Notification of Target Set Inspection and Request for Information NRC Inspection Report No. 05000348/2025404 and 05000364/2025404
ML25111A075
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 04/23/2025
From: Jannette Worosilo
NRC/RGN-II/DFRSS
To: Dean E
Southern Nuclear Operating Co
References
IR 2025404
Download: ML25111A075 (1)


See also: IR 05000348/2025404

Text

Edwin D. Dean

Site Vice President

Joseph M. Farley Nuclear Plant

Southern Nuclear Operating Co., Inc.

7388 North State Highway 95

Columbia, AL 36319-0470

SUBJECT:

FARLEY NUCLEAR PLANT UNITS 1 & 2 - NOTIFICATION OF TARGET SET

INSPECTION AND REQUEST FOR INFORMATION (NRC INSPECTION

REPORT NO. 05000348/2025404 AND 05000364/2025404)

Dear Edwin Dean:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region II (RII) staff will conduct an inspection of the Target Sets specified by the conditions of

your operating license at the Farley Nuclear Plant Units 1 & 2 on July 15 - 17, 2025. The

inspection team will be led by Mr. William Monk, Sr. Reactor Inspector, and Mr. Roland

Womack, Sr. Physical Security Inspector both from the NRC RII office.

The inspection will be conducted in accordance with Inspection Procedure 71130.14, Review

of Power Reactor Target Sets, and effective as of March 9, 2023.

On April 17, 2025, during communications between Mr. Gene Surber of your staff, and Mr.

William Monk, NRC RII, our respective staff, confirmed arrangements for a three-day onsite

inspection. The schedule is as follows:

Onsite preparation / SGI review: July 15, 2025

Onsite inspection: July 16 - 17, 2025

William Monk and Roland Womack (Observing Inspector) will be onsite for three days during

the week and will arrive the morning of Tuesday July 15, 2025. The first day will be

preparation time to review SGI material onsite. The following day the team will conduct an

entrance meeting at the sites request in the morning and exit meeting the following Thursday

afternoon, unless there is an emergent issue which would either delay the exit or be cause for

it to take place over the phone. Due to the security related nature of the inspection, we

request a conference room that is SGI accessible.

In order to complete the inspection in the time allotted, Mr. Monk needs to review your non-

SGI target sets program references and other pertinent documents prior to the inspection.

Please provide the non-SGI documents listed below via email or CERTREC upload by June

27, 2025.

April 22, 2025

E. Dean

2

Please indicate how you would like our staff to dispose of any SGI documents after we have

completed our review. Mr. Monk and Mr. Womack plan to only review SGI material onsite in

your secure spaces and return materials to your staff at the end of each day. The types of

documents the team will be reviewing during the conduct of the inspection are listed below.

Please contact Mr. Monk at (404) 997-4579 prior to preparing copies and sending/uploading the

files if there are any questions. The inspection team will try to minimize your administrative

burden by specifically identifying those documents required for inspection preparation.

Provide the following Target Set Program documents:

All non-SGI procedures that relate to the Target Set identification, maintenance,

and development

Site Target Sets (ready for review once onsite)

List of the Target Set Expert Panel members (names, qualifications, and positions)

Response to security event operations procedure

Any procedure listed as a credited operator manual action (OMA) in the target sets

Results of the last two target set expert panel reviews (i.e., meeting minutes)

Corrective action program (CAP) procedures and condition reports (CRs)

associated with Target Sets and the program since the last triennial target set

inspection (last 3 years)

A list of any issue/condition reports since the last target set inspection (3

years) directly related to Target Sets and/or the Safety/Security interface

Any design change packages or modification packages that affected Target Sets

A summary or list of any changes that have occurred to the Target Sets since the

last inspection

A copy of the sites Safety / Security Interface procedure

Items needed during the Target Inspection Week:

Access to all NON-SGI and SGI procedures related to Target Sets

Site Target Sets, Protective Strategy, Contingency Plan (ONSITE REVIEW)

A point of contact knowledgeable in Target Sets and the protective defensive

strategy

We will require a meeting with Target Set knowledgeable personnel

(including operations) to discuss target set content

We will keep the requested information only as long as it is necessary to complete the

inspection activity. Additionally, if you feel that any requested documents would contain

proprietary or company sensitive information, please make sure they are appropriately

marked and attached to an appropriate affidavit for withholding in accordance with 10 CFR

2.390.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number 3150 -

0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,

of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available

electronically for public inspection in the NRCs Public Document Room or from the Publicly

E. Dean

3

Available Records (PARS) component of the NRC's Agencywide Documents Access and

Management System (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Your

cooperation and support during this inspection will be most appreciated. If you have questions

concerning this inspection, or the inspection team's information or logistical needs, please

contact Mr. Monk, the team leader, in the Region II Office at (404) 997-4579.

Sincerely,

Jannette Worosilo, Branch Chief

Nuclear Security Branch

Division of Fuels, Radiological Safety,

and Security

Docket Nos.: 50-348; 50-364

License Nos.: NPF-2; NPF-8

cc: Distribution via ListServ

Signed by Worosilo, Jannette

on 04/22/25

ML25111A075

X

SUNSI Review

X

Non-Sensitive

Sensitive

X

Publicly Available

Non-Publicly Available

OFFICE

RII/DFRSS

RII/DRS

RII/DRS

NAME

J. Worosilo

DATE

04/22/2025