 NPF-7 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION ENERGY VIRGINIA)

NORTH ANNA POWER STATION UNITS 1 AND 2 SUBMITTAL OF OPERA TING TEST OUTLINE AND SUPPORTING REFERENCE MATERIALS

Dear Ms. Dudes,

NRC letter dated January 11, 2024, North Anna Power Station - Notification of Licensed Operator Initial Examination, requested transmittal of the operating test outline and supporting reference materials identified on Farm 2.1-1 (Examination Preparation Checklist) in section ES-2.1 by 03/08/2024. The proposed written and operating examinations, along with the supporting reference material will be due by 05/22/2024. The timely submittal will

  • support the initial reactor operator and senior. reactor operator test scheduled to be
  • administered during the. weeks of 08/05/2024 and 08/12/2024. The written examination is scheduled to be administered on 08/21/2024.
  • This letter is to inform you that the ii:,itial license operating test outlines and Forms 1.3-1, 2.3-1, 3.2-1, 3.2-2, 3.3-1, 3.4-1 along with a draft operating test administrative schedule were transmitted to and received by Mr. Michael Donithan, NRC Chief Examiner, on 02/28/2024.
  • We request that the materials submitted to the NRC be withheld from public disclosure for 2 years after the operator-examinations have been administered.

If you have any questions or require additional information, please contact Mr. Andrew Lee Brust at (540)-894-2413~

Very. truly yours,

~ilqdr Site Vice President Commitments:

  • None tavo2-7E/-/*2 jilll\\

((_ a iJ - ti

copy: Mr. Thomas A. Stephen Chief, Operations Branch 1 Serial No.24-068 Docket Nos. 50-338/50-339

p. 2 of 2 United States Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 Document Control Desk United States Nuclear Regulatory Commission.

Washington, D.C. 20555-0001 Senior Resident Inspector North Anna Power Station

From:

Mike Donithan To:

Andrew.L.Brust@dominionenergy.com

Subject:

RE: 75-day Examination Submittal Date:

Wednesday, May 22, 2024 1:56:00 PM

Andrew,

All the requirements for the 75-day examination submittal are met.

Referring to Form 2.1-1, Examination Preparation Checklist, Block 10, youve provided:

Proposed operating test Administrative JPMs for RO and SRO Simulator JPMs In-Plant JPMs Proposed written exam with supporting documentation 75 RO questions 25 SRO questions Forms 1.3-1, Examination Security Agreement (updated) 2.3-1, Examination Outline Quality Checklist 2.3-2, Operating Test Quality Checklist 2.3-4, Written Examination Quality Checklist (2) 3.2-1s for Administrative JPMs (3) 3.2-2s for Control Room/In-Plant JPMs (4) 3.3-1s for Simulator Scenario Outlines 3.4-1, Events and Evolutions Checklist Cover Letter signed by the site VP

Thank you for your thoroughness and excellent attention to detail!

Very Respectfully, Mike Donithan Chief Examiner

From: Andrew.L.Brust@dominionenergy.com <Andrew.L.Brust@dominionenergy.com>

Sent: Tuesday, May 21, 2024 1:30 PM To: Mike Donithan <Michael.Donithan@nrc.gov>

Subject:

[External_Sender] Exam Uploaded

Mike,

I just finished uploading all of the documents for the -75 day submittal. If possible, can you please let me know that all requirements for the -75 day submittal have been met? Thanks!

Andrew Brust ILT Instructor

North Anna Power Station (O) 540-894-2413

CONFIDENTIALITY NOTICE: This electronic message contains information which may be legally confidential and or privileged and does not in any case represent a firm ENERGY COMMODITY bid or offer relating thereto which binds the sender without an additional express written confirmation to that effect. The information is intended solely for the individual or entity named above and access by anyone else is unauthorized. If you are not the intended recipient, any disclosure, copying, distribution, or use of the contents of this information is prohibited and may be unlawful. If you have received this electronic transmission in error, please reply immediately to the sender that you have received the message in error, and delete it. Thank you.

From:

todd.fulton@dominionenergy.com To:

Mike Donithan Cc:

Andrew.L.Brust@dominionenergy.com

Subject:

[External_Sender] NAPS NRC Exam, Post Exam Package Date:

Wednesday, November 6, 2024 9:47:58 AM Attachments:

image001.png image002.png

Mr. Donithan,

The following NUREG 1021 post exam package items have been uploaded for the Initial License Examination that was administered from 10/21/2024 to 10/30/2024:

1) Applicant's original written examination answer sheet and one clean copy
2) Master RO/SRO exam and answer keys
3) Candidate questions during the written examination
4) All examination administration comments and post examination review comments
5) Seating chart
6) Written examination performance analysis
7) Form 1.3-1 (to be uploaded by close of business Monday, 11/18/2024)

We request that all examination material be withheld from the ADAMS database for the allowable 2 year period.

Thank You Todd

Todd Fulton Supervisor Operations Training Dominion Energy North Anna Power Station (540) 223-1635 (540) 903-1112

Give Me Details

I never knew what freedom was until I saw you lose yours.

~Ronald Reagan

No one has ever learned to jump higher by lowering the bar.

~Shelby Steele

CONFIDENTIALITY NOTICE: This electronic message contains information which may be

legally confidential and or privileged and does not in any case represent a firm ENERGY COMMODITY bid or offer relating thereto which binds the sender without an additional express written confirmation to that effect. The information is intended solely for the individual or entity named above and access by anyone else is unauthorized. If you are not the intended recipient, any disclosure, copying, distribution, or use of the contents of this information is prohibited and may be unlawful. If you have received this electronic transmission in error, please reply immediately to the sender that you have received the message in error, and delete it. Thank you.