Orano Enrichment USA IKE Enrichment Facility Pre-application Meeting - Electrical Distribution and Instrumentation and Control April 24, 2025 NRC Headquarters - Rockville, MD OPI 0 UNRESTRICTED

01 INTRODUCTION 02 ELECTRICAL DISTRIBUTION 03 INSTRUMENTATION AND CONTROL 04 ACTIVE ENGINEERED CONTROLS AS IROFS 05

SUMMARY

Introduction 01

OPI 0 UNRESTRICTED l IKE Enrichment Facility - Pre-application Meeting - Electrical Distribution and Instrumentation and Control 4

Orano Enrichment USA 01 Headquartered in Bethesda, MD, Orano USA is a leading supplier of advanced reactor services, nuclear fuel materials, used fuel management, decommissioning, decontamination, and radwaste treatment solutions to U.S. commercial and federal customers

  • Letter of Intent
  • Docket 70-7035
  • Kickoff meeting
  • Pre-application activities
  • Environmental Review
  • Safety and Safeguards Review
  • Issue Materials License Application Review 2026-2027
  • Site preparation
  • Facility construction
  • Pre-operation readiness review Build and Startup 2026-2031 Orano Enrichment USA, LLC, created to build, commission and operate the Chemistry and Enrichment Facilities in the US.

OPI 0 UNRESTRICTED l IKE Enrichment Facility - Pre-application Meeting - Electrical Distribution and Instrumentation and Control 5

IKE Program Facility planned for Idaho Falls, ID License Application accepted Materials License SNM-2015 Issued Project terminated due to low demand due to cancelled reactor projects Eagle Rock Enrichment Facility 01 Orano has initiated exclusive discussions to establish a future uranium enrichment facility at a Department of Energy-owned site in Oak Ridge, Tennessee.

Pre-application activities started IKE Enrichment Facility 2004 2008 2011 2014 2024 2025 IKE is comparable to EREF, and GBII is the reference plant in operation in France since 2011 EREF GB II

OPI 0 UNRESTRICTED l IKE Enrichment Facility - Pre-application Meeting - Electrical Distribution and Instrumentation and Control 6

Meeting Objectives

  • Explain the design criteria for electrical power supply for IKE Enrichment Facility
  • Explain instrumentation and control design criteria for IKE Enrichment Facility
  • Understand acceptance criteria for use of instrumentation and control technology used in a fuel cycle facility.
  • Understand how modernization of NRCs I&C regulatory infrastructure for transition from analog to digital systems may affect fuel cycle facility design of Items Relied on For Safety (IROFS)
  • Learn from recent fuel cycle facility license application reviews of electrical distribution and I&C 01 Focus on Electrical System and I&C for IKE Enrichment Facility

OPI 0 UNRESTRICTED l IKE Enrichment Facility - Pre-application Meeting - Electrical Distribution and Instrumentation and Control 7

Project Team

Lionel Antognelli, VP Engineering and Projects

Peter Vescovi, Licensing Manager

Faris Badwan, Quality and Safety Manager

Brian Mekdeci, Lead Safety System Engineer

Matt Lang, Safety System Engineer

Dana Kim, Advisory I&C Engineer

David Anderson, I&C Engineer 01 Orano Enrichment USA is a large multi-discipline project team working on design and licensing of IKE Enrichment Facility.

Participants in Electrical Power and I&C Pre-application meeting

Questions and Answers 01