ML25113A077

From kanterella
Jump to navigation Jump to search
Changes to Security Plan, Training and Qualification Plan, Safeguards Contingency Plan
ML25113A077
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 03/31/2025
From: Currier B
Northern States Power Company, Minnesota, Xcel Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-Pl-25-012
Download: ML25113A077 (1)


Text

THE ENCLOSURES TO THIS LETTER CONTAIN "SAFEGUARDS INFORMATION." UPON SEPARATION OF THE ENCLOSURES, THIS LETTER IS "DECONTROLLED."

fl Xcel Energy March 31, 2025 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Prairie Island Nuclear Generating Plants, Units 1 and 2 Docket Nos. 50-282 and 50-306 Renewed Facility Operating License Nos. DPR-42 and DPR-60 1717 Wakonade Drtve Welch, MN 55089 L-Pl-25-012 10 CFR 50.54(p)(2)

Changes to the Prairie Island Nuclear Generating Plant Security Plan, Training and Qualification Plan, Safeguards Contingency Plan Pursuant to the requirements of 10 CFR 50.54(p), Northern States Power Company-Minnesota (NSPM) doing business as Xcel Energy submits, Revision 14 of the Prairie Island Nuclear Generating Plant Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, here after referred to as the Security Plan. The changes were effective on February 25, 2025.

A summary of changes is provided in Enclosure 1. The revised Security Plan is provided in. In accordance with 10 CFR 73.21, the information contained in the Enclosures should be withheld from public disclosure as it is classified as Safeguards Information.

Please contact Mr. Kurt Gosney at 763-295-1037, if you have any questions related to this submittal.

SAFEGUARDS INFORMATION." UPON SEPARATION OF THE ENCLOSURES, THIS LETTER IS "DECONTROLLED."

THE ENCLOSURES TO THIS LETTER CONTAIN "SAFEGUARDS INFORMATION." UPON SEPARATION OF THE ENCLOSURES, THIS LETTER IS "DECONTROLLED."

L-Pl-25-012 Page 2 of 2 Summary of Commitments This letter makes no new commitments and no revisions to existing commitments.

~L 0

Bryan Currier Plant Manager, Prairie Island Nuclear Generating Plant Northern States Power Company - Minnesota cc:

Administrator, Region Ill, USNRC Project Manager, Prairie Island, USNRC (without Enclosures)

Resident Inspector, Prairie Island, USNRC (without Enclosures)

SAFEGUARDS INFORMATION." UPON SEPARATION OF THE ENCLOSURES, THIS LETTER IS "DECONTROLLED."